Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 700 West Improvements Project

Closed
CIP 18-29-(26)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention and quality control. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must be invited through the Building Connected electronic system, with the bid deadline set for November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 237310
New
SLED
Jackson Ranch Road Rehabilitation RPL-5902(087)
Solicitation # 26-06
Solicitation 26-06 is a unit price contract issued by the County of Siskiyou Department of Public Works for the rehabilitation of 5.017 miles of Jackson Ranch Road (Co. Rd. #4L08), extending from Mile Post 0.00 to Big Springs Road in Yreka, California. The project scope includes the pulverization of existing asphalt concrete and aggregate base, grading for design crown and superelevation, re-compaction, and the placement of 0.30 feet of Type A Hot Mix Asphalt Concrete in two lifts across a 24-foot width. Additional requirements include the installation of shoulder backing, two traffic inductive loop detectors, and traffic stripes and markings. Due to low R-Values, a cement additive will be applied from Mile Post 0.00 through 0.97. The estimated project cost is 3.4 million dollars, and work must be completed within 80 working days, though the project is expected to enter winter suspension immediately upon contract execution. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Evaluation is primarily based on Base Bid Schedule A, with an optional Additive Bid Schedule B that may be included at the agency's discretion based on available funding. Bidders must comply with 2025 Caltrans Standard Specifications and Standard Plans, as well as Buy America requirements and California state prevailing wage rates. Required submissions include performance and payment bonds, an Equal Employment Opportunity Certification, and various certifications under the California Public Contract Code. All work must be performed in accordance with the laws of the State of California, with the venue for any legal matters set in Siskiyou County.
County of Siskiyou, Department of Public Works

POSTED

about 4 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

This contract involves the installation of storm drain infrastructure, curb and gutter, sidewalk, and new half-width asphalt pavement along 700 West, spanning approximately from 11500 South to 11800 South. The work includes all necessary labor, materials, tools, and equipment as detailed in the project plans and specifications. Bid documents will be available on the Utah Public Procurement Place website by May 28, 2026, and submissions must be made electronically by June 11, 2026 at 2:00 PM. A 5% bid bond is required, and responses received after the deadline will not be accepted. Bid openings will be conducted promptly with preliminary results posted publicly within 24 hours, showing only the firms’ names and their total bids. Questions regarding the project scope or submission process must be submitted electronically through the procurement website by June 9, 2026. The project includes a strict deadline for signing and notarizing the construction agreement and ongoing rights-of-way acquisition efforts, so contractors must carefully review all additional bidding instructions. The city will not cover any expenses incurred prior to contract award and retains the right to reject any or all bids and waive irregularities as deemed advantageous. The primary contact for the solicitation is Dillon Bliler at Draper City, Utah.

General Info

Contract for storm drain, curb, sidewalk, asphalt installation on 700 West, bids due June 11, 2026.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

3

2026 700 West Improvements Project Request for Bids

PDF, High priority: read this firstrfb
High

2026 700 W Improvements Project Plans Draper Utah

PDF, High priority: read this firstplans
High

Draper City Specifications and Standard Details - General Conditions Construction Projects

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
Contacts
Dillon Bliler

Interested Companies (27)

Jordan Valley Construction
Gov AlphaBrooklyn, New York
ConstructConnectCincinnati, OH

See All 27 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The scope of this project will be to provide all the labor, materials, tools and equipment necessary to install storm drain infrastructure, curb and gutter, sidewalk, new half-width asphalt pavement, and other miscellaneous items along 700 West from approximately 11500 S to 11800 S as described in the project plans and specifications. Bid documents and specifications will be posted to the Utah Public Procurement Place (U3P), PURCHASING.UTAH.GOV on or before THURSDAY, MAY 28TH, 2026 at 2:00 PM. A 5% Bid Bond will be required. The Engineering Division will receive electronic responses on PURCHASING.UTAH.GOV until 2:00 PM on THURSDAY, JUNE 11TH, 2026. Responses received after this time will not be accepted. Responses will be opened by Draper City staff and will be promptly posted to the Utah Public Procurement Place (U3P) website within 24 hours of the above-stated time and date, with only the names of the firms submitting responses and their total bid amounts being presented. Preliminary bid results will be located within the Q&A section of the said project on U3P. Questions concerning the scope of work, response submittal, or process should be directed to us electronically through U3P before 2:00 PM on TUESDAY, JUNE 9TH, 2026. This project includes a strict deadline for signing and notarizing a construction agreement. It also involves an on-going right-of-way acquisition effort. Contractors must read the Additional Instructions to Bidders section for more details. The City is not responsible for expenses incurred prior to award by the City Council. Draper City reserves the right to reject any and all responses and to waive any irregularities, informalities, or technicalities deemed in the best interest of the City.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

2 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS