This Solicitation opportunity from Washington was posted on July 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2026 ADA Ramp Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Centralia has issued a public bid for the 2026 ADA Ramp Replacement Project under solicitation number PW 2026-15, with bidding open until July 30, 2026 at 3:00 PM. The project requires the removal of existing curbing, gutter, and sidewalk, followed by the installation of new sidewalks and pedestrian access ramps that fully comply with ADA standards, along with roadway striping removal and replacement, site restoration, and all other tasks detailed in the contract plans and city standards. All work must be completed by December 31, 2026. The engineer’s estimate for the project ranges between $325,000 and $400,000. Bidders must register to access documentation, and clarification questions must be submitted by July 28, 2026 at 5:00 PM. The bid is being managed offline and is issued under a public solicitation type with no set-aside provisions. Primary contact for inquiries is Patty Page, PE, City Engineer, reachable at ppage@cityofcentralia.com or (360) 330-7512.
General Info
Agency
NAICS
Place of Performance
WA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER PW 2026-15 TITLE 2026 ADA Ramp Replacement Project AVAILABLE DATE 7/13/2026 2:45 PM CLARIFICATION DEADLINE 7/28/2026 5:00 PM DUE DATE 7/30/2026 3:00 PM CONTACT INFORMATION
Patty Page, PE
City Engineer
ppage@cityofcentralia.com
(360) 330-7512
BID TYPE Public DESCRIPTION
This project includes removal of existing curbing, gutter and sidewalk, installation of sidewalk, pedestrian access ramps that meet ADA standards, removal and replacement of roadway striping, restoration, and other work all in accordance with the contract plans, contract provisions and City of Centralia Standards. All work shall be completed by December 31, 2026.
Engineer's Estimate: $325k to $400k
