Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on March 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025 Street Resurfacing Program

Closed
2025-0007State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The 2025 Street Resurfacing Program in Bettendorf, Iowa, involves comprehensive roadway improvements including rotomilling, pavement removal, installation of granular subbase, and resurfacing with Hot Mix Asphalt across various streets. The project also encompasses the construction of storm sewer systems, curbs, gutters, driveways, and sidewalks, with all work adhering strictly to the plans and specifications provided by the city's Engineering Division. Prior to commencement, contractors must submit a detailed work schedule highlighting critical tasks such as curbing, milling, patching, and surface courses, which requires approval from the Engineer. Construction is scheduled to begin on or after April 21, 2025, weather permitting, and must be completed within 150 days, by September 26, 2025, with liquidated damages of $500 per day for delays beyond the deadline. Bidders are required to submit their proposals exclusively through the City of Bettendorf’s eBidding system, with no alternative submission methods accepted. The contract emphasizes coordination and timely execution, particularly noting that sidewalk and boxout construction must commence within seven days following street resurfacing. The project is managed under the NAICS code 237310 and is organized by the Iowa Department of Transportation, with primary contact being Pat Lynch. The total contract value ranges from $500 to $500, and detailed project information can be accessed through the city’s online portal.

General Info

Place of Performance

IA, USA

Set-Aside

NONE

Documents

4
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstrfp
High

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Dec 17, 2024 to Apr 8, 2025. The notice title changed. NAICS code changed from 238220 to 237310. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa → IA
Contacts1 person available
OfficeN/A

Full Description

Show more
The proposed improvements consist of rotomilling, pavement removal, installing granular subbase, resurfacing various streets with Hot Mix Asphalt (HMA), constructing storm sewer, curb and gutter, driveways and sidewalks, and other related work within the City of Bettendorf, Iowa. Before the start of construction, the Contractor shall submit a line of march and schedule of his work listing critical path items. The list of items shall include curbing, headers, milling, patching, casting adjustment, surface course, base course and other items, as required, to establish a time schedule for the program. No work shall start on any street without the approval from the Engineer or his representative. The construction of sidewalks and boxouts shall begin within seven (7) calendar days after street resurfacing and be completed in a timely manner. All work shall be done in strict compliance with the plans and specifications prepared by the Engineer of the Engineering Division of the Public Works Department of Bettendorf, Iowa. All work on this contract shall commence on or after April 21, 2025, as weather permits. All work on this contract shall be completed within 150 calendar days from the agreed upon start date, or by September 26, 2025, whichever comes first. The beginning and completion dates will be included in and made part of the contract between the successful bidder and the City. Liquidated damages in the amount of Five Hundred Dollars and no/100 ($500.00) per calendar day shall be charged for every day past the completion date. Vendors must log in to the City of Bettendorf eBidding system in order to submit a bid; no emails, no faxes, no paper copies or any other method will be accepted.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS