2026 EE36-EE30 Emergency Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 2026 EE36-EE30 Emergency Project is a critical infrastructure initiative managed by the Santa Cruz County Sanitation District to repair a failing sewer main located at the Capitola Road Extension in California. The project addresses structural defects in the pipe, joints, and connections caused by age-related deterioration. Due to the infeasibility of trenchless methods, the scope of work requires conventional open-cut trenching within a 10-foot wide construction corridor. This process involves digging trenches, removing deteriorated piping, installing replacement pipes, and restoring the area to its original contours. To maintain service during construction, temporary bypass piping will be utilized along existing access routes. Because the project runs parallel to the Arana Gulch riparian corridor, it is subject to strict environmental and biological compliance measures. Key requirements include mandatory biological awareness training for all personnel, the installation of high-visibility fencing around sensitive habitats, and the use of a qualified biologist to monitor initial clearing and grubbing. Specific species protections are in place, including surveys for San Francisco dusky-footed woodrat nests and nesting bird surveys during the February 1st to August 31st season. The project is governed by a CEQA Notice of Exemption and a Riparian Exception Level 3 permit, which is effective from July 30, 2026, through July 30, 2029. Project management is led by Ivan Messina of the Public Works Sanitation Department.

General Info

Santa Cruz County to urgently repair failing sewer main in 95062 area, project managed by Ivan Messina.

Agency

California → Santa Cruz County Sanitation District

Place of Performance

Capitola Road Extension, CA, 95062

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Cruz County Sanitation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Cruz County Sanitation District
Office AddressN/A
Contacts
Ivan MessinaProject Manager

Full Description

Show more
The project includes repairing an existing failing sewer main after maintenance crews identified structural defects due to age-related deterioration affecting the pipe, joints, and connections that require immediate repair to maintain reliable service

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC piping ranging from 6 to 30 inches and Ductile Iron Pipe (DIP) in 18 and 24-inch diameters. Key deliverables include the construction of standard manholes up to 72 inches, doghouse manholes up to 84 inches, and 24-inch DIP sewer trenchless crossings with associated launch and receiving shafts. Additional requirements encompass a CSO regulator fit out, outfall work, and the abandonment of existing pipes and manholes. Supporting site activities include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), clearing and grubbing of 5,130 square yards of wooded areas, and subsequent seeding and fine grading. The project also requires geotechnical instrumentation and monitoring, maintenance of flows and bypass, and specific railroad insurance. Point of contact for this opportunity is John Connelly at [email hidden].
Cleary Construction, Inc.

POSTED

13 minutes ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on socioeconomic compliance through required Minority and Women-Owned Business Enterprise documentation. Bidders must provide a Good Faith Efforts Form and Table A to be considered responsive. The project is governed by EJCDC standard general and supplementary conditions, requiring both performance and payment bonds from sureties with an A.M. Best rating of A-VII or better. Performance begins upon a written Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. Final acceptance is contingent upon the Engineer's determination of substantial completion and the resolution of a final punch list.
Don Moorhead Construction, Inc.

POSTED

13 minutes ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS