Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on July 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 City Center CIPP Project, City of Renton, WA #CAG-26-124

Closed
CAG-26-124State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and DIP sewer lines ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional project deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes during construction. General project requirements include clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Due to the project location and nature, contractors must provide railroad insurance. The bid schedule further accounts for extra depth excavation and the abandonment of existing pipes and manholes. All inquiries and quotations should be directed to John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operating facility equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The project also requires associated site work, including exploratory drilling, rock excavation, and grading. The contract is governed by EJCDC standard general and supplementary conditions, with technical specifications spanning divisions 00 through 44. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to submission requirements. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10.9 percent for EPA MBE and 10 percent for the State of North Carolina. Contract administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with a 30-day payment term following the engineer's recommendation.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The 2026 City Center CIPP Project for the City of Renton, Washington, solicitation number CAG-26-124, involves extensive Cured-in-Place-Pipe rehabilitation for both sanitary sewer and storm drain systems. The scope of work includes the rehabilitation of approximately 13,185 linear feet of sanitary sewer pipe ranging from 6 to 15 inches in diameter and approximately 4,149 linear feet of storm pipe ranging from 12 to 24 inches. Key technical requirements include the reinstatement of 200 side-sewer laterals and 28 storm-sewer laterals, trimming of intruding laterals, point repairs as needed, and comprehensive performance testing and analysis. General project requirements include mobilization, the implementation of temporary traffic control measures adhering to City of Renton and MUTCD standards, and compliance with apprenticeship utilization requirements. The contractor is responsible for confirming pipe diameters and lengths, locating laterals, performing pre- and post-cleaning inspections, and managing bypass pumping. This local government project is managed by the City of Renton with Jesse Newman serving as the primary point of contact.

General Info

City of Renton CIPP project rehabilitating sanitary sewer and storm drain pipe systems.

Documents

341

Addendum #1 - Revised - Page 1.jpg

JPG

Addendum #1 - Revised - Page 2.jpg

JPG

Addendum #1 - Revised - Page 3.jpg

JPG

Addendum #1 - Revised - Page 4.jpg

JPG

Addendum #1 - Revised - Page 5.jpg

JPG

Addendum #1 - Revised - Page 6.jpg

JPG

Addendum #2 - Page 1.jpg

JPG

Addendum #2 - Page 2.jpg

JPG

Addendum #2 - Page 3.jpg

JPG

Addendum #2 - Page 4.jpg

JPG

Schedule of Prices Clarification 7/7/2026 - Page 1.jpg

JPG

Schedule of Prices Clarification 7/7/2026 - Page 2.jpg

JPG

Schedule of Prices Clarification 7/7/2026 - Page 3.jpg

JPG

Schedule of Prices Clarification 7/7/2026 - Page 4.jpg

JPG

Volume 1 Specs - Page 100.jpg

JPG

Volume 1 Specs - Page 101.jpg

JPG

Volume 1 Specs - Page 102.jpg

JPG

Volume 1 Specs - Page 103.jpg

JPG

Volume 1 Specs - Page 104.jpg

JPG

Volume 1 Specs - Page 105.jpg

JPG

Volume 1 Specs - Page 106.jpg

JPG

Volume 1 Specs - Page 107.jpg

JPG

Volume 1 Specs - Page 108.jpg

JPG

Volume 1 Specs - Page 109.jpg

JPG

Volume 1 Specs - Page 10.jpg

JPG

Volume 1 Specs - Page 110.jpg

JPG

Volume 1 Specs - Page 111.jpg

JPG

Volume 1 Specs - Page 112.jpg

JPG

Volume 1 Specs - Page 113.jpg

JPG

Volume 1 Specs - Page 114.jpg

JPG

Volume 1 Specs - Page 115.jpg

JPG

Volume 1 Specs - Page 116.jpg

JPG

Volume 1 Specs - Page 117.jpg

JPG

Volume 1 Specs - Page 118.jpg

JPG

Volume 1 Specs - Page 119.jpg

JPG

Volume 1 Specs - Page 11.jpg

JPG

Volume 1 Specs - Page 120.jpg

JPG

Volume 1 Specs - Page 121.jpg

JPG

Volume 1 Specs - Page 122.jpg

JPG

Volume 1 Specs - Page 123.jpg

JPG

Volume 1 Specs - Page 124.jpg

JPG

Volume 1 Specs - Page 125.jpg

JPG

Volume 1 Specs - Page 126.jpg

JPG

Volume 1 Specs - Page 127.jpg

JPG

Volume 1 Specs - Page 128.jpg

JPG

Volume 1 Specs - Page 129.jpg

JPG

Volume 1 Specs - Page 12.jpg

JPG

Volume 1 Specs - Page 130.jpg

JPG

Volume 1 Specs - Page 131.jpg

JPG

Volume 1 Specs - Page 132.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Renton
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → City of Renton
Office AddressN/A

Interested Companies (7)

Insituform TechnologiesChesterfield, MO
Spray GlassTumwater, WA
Northwest BarricadeEverett, WA

See All 7 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Schedule A – General Items
- Mobilization
- Temporary traffic control measures following the Contract Documents and applicable City of Renton and MUTCD standards.
- Apprenticeship Utilization Requirements
Schedule B – Sewer Items
- Cured-in-Place-Pipe (CIPP) Rehabilitation of a combined total of approximately 13,185 LF (LF) of 6”, 8”, 10”, and 15” Sanitary Sewer pipe.
- Trim 9 intruding laterals.
- Reinstatement of 200 side-sewer laterals
- Deep Clean of one lateral, and install of a Short-Range Lateral Seal (1-2 ft)
- Point Repairs (as necessary)
- CIPP Performance testing and analysis, 13 tests
Schedule C – Storm Items
- CIPP Rehabilitation of a combined total of approximately 4,149 LF of 12”, 15”, and 24” diameter storm pipe.
- Reinstatement of 28 storm-sewer laterals
- Trim 22 intruding laterals.
- Point Repairs (as necessary)
- CIPP Performance testing, 4 tests
Schedule B and C
- Confirm the diameter and length of sewer and storm pipes to be CIPP Rehabbed
- Confirm Storm and Sewer Lateral Location
- Pre- and post-cleaning and Inspection
- Bypass pumping

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS