Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

2026 Leak Detection Survey

Open
PE-75553-NONST-2026-000000069State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Dalton Utilities is soliciting a contractor to perform a leak detection survey and pinpointing project covering approximately 123.78 miles of water distribution lines, including all connected valves, hydrants, and services in Georgia. The project must be completed within 60 calendar days of the notice to proceed and issuance of a purchase order. The contractor is responsible for all labor, equipment, and any necessary pot holing to access mains for testing, while Dalton Utilities will provide a field technician for assistance in locating infrastructure. The contractor must provide weekly progress reports and a comprehensive final report that includes a project summary, survey review, and detailed data for each leak, such as location, facility type, equipment used, estimated leak rate in gallons per minute, and photographs. All leaks must be clearly marked in the field and ranked on a prioritization scale of 1 to 5. Bidders must submit a total bid price, a technical proposal detailing methodology and personnel, and E-Verify compliance affidavits. General Liability and Workman's Compensation insurance are required, and progress billing is permitted.

General Info

Contractor will perform leak detection on 123.78 miles of Georgia water lines.

Place of Performance

GA, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Dalton Utilities
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → Dalton Utilities
Office AddressN/A

Full Description

Show more
Perform a leak detection survey and pinpointing project to cover approximately 123.78 miles of water distribution lines and all connected valves, hydrants, services, etc. At a minimum, the final report shall include the following items for each leak: location, size/type of facility, description, equipment used to find leak, estimated leak rate in gallons per minute (gpm), and a picture of the leak location. Each leak is to be clearly marked in the field, as well as documented in the report. It will not be necessary to pinpoint leaks on private lines; however, all leaks discovered on private service lines are to be reported to Dalton Utilities. Dalton Utilities will supply a field technician at all times to assist with locating mains, valves, services, and hydrants. Any pot holing required to gain access to the mains for the purpose of testing is the responsibility of the contractor.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
City of Cartersville Comprehensive Plan 5-Year Update
Solicitation # PE-60899-NONST-2027-000000090
The City of Cartersville is seeking qualified planning consultants to conduct a five-year update of its local comprehensive plan, with a target completion and adoption date of February 2028. The scope of work involves updating short-term planning goals to align with state and regional objectives across economic development, housing, transportation, land use, community facilities, and natural and historic resources. Key requirements include implementing an inclusive community participation plan, performing a SWOT analysis, amending the future land use map, and coordinating with the Northwest Georgia Regional Commission. The final deliverables must include an inventory and assessment report, a statement of needs and opportunities, and a Community Work Program for 2028 through 2032, all prepared in accordance with DCA Rules and O.C.G.A. standards. Interested firms must submit five copies of their qualifications and fee proposal in an opaque envelope by December 4, 2026. Proposals must include the firm's history, a detailed project approach, personnel resumes, a time schedule, a project budget, and references from similar projects completed within the last five years. Proposals must be binding for at least 90 days, and preference will be given to firms with experience in the State of Georgia. Selection will be based on the qualifications of the consultant team and the quality of the proposal, with the City reserving the right to shortlist high-scoring firms for interviews and negotiate the final price and scope of work.
City of Cartersville

POSTED

about 5 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
SLED
ENGINEERING SERVICES FOR: SR-166 @ POST ROAD INTERSECTION PROJECT P.I. # 002118
Solicitation # 26-032
The Douglas County Board of Commissioners is soliciting Statements of Qualifications for solicitation 26-032 to provide engineering design services for the SR 166 at Post Road Intersection Project (P.I. # 0021183) in Georgia. The primary goal of the project is to improve traffic operations, safety, and intersection efficiency, with a specific anticipation of a roundabout design. The scope of work may include roadway widening, drainage upgrades, lighting, utility coordination, and improvements to signing and pavement markings. To be eligible, the prime consultant must be prequalified by the Georgia Department of Transportation (GDOT) in the required area classes. The selection process is a two-phase most qualified evaluation. Phase I focuses on the qualifications of the project manager and key team leaders, the prime consultant's experience with similar projects, workload capacity, and the ability to meet the project schedule. Phase II evaluates unique technical approaches to design and project management, mitigation strategies for project challenges, and specific local knowledge. Past performance, including GDOT project evaluations, accounts for 10% of the final score. Mandatory requirements include a notarized certification form, a Georgia Security and Immigration Compliance Act Affidavit, and a no conflict of interest certification. All submissions must be electronic PDFs submitted via bidnet and GPR by the December 10, 2026, deadline.
Douglas County Board of Commissioners

POSTED

about 5 hours ago

DEADLINE

in 30 days
View Details

More opportunities from Georgia → Dalton Utilities

Same awarding agency

NAICS: 237130
New
SLED
2027 Dalton Telecom Conduit Project
Solicitation # PE-75553-NONST-2027-000000068
The 2027 Dalton Telecom Conduit Project, managed by Dalton Utilities in Georgia, involves the installation of a new telecommunications pathway across several roads, including Industrial South Rd, Callahan Rd, Focus Dr, Brookhollow Ind Blvd, Kraft Dr, South Dalton Bypass, Howell Dr, Enterprise Dr, and Boring Dr. The scope of work requires the contractor to furnish all labor, materials, and equipment to install 11,550 linear feet of two 4-inch underground conduits via directional drilling, 190 linear feet of 12-inch HDPE case bore, and 24 telecommunications vaults (four 60x48 and twenty 48x48). The contractor is responsible for all excavation, vault installation, and site restoration, ensuring that post-construction conditions are equal to or better than pre-construction conditions, including erosion and pollution control. The contract is governed by the laws of the State of Georgia and will be awarded to the lowest responsible and responsive bidder, though the owner reserves the right to select the best overall value based on price, schedule, and experience. Performance is required within 90 calendar days of the Notice to Proceed, with bidders expected to mobilize within three weeks of the bid opening. Financial requirements include a 10% bid bond and 100% performance and payment bonds. Payment terms specify a 30-day window following invoice approval, with a maximum retainage of 10% on progress payments. Final acceptance is contingent upon a final inspection and the submission of precise as-built drawings meeting specific GPS and elevation accuracy standards.
Power and Communication Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS