Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on March 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026-IFB-319 Birdie Drive Stormwater Improvement Project (Phase 1 and 2)

Closed
2026-IFB-319State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Douglasville-Douglas County Water and Sewer Authority is inviting qualified contractors to submit competitive sealed bids for the Birdie Drive Stormwater Improvement Project, encompassing both Phase 1 and Phase 2. This turnkey project requires contractors to provide all necessary labor, materials, equipment, tools, and transportation to install liners within existing corrugated metal storm pipes. Phase 1 involves the installation of a Cured-In-Place Pipe liner in a 15-inch storm system extending approximately 197 linear feet, while Phase 2 entails spin-casting a centrifugally cast concrete pipe liner in a 36-inch storm system spanning about 454 linear feet near 3995 Birdie Drive. The project plans were prepared by Dane Hanson, P.E., and all work is confined to Authority easements and public right-of-way with all necessary permits and easements already secured. Bidders must obtain the full bid package for $25 from the Authority’s Purchasing Department to ensure their bids are considered responsive. The solicitation was posted on March 4, 2026, with a bid submission deadline of April 1, 2026, at 7:00 p.m. Interested parties can direct inquiries to the primary contact, Joseph Morency, via email or phone. The project will be executed with minimal involvement from Authority personnel, reflecting a comprehensive scope designed to improve stormwater infrastructure effectively and efficiently.

General Info

Douglasville Water Authority seeks bids for Birdie Drive stormwater pipe liner installation, phases 1 and 2.

Documents

1
PDF, High priority: read this first2 pages · ifb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 11 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 21 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Douglasville-douglas County Water & Sewer Authority
Contacts1 person available
OfficeN/A

Full Description

Show more
Invitation for Bids for Birdie Drive Stormwater Improvement Project (Phase 1 and 2) for Douglasville ¿ Douglas County Water and Sewer Authority 8763 Hospital Drive Douglasville, Georgia 30134
March 4, 2026
IFB# 319
The Douglasville ¿ Douglas County Water and Sewer Authority (the ¿Authority¿) is soliciting competitive sealed bids from qualified contractors for the performance of the Birdie Drive Stormwater Improvement Project (Phase 1 and 2) (the ¿Project¿), as more fully described in the Invitation for Bids. The scope of work includes the provision by the bidder or contractor of all labor, materials, equipment, tools, transportation, and supplies necessary to complete the work. The Project will be ¿turnkey¿ and require minimal involvement of Authority personnel.
The Phase 1 work to be performed shall include installing an engineered Cured-In-Place Pipe (CIPP) liner in an existing 15-inch corrugated metal pipe (CMP) storm system with a total length of approximately 197 linear feet. Phase 2 includes installing (spin-casting) an engineered centrifugally cast concrete pipe (CCCP) liner in approximately 454 linear feet of existing 36-inch corrugated metal pipe (CMP) located near the property at 3995 Birdie Drive. The plans for the Birdie Drive Stormwater Improvement Project (Phase 1 and 2), have been prepared by the Authority, Dane Hanson, P.E., dated March 2, 2026. Special Conditions and Appendices contain more detailed information on the Project scope.
All work will be performed within Authority easements and/or inside public right-of-way. All anticipated rights-of-way and easements required for the Project have been obtained. All anticipated federal, state, and local permits required for the Project have been obtained.
Parties interested in this Invitation for Bids must obtain a copy of the full bid package or their bids will be considered nonresponsive. Bid packages must be obtained for the nominal cost of $25.00 by contacting the Authority¿s Purchasing Departm

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS