2026 Culvert Replacement Program

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sonoma County Department of Transportation and Public Works is preparing to replace fifteen deteriorating culverts under its 2026 Culvert Replacement Program, prioritizing those with trench plates to improve drainage and road integrity. The project involves the complete removal of existing culverts and installation of new ones at specified locations along Annapolis Road, Austin Creek Road, Dupont Road, Eastside Road, Green Valley Road, King Ridge Road, Moscow Road, Pine Flat Road, Rio Linda Avenue, St. Helena Road, Wilfred Avenue, and Wilshire Drive. Work will include structural excavation, placement of replacement culverts, construction of cut-off walls, and application of rock slope protection where necessary. Trenches will be backfilled, new hot mix asphalt will be laid, and road striping will be repainted. Water diversion measures will be implemented if groundwater or runoff threatens curing concrete, and all sites will feature erosion and sediment control best management practices. No trees will be removed, but limited pruning and vegetation clearance may occur to enable safe access. The project is classified as exempt from County Wide Utility and Right of Way/General Plan requirements due to its nature as maintenance. The program is publicly forecasted with a posted date of June 5, 2026, and primary coordination is handled by David Walsh, Senior Environmental Specialist, with additional contact through Sonoma County Public Infrastructure.

General Info

Replace 15 culverts on 12 roads with drainage improvements, no tree removal, exempt maintenance project.

Agency

California → Sonoma County

Place of Performance

CA, 95403

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sonoma County
Office AddressN/A
Contacts
David WalshSenior Environmental Specialist
Sonoma County Public InfrastructureApplicant

Full Description

Show more
The Sonoma County Department of Transportation and Public Works 2020 Culvert Replacement Program entails removal of existing deteriorating culverts and installing replacement culverts prioritizing those with trench plates. Twelve culverts will be replaced: 1) Annapolis Road PM.12.28 38.710452; -123.409538 2) Austin Creek Road PM.14.48 38.515206; -123.079809 3) Austin Creek Road PM.14.50 38.515686; -123.079622 4) Dupont Road PM.10.20 38.41922; -122.927392 5) Eastside Road PM.12.85 38.524357; -122.847859 6) Green Valley Road PM.15.19 38.444538; -122.89215 7) King Ridge Road 2609 38.542157;-123.090386 8) King Ridge Road 2604 38.542199; -123.089413 9) Moscow Road PM. 11.41 38.4657; -123.03556 10) Pine Flat Road PM.1301 38.699169; -122.780609 11) Rio Linda Avenue PM.12.83 38.623661; -122.830534 12) St. Helena Road PM.13.76 38.520107; -122,597575 13) Wilfred Avenue PM.9.77 38.363272; -122745597 14) Wilshire Drive PM.10.24 38.51444; -122.71228 15) Wilshire Drive PM.10.38 38.363272; -122.71316 This project consists of structural excavation to remove existing cross culverts, installation of replacement cross culverts, cut-off walls, and rock slope protection, as needed. Trenches will be backfilled, hot mix asphalt placed, and striping painted. If water is present at the worksite or has the potential to come into contact with curing concrete, a water diversion plan will be implemented. Erosion and sediment control BMPs will be used and installed at each worksite. No trees will be removed during construction; however, some pruning and ground vegetation may be required to access the work sites. County Wide – Utility and/or Right of Way/ General Plan: exempt due to maintenance

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including site preparation, land surveying, subsurface investigation, and shoring. The scope further extends to complex pipeline and utility work such as tunneling, boring, jacking, micro tunneling, and the installation of cathodic protection and steel casing. Additional requirements include surface work like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, as well as the supply of ready mix, precast concrete, and manhole materials. The solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit also emphasizes the importance of labor harmony and notes its existing collective bargaining agreements with several trade unions. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim with an estimated construction cost of $4,213,400. The scope of work involves the removal and reconstruction of asphalt concrete pavement using rubberized asphalt concrete within the existing right of way on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. Additional infrastructure improvements include the reconstruction of ADA access ramps, sidewalks, curb and gutter, and the adjustment of utility pull-boxes and traffic detection devices, as well as the installation of signage and pavement markings. The project must be completed within 70 working days from the Notice to Proceed. Contractors must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A key requirement is compliance with the Community Workforce Agreement, requiring the awarded contractor and all subcontractors to sign a Letter of Assent. Bids are evaluated based on the lowest responsive Total Base Bid Proposal submitted via OpenGov, with a required 10% bid bond. Performance is subject to strict work hour constraints, specifically between 10:00 p.m. and 5:00 a.m. for work affecting Caltrans right-of-way. The contract also mandates adherence to MUTCD standards for traffic control and ANSI/TIA/EIA standards for fiber optic installations.
Public Works

POSTED

about 18 hours ago

DEADLINE

in 5 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS