Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 All Gender Restrooms

Closed
2026-RFB-020State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring and electrical distribution, implementing simple dimming controls, replacing ballasts, lamps, and ceiling fans, and replacing variable air volume systems. The project also requires correcting plumbing deficiencies and ensuring all work adheres to ADA accessibility guidelines and seismic-resisting system standards. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to prevailing wage rates. Key administrative requirements include submitting submittals within 14 days of award, providing a comprehensive safety plan, and managing all construction and demolition waste.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additional requirements include the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, as well as site improvements such as paving, drainage upgrades, and hazardous materials abatement. The work is divided into two primary pricing line items: building renovation and the removal and replacement of paving. The contract has an estimated value between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price. Bidders must submit responses by November 23, 2026, and an optional pre-bid meeting is scheduled for November 2, 2026. The project mandates strict adherence to quality control through a three-phase control process and requires a Contractor Quality Control Plan approved by the Contracting Officer. Bonding requirements are tiered, with proposals over 150,000 dollars requiring bid, payment, and performance bonds. Compliance with the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines is mandatory. Invoicing must be processed through Wide Area Work Flow using NAVFAC Form 4330/54.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 28, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Efforts (GFE) to secure project financing. Bidders must complete six specific GFEs prior to the bid opening date to avoid being deemed non-responsive. Mandatory requirements include providing proof of public notification via an online publication for 30 consecutive days and a print newspaper for one day, as well as evidence of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA). While outreach documentation such as call logs and emails may be submitted up to three business days after the closing date, failure to include the required publicity and agency assistance proof within the initial bid package will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of mechanical, electrical, and underground stormwater retention systems. An additional option for the P1016 Consolidated RDT&E Systems Facility includes the construction of a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. This solicitation is set aside for various small business categories and requires adherence to Davis Bacon Wage Rates, while remaining exempt from sales tax. Bidders must provide pricing across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, and plumbing, with responses due by November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and necessary electrical and vanity/cabinet repairs. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, EPA, and local Massachusetts building codes. The contract is a small business set-aside and requires a single lump sum bid, though the lowest price does not guarantee an award. Evaluation is based on best value, weighted by price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submissions include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a Massachusetts contractor's license, and wage rate certification. The contract is subject to the Davis-Bacon Act and Executive Orders regarding minimum wage and paid sick leave. Contractors must provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30. Key deliverables include a sequenced construction schedule due within 14 days of the Notice to Proceed and a final punch list to be corrected within 14 days of the substantial completion walk-through.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, including sixteen residential rooms and bathrooms, common areas, and mechanical and utility rooms. The scope of work involves drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance and equipment clearances are maintained throughout the process. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan including project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include providing payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the successful testing of restored mechanical, plumbing, electrical, and life-safety systems, the removal of all debris, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 6 hours ago

DEADLINE

in 22 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut, involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, foundations with rigid inclusions and load transfer mats, reinforced concrete floors, and comprehensive grounding, lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and buildings 524 and 393. Site work encompasses clearing, rock excavation, grading, fill, and the mitigation of impacts on existing wetlands. Infrastructure improvements include access roads, paved loading areas, landscaping, and a full electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is issued by J & J Contractors, Inc., with a project duration of 1828 calendar days. The opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The District, part of the California Community College System and serving over 23,000 students annually through its Stockton Main Campus, South Campus at Mountain House, and Manteca Center, is soliciting bids for the construction of all-gender restrooms under solicitation number 2026-RFB-020, with a response deadline of June 25, 2026. The project, classified under NAICS code 236220, is administered by the District’s Procurement, Contracts & Auxiliary Services office in Stockton, California, with Sr. Procurement Specialist Bennie Salazar as the primary point of contact. Work is to be performed at the District’s campuses, with substantial completion required within 150 days of the Notice to Proceed and final completion an additional 150 days thereafter. The contract is structured as a Lowest Price Technically Acceptable (LPTA) procurement, where award will be made to the lowest responsible bidder whose proposal meets minimum technical requirements, with no trade-off process for higher-priced, higher-performing bids. The scope includes full labor, materials, equipment, permitting, and coordination necessary to construct all-gender restrooms in compliance with applicable codes, including ASTM, NFPA, ACI, and California Title 24 standards, as well as manufacturer specifications. Packaging, preservation, and labeling must prevent damage, ensure traceability, and maintain compliance with UL, ASTM, and AISC/RCSC standards, though no bar-coding or military standards are mandated. The Contractor must submit detailed documentation including material certifications, maintenance manuals, training records, and closeout reports, with inspections conducted at both fabrication and project sites and final acceptance determined administratively by the District’s Board of Trustees upon successful compliance verification. Insurance requirements include $1 million per occurrence commercial general liability coverage, automobile liability, builder’s risk, and naming the District and its agents as additional insureds. An Owner-Controlled Insurance Program may be instituted, requiring the Contractor to remove related costs from its bid. Special requirements include adherence to safety protocols prohibiting weapons and drugs on site, submission of shoring plans for excavations over five feet, advance coordination of utility connections paid for by the District, and strict substitution procedures where proposed alternatives must meet or exceed specified performance without additional cost. The Contractor must also comply with California-specific certifications, including the Iran Contracting Act and an Experience Modification Rate of 1.25 or less for all subcontractors. Payment will be processed within

General Info

California Community College seeks bids to implement all-gender restrooms by June 25, 2026.

Documents

26

2026 All Gender Restrooms Bid Form - 2026-RFB-020

PDF, High priority: read this firstbid-form
High

2026 All Gender Restrooms RFB 2026-RFB-020

PDF, High priority: read this firstrfb
High

2026-RFB-020 Summary of Costs and Bid Breakdown

PDF, High priority: read this firstbid-breakdown
High

Attachment AA - DSA Structural Tests and Special Inspections

PDF, High priority: read this firstsow
High

Attachment I - Bidder's Representations and Certifications for 2026 All Gender Restrooms Project

PDF, High priority: read this firstrepresentations-and-certifications
High

Attachment M - Designation of Subcontractors for 2026 All Gender Restrooms Project

PDF, High priority: read this firstdesignation-of-subcontractors
High

Attachment O - Agreement to be Bound for San Joaquin Delta CCD PLA

PDF, High priority: read this firstagreement-to-be-bound
High

Attachment S - Low Bid Contract for 2026 All Gender Restrooms Project

PDF, High priority: read this firstcontract-document
High

Attachment T - Special Conditions for Construction Contract

PDF, High priority: read this firstspecial-conditions
High

Attachment U - Project Specifications for All Gender Restrooms at San Joaquin Delta College

PDF, High priority: read this firstspecifications
High

Bid Bond Attachment C for San Joaquin Delta CCD 2026-RFB-020

PDF, High priority: read this firstbid-bond
High

Payment Bond for 2026 All Gender Restrooms Project

PDF, High priority: read this firstpayment-bond
High

Performance Bond for 2026 All Gender Restrooms Project

PDF, High priority: read this firstperformance-bond
High

Project Labor and Community Workforce Agreement - San Joaquin Delta CCD

PDF, High priority: read this firstagreement
High

Acknowledgment of Addenda for 2026 All Gender Restrooms Project

PDF, Low priorityacknowledgment-of-addenda
Low

Attachment E - Non-Collusion Declaration for 2026 All Gender Restrooms Project

PDF, Low prioritynon-collusion-declaration
Low

Attachment F - Non-Discrimination Declaration for 2026 All Gender Restrooms Project

PDF, Low prioritydeclaration
Low

Attachment G - Conflict of Interest Certification for 2026 All Gender Restrooms Project

PDF, Low priorityconflict-of-interest-certification
Low

Attachment H - Workers Compensation Certification for 2026 All Gender Restrooms Project

PDF, Low prioritycertification
Low

Attachment J - Authorization to Release Information for 2026 All Gender Restrooms Project

PDF, Low priorityauthorization-to-release-information
Low

Attachment K - Evidence of Insurance for 2026 All Gender Restrooms Project

PDF, Low priorityevidence-of-insurance
Low

Attachment L - Statement of Safety Record

PDF, Low prioritysafety-record
Low

Attachment Z - Reference Documents for 2026 All Gender Restrooms Project

PDF, Low priorityreference-documents
Low

Declaration of Sufficiency of Funds - Attachment D

PDF, Low prioritydeclaration-of-sufficiency-of-funds
Low

Escrow Agreement Attachment R - San Joaquin Delta CCD

PDF, Low prioritycontract-document
Low

Attachment_V_-_Approved_Plans.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Procurement, Contracts & Auxiliary Services
Contacts1 person available
OfficeStockton, CA, 95207, USA
Office AddressStockton, CA, 95207, USA
Contacts
Bennie SalazarSr. Procurement Specialist

Interested Companies (21)

ConstructConnectCincinnati, OH
Marketway GlobalAnaheim, CA
FireDoor Nation

See All 21 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The District is part of the statewide California Community College System, and currently serves over 23,000 students annually. The District is comprised of the Stockton Main Campus, the South Campus at Mountain House, and the Manteca Center. Additional information about the District is available online at https://www.deltacollege.edu/ . The District is governed by a Board of Trustees (the "Board"), consisting of seven voting members, elected from trustee areas in general elections throughout the District, and a Student Representative, appointed by Student Government. The Board exists under and derives its powers from the California Constitution and the acts of the State Legislature, and it derives its authority from the California Education Code.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS