Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Combined Cured In Place Pipe (CIPP) Rehabilitation Project, City of Edmonds, WA #CE25SM01 & CE25SW01

Closed
CE25SM01 & CE25SW01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and DIP sewer lines ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional project deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes during construction. General project requirements include clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Due to the project location and nature, contractors must provide railroad insurance. The bid schedule further accounts for extra depth excavation and the abandonment of existing pipes and manholes. All inquiries and quotations should be directed to John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operating facility equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The project also requires associated site work, including exploratory drilling, rock excavation, and grading. The contract is governed by EJCDC standard general and supplementary conditions, with technical specifications spanning divisions 00 through 44. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to submission requirements. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10.9 percent for EPA MBE and 10 percent for the State of North Carolina. Contract administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with a 30-day payment term following the engineer's recommendation.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The City of Edmonds is soliciting contractors for the 2026 Combined Cured in Place Pipe (CIPP) Rehabilitation Project, encompassing three distinct pipeline rehabilitation schedules across the city. Schedule A involves the installation of approximately 258 linear feet of 8-inch diameter CIPP liner in the sewer system, accompanied by mandatory pre- and post-construction CCTV inspections to verify pipe integrity before and after rehabilitation. Schedule B covers the replacement of about 690 linear feet of 8-inch diameter CIPP liner along 88th Avenue West storm infrastructure, also requiring comprehensive CCTV inspections at both stages of the project. Schedule C is the most complex, with installation of varying diameter CIPP liners including 15 feet of 8-inch, 480 feet of 12-inch, 520 feet of 15-inch, and 150 feet of 18-inch liners, all of which must be inspected via CCTV prior to and following installation. Additionally, Schedule C includes the placement of 20 linear feet of 12-inch diameter PVC pipe and full general restoration of affected areas to restore surface conditions. All work is to be performed in Edmonds, Washington, with a response deadline of May 14, 2026, and the project is managed by the City’s Public Works division with Russell Lynch as the point of contact.

General Info

Edmonds hires contractors for 2026 CIPP sewer rehab across three schedules with CCTV inspections and restoration.

Place of Performance

Edmonds, WA, 98020, USA

Set-Aside

NONE

Documents

244

Plans - Page 10.jpg

JPG

Plans - Page 11.jpg

JPG

Plans - Page 12.jpg

JPG

Plans - Page 1.jpg

JPG

Plans - Page 2.jpg

JPG

Plans - Page 3.jpg

JPG

Plans - Page 4.jpg

JPG

Plans - Page 5.jpg

JPG

Plans - Page 6.jpg

JPG

Plans - Page 7.jpg

JPG

Plans - Page 8.jpg

JPG

Plans - Page 9.jpg

JPG

Specs - Page 100.jpg

JPG

Specs - Page 101.jpg

JPG

Specs - Page 102.jpg

JPG

Specs - Page 103.jpg

JPG

Specs - Page 104.jpg

JPG

Specs - Page 105.jpg

JPG

Specs - Page 106.jpg

JPG

Specs - Page 107.jpg

JPG

Specs - Page 108.jpg

JPG

Specs - Page 109.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 110.jpg

JPG

Specs - Page 111.jpg

JPG

Specs - Page 112.jpg

JPG

Specs - Page 113.jpg

JPG

Specs - Page 114.jpg

JPG

Specs - Page 115.jpg

JPG

Specs - Page 116.jpg

JPG

Specs - Page 117.jpg

JPG

Specs - Page 118.jpg

JPG

Specs - Page 119.jpg

JPG

Specs - Page 11.jpg

JPG

Specs - Page 120.jpg

JPG

Specs - Page 121.jpg

JPG

Specs - Page 122.jpg

JPG

Specs - Page 123.jpg

JPG

Specs - Page 124.jpg

JPG

Specs - Page 125.jpg

JPG

Specs - Page 126.jpg

JPG

Specs - Page 127.jpg

JPG

Specs - Page 128.jpg

JPG

Specs - Page 129.jpg

JPG

Specs - Page 12.jpg

JPG

Specs - Page 130.jpg

JPG

Specs - Page 131.jpg

JPG

Specs - Page 132.jpg

JPG

Specs - Page 133.jpg

JPG

Specs - Page 134.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Edmonds
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → City of Edmonds
Office AddressN/A
Contacts
Russell Lynch

Interested Companies (6)

Insituform TechnologiesChesterfield, MO
Spray GlassTumwater, WA
Northwest BarricadeEverett, WA

See All 6 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
This project involves three (3) schedules (A – Sewer, B – 88th Avenue West Storm, and C – Daley Pl Storm) in the construction of the City of Edmonds 2026 Combined Cured in Place Pipe (CIPP) Rehabilitation Project. This Project consists of:
• Schedule A – Phase 13 Sewer:
Installation of approximately 258 linear feet (LF) of 8-inch diameter cured-in-place (CIPP) structural liner, along with both pre-construction and post-construction Closed Circuit Television (CCTV) pipe inspection.
• Schedule B – Phase 6 Storm (88th Avenue West):
Installation of approximately 690 linear LF of 8-inch diameter CIPP structural liner, along with both pre-construction and post-construction CCTV pipe inspection.
• Schedule C – Phase 6 Storm (Daley Pl):
Installation of approximately 15 LF of 8-inch diameter, 480 LF of 12-inch diameter, 520 LF of 15-inch diameter, and 150 LF of 18-inch diameter CIPP structural liner, along with both pre-construction and post-construction CCTV pipe inspection. This site will also include 20 LF of 12-inch diameter PVC and general restoration.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS