Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on May 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025 Stormwater Project, Sealcoat Ditch Restoration

Closed
1488State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 12 hours ago

DEADLINE

in 12 days
NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The SportsOhio PowerPlay Demolition project, identified as solicitation 26-037-CIP, is a City of Dublin, Ohio, contract for the demolition and restoration of specific areas at 6314 Cosgray Road. The scope of work includes the removal of the Can-Am/go cart track, batting cages, a concrete seating pad, associated walkway connections, and a mini golf course. The project has an engineer's estimate of $259,606.50 and must be completed by April 30, 2027. Key technical requirements include adhering to the 2026 City of Dublin and City of Columbus Construction and Material Specifications, following National Electric and Safety Codes, and ensuring tree clearing occurs specifically between October 1 and March 31. Bids are submitted via Bid Express and are evaluated based on a lowest and best analysis, with a strong preference for Ohio-based bidders or those from reciprocal border states. Qualified bidders must provide a bid guaranty per the Ohio Revised Code, evidence of similar experience, and a noncollusion affidavit. The contract mandates the payment of prevailing wages and requires the use of domestic source end products. Payment is structured monthly at a rate of 95% until the work is 50% complete, after which the retention amount may be reduced at the City's discretion. All inspections are managed by the City of Dublin, though the contractor must coordinate utility abandonment inspections with AEP, Columbia Gas, and other communications companies.
City of Dublin, OH - Engineering

POSTED

about 14 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The City of Moline is inviting bids for the 2025 Stormwater Project, Sealcoat Ditch Restoration, which involves installing storm sewer infrastructure and re-ditching along 29th Avenue west of 7th Street. The scope includes laying 12-inch A2000 storm sewer pipes, installing Nyloplast drainage structures, and performing excavation, paving, and patching work, with the entire project to be completed within 25 working days. The project emphasizes adherence to prevailing wages as mandated by Illinois law and requires electronic bid submissions through the IONWAVE platform, with the bid opening scheduled for May 27, 2025, via a virtual meeting link. The contract size is estimated between $500,000 and $1.5 million, and the primary contact for inquiries is Laura Klauer. The bidding process is structured to ensure compliance with specific submission protocols, including electronic documentation and participation in a virtual bid opening. The project’s details, including scope, timeline, and submission requirements, are clearly outlined, with the goal of selecting a qualified contractor to complete the stormwater improvements efficiently. The comprehensive nature of the project and the detailed bidding instructions highlight the City’s commitment to transparency and adherence to legal wage standards, ensuring that the selected contractor meets all regulatory and technical specifications for successful project execution.

General Info

Place of Performance

IL, USA

Set-Aside

NONE

Documents

17

2023 Moline Supplemental Specifications

PDF, High priority: read this firstsupplemental-specifications
High

City of Saint Paul RFP Instructions for Suppliers

PDF, High priority: read this firstrfp-instructions
High

City of Saint Paul Vendor Outreach Program Ordinance and Good Faith Effort Standards

PDF, High priority: read this firstspecifications
High

EVENT 1487 Robert Street Reconstruction Project RFP

PDF, High priority: read this firstrfp
High

Job 1488: 2025 Stormwater Project, Sealcoat Ditch Restoration

PDF, High priority: read this firstitb
High

Moline CCDD Requirements - Special Provision Sept 2023

PDF, High priority: read this firstspecial-notice
High

Moline Insurance Requirements - Engineering Department Sept 2023

PDF, High priority: read this firstinsurance-requirements
High

Project # 1488 – 2025 Stormwater Project, Sealcoat Ditch Restoration Bidding Instructions

PDF, High priority: read this firstifb
High

AAEEO Contract Specifications 2023 - City of Saint Paul

PDF, Low priority4 pages · other
Low

City of Moline - Section 1488 Bid Bond Form

PDF, Low prioritybid-bond-form
Low

City of Saint Paul Bid Protest Procedures for Procurements $175,000 and Over

PDF, Low priority2 pages · other
Low

City of Saint Paul Supplier Portal Password Reset Instructions Sept 2022

PDF, Low priority2 pages · other
Low

How to Access the Current CERT Directory Instructions 2021-10-07

PDF, Low priority1 page · other
Low

How to Modify an Event Response Instructions

PDF, Low priority6 pages · special-notice
Low

How to Respond to an Event - Supplier Portal Instructions

PDF, Low priority14 pages · special-notice
Low

Supplier Portal Registration Instructions 2023

PDF, Low priority9 pages · other
Low

Robert Street RFP Map.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Oct 30, 2024 to May 27, 2025. The notice title changed. NAICS code changed from 561599 to 238910. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → City of Moline
Contacts1 person available
OfficeN/A
Organization / AgencyIllinois → City of Moline
Office AddressN/A

Full Description

Show more
The City is seeking bids for Job Number 1488 - 2025 Stormwater Project, Sealcoat Ditch Restoration.
This project consists of storm sewer installation and re-ditching of 29th Avenue, west of 7th Street in Moline. Work includes installation of 12" A2000 storm sewer, Nyloplast drainage structures, furnished excavation, HMA and PCC driveway pavement, Class D patching, and other related work.  
As per 820 ILCS 130/1, prevailing wages shall be required for this project.
The Contractor will be given 25 working days to complete the project.
Bidding will take place solely through IONWAVE's website. Vendors must log in to the ebidding system to submit a bid. All documents must be submitted electronically by the bid opening on Tuesday, May 27th, 2025 at 11:00 AM CST.
The bid opening will be held virtually, through the City's RingCentral system. The link to access the virtual bid opening is included here:
Video & Audio: https://meetings.ringcentral.com/j/1479715533 Audio only: US: +1(720)9027700 (US Central) Meeting ID: +1 (555) 000-0000

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS