Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on October 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025 Water Main and PRV Improvements, Cross Valley Water District, Snohomish, WA #W-2025-01

Closed
W-2025-01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
Cedar Creek Section 2 Phase 2 Pipeline Replacement
Solicitation # 26-170
The Tarrant Regional Water District (TRWD) is soliciting proposals for the Cedar Creek Section 2 Phase 2 Pipeline Replacement Project, identified as solicitation 26-170. The project involves replacing approximately 4.4 miles of 72-inch prestressed concrete cylinder pipe with new welded steel raw water transmission pipelines ranging from 72 to 102 inches in diameter. The work extends from Mouser Way to the Kennedale Balancing Reservoir in southeast Tarrant County, Texas, and will be executed within a 130-foot-wide easement. The scope includes the use of open-cut and trenchless construction methods, including two new tunnel installations and the reuse of an existing casing for TxDOT and Union Pacific Railroad crossings. Additional requirements include the installation of air release, blow-off, and butterfly valves, as well as the abandonment or removal of existing facilities. The contract will be awarded based on best value, with evaluation criteria weighted across proposed price and timeline (40 points), project approach (20 points), offeror experience (20 points), and key personnel qualifications (20 points). Bidders must provide a bid bond and comply with Texas Government Code requirements, including the payment of prevailing wages and the provision of performance and payment bonds. Proposals are due by December 10, 2026, via the OpenGov electronic bidding system. The selected contractor will be required to implement a comprehensive Quality Control Plan and utilize a designated online project management information system for all documentation and communications with the TRWD project team.
Infrastructure Engineering

POSTED

about 2 hours ago

DEADLINE

in 27 days
NAICS: 237110
New
SLED
San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation
Solicitation # 26-NIIB-052
The West County Wastewater District is soliciting bids for the San Pablo Dam Road 24 inch ACP CIPP Trunk Line Rehabilitation project, solicitation number 26-NIIB-052. The project involves the rehabilitation of a 24 inch ACP Class 5000 trunk sewer between manholes MHM17105 and MHM17106, where a previous liner has failed. The selected contractor will install approximately 420 linear feet of Cured-in-Place Pipe (CIPP) liner. To minimize impacts on traffic and sewage flow, construction must be performed during nighttime hours. Key deliverables include the liner installation, post-installation CCTV inspection videos, as-built drawings, and the acquisition of a Contra Costa County Encroachment Permit. The project is expected to be completed within 30 to 45 calendar days of the Notice to Proceed. The contract will be awarded to the lowest responsible bidder based on the total bid price and satisfactory qualifications. Bidders must submit a comprehensive package by November 13, 2026, including a bid form, a 5 percent bid security, a non-collusion declaration, a disqualification questionnaire, and a CARB In-Use Off-Road Diesel-Fueled Fleet Rules certification. Additionally, contractors must provide a statement of qualifications, a designation of subcontractors for work exceeding 0.5 percent of the total, and proof of DIR registration and CSLB licensing. The successful contractor is required to provide payment and performance bonds, adhere to California prevailing wage rates, and employ a project manager, on-site superintendent, and a designated safety representative.
Infrastructure and Planning

POSTED

about 3 hours ago

DEADLINE

in about 3 hours

AI Contract Overview

Show more

The 2025 Water Main and PRV Improvements project, issued by the Cross Valley Water District in Snohomish, Washington, involves comprehensive infrastructure upgrades across five distinct sites designated as Schedules A through E. The project requires a single bid for all sites and focuses on the installation of ductile iron water mains and the modernization of pressure-reducing valve stations. Specifically, Schedules A, B, and C cover the installation of approximately 1,390 combined lineal feet of 4-inch diameter water main, including new water services, blowoff and air-vac assemblies, and necessary road restoration such as pavement sawcutting and gravel shoulder repair. Schedules D and E focus on critical valve infrastructure. Schedule D involves upgrading a pressure-reducing valve station at 88th Ave SE and 192nd Street SE, including the replacement of the vault top and the installation of a sump ejector assembly. Schedule E requires the replacement of a PRV vault, the installation of 60 lineal feet of 8-inch diameter water main, and various site improvements including a new block wall, storm drain components, and paving on Elliot Road. This solicitation, numbered W-2025-01, is managed by Peter Paulsen of Pace Engineers.

General Info

Cross Valley Water District project for water main and PRV infrastructure upgrades.

Documents

388
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Cross Valley Water District
Contacts1 person available
OfficeN/A

Interested Companies (18)

CalPortlandKenmore, WA
Colacurcio BrothersBLAINE, WA
Core & MainGilbert, AZ

See All 18 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
2025 Water Main and PRV Improvements - The project consists of five different project sites in unincorporated Snohomish County, designated as Schedules A-E. The work for all five sites is to be done as part of the project and they are to be bid together as one project.
Schedule A includes the installation of approximately 635 lineal feet of 4-inch diameter ductile iron (DI) water main in 78th Street SE from 79th Ave SE to the east, new water services, one blowoff assembly, one air-vac assembly, and one connection to the existing system.
Schedule B includes the installation of approximately 325 lineal feet of 4-inch diameter DI water main in 79th Ave SE from 74th St SE to the dead end to the north, new water service lines, air-vac and blowoff assemblies, as well as one connection to the existing system.
Schedule C includes the installation of approximately 430 lineal feet of 4-inch diameter ductile iron (DI) water main in a private drive to the south of 212th Street SE around the 9300 block, new water service lines, a blowoff assembly, and one connection to the existing system. Work covered by Schedules A – C also includes pavement sawcutting, trench patching, grind & overlay and gravel road and shoulder restoration.
Schedule D includes the upgrade of an existing pressure-reducing valve (PRV) station and its associated appurtenances at the intersection of 88th Ave SE and 192nd Street SE and involves replacement of vault top section and installation of a sump ejector assembly along with other improvements.
Schedule E includes the replacement of an existing PRV vault, roughly 60 lineal feet of new 8- inch diameter ductile iron water main, along with 12” spool, associated water appurtenances, (4) new water main connections, along with cutting in (2) new in-line valves, along with site improvements that include, but are not limited to a new block wall and storm drain catch basins and pipes, and grading and paving on Elliot Road near 102nd Ave SE.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS