This Solicitation opportunity from Washington was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2026 Combined Cured In Place Pipe (CIPP) Rehabilitation Project, City of Edmonds, WA #CE25SM01 & CE25SW01
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Edmonds is soliciting contractors for the 2026 Combined Cured in Place Pipe (CIPP) Rehabilitation Project, encompassing three distinct pipeline rehabilitation schedules across the city. Schedule A involves the installation of approximately 258 linear feet of 8-inch diameter CIPP liner in the sewer system, accompanied by mandatory pre- and post-construction CCTV inspections to verify pipe integrity before and after rehabilitation. Schedule B covers the replacement of about 690 linear feet of 8-inch diameter CIPP liner along 88th Avenue West storm infrastructure, also requiring comprehensive CCTV inspections at both stages of the project. Schedule C is the most complex, with installation of varying diameter CIPP liners including 15 feet of 8-inch, 480 feet of 12-inch, 520 feet of 15-inch, and 150 feet of 18-inch liners, all of which must be inspected via CCTV prior to and following installation. Additionally, Schedule C includes the placement of 20 linear feet of 12-inch diameter PVC pipe and full general restoration of affected areas to restore surface conditions. All work is to be performed in Edmonds, Washington, with a response deadline of May 14, 2026, and the project is managed by the City’s Public Works division with Russell Lynch as the point of contact.
General Info
Agency
NAICS
Place of Performance
Edmonds, WA, 98020, USASet-Aside
Documents
(244)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (6)
See All 6 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
• Schedule A – Phase 13 Sewer:
Installation of approximately 258 linear feet (LF) of 8-inch diameter cured-in-place (CIPP) structural liner, along with both pre-construction and post-construction Closed Circuit Television (CCTV) pipe inspection.
• Schedule B – Phase 6 Storm (88th Avenue West):
Installation of approximately 690 linear LF of 8-inch diameter CIPP structural liner, along with both pre-construction and post-construction CCTV pipe inspection.
• Schedule C – Phase 6 Storm (Daley Pl):
Installation of approximately 15 LF of 8-inch diameter, 480 LF of 12-inch diameter, 520 LF of 15-inch diameter, and 150 LF of 18-inch diameter CIPP structural liner, along with both pre-construction and post-construction CCTV pipe inspection. This site will also include 20 LF of 12-inch diameter PVC and general restoration.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
