Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on March 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 LMIG Countywide Paving Project

Closed
PE-77832-NONST-2026-000000011State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation activities including land surveying, site clearing, shoring, and subgrade roadbed work. Additional requirements encompass environmental support through storm water pollution prevention, the supply of ready mix and precast concrete, and the installation of traffic signs, signals, and lighting. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must submit their quotes via the Building Connected system by the bid deadline of November 18, 2025, at 2:00 p.m. Primary coordination is managed by Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 18 days
NAICS: 237310
New
SLED
8798
Solicitation # 8798
The Union Lindell Bridge Replacement project, managed by the City of St. Louis Board of Public Service, involves the reconstruction of the bridge over Forest Park Parkway and MetroLink in St. Louis, Missouri. The scope of work encompasses extensive civil engineering activities, including Class 3 excavation, concrete pavement installation, the construction of light pole foundations, and the installation of MSD sewer pipes and manholes. The project also includes significant landscaping requirements such as the installation of a vegetated roof assembly, irrigation areas, and various plant species. Technical execution must adhere to a hierarchy of standards, prioritizing Job Special Provisions, followed by Metropolitan St. Louis Sewer District, Missouri Standard Specifications for Highway Construction, and City of St. Louis street and alley construction standards. Bidders must submit electronic proposals via the Bid Express Online Portal by November 3, 2026. Key financial and legal requirements include a 5% bid deposit, a 452 working day completion timeline, and liquidated damages set at $4,300 per day. Contractors must provide payment and performance bonds from a surety company with a policyholder rating of A- or better and a financial rating of V or higher. Compliance mandates include adherence to the higher of Missouri or Davis-Bacon prevailing wage rates, E-Verify participation, Buy America material certifications, and a ten-hour OSHA Construction Safety Program for on-site employees. Additionally, bidders must comply with Disadvantaged Business Enterprise (DBE) goals and certify compliance with the Anti-Discrimination Against Israel Act.
City of St. Louis Board of Public Service

POSTED

about 10 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
City of Swainsboro, Georgia: North Green Street Sidewalk Improvements
Solicitation # PE-66723-NONST-2027-000000023
The City of Swainsboro, Georgia, is soliciting proposals for the North Green Street Sidewalk Improvements project, identified by solicitation number PE-66723-NONST-2027-000000023. The scope of work involves furnishing all labor, equipment, and materials to install approximately 1,153 linear feet of concrete curb and gutter, 549 square yards of 5-foot-wide 4-inch-thick concrete sidewalk, 86 square yards of 4-foot-wide 6-inch-thick concrete sidewalk, 94 square yards of 6-inch-thick concrete valley gutter, and two concrete flumes. The project also includes traffic control and the grassing of disturbed areas. All work must comply with the 2021 Georgia Department of Transportation Standard Specifications, the 2024 Supplemental Specifications Book, and applicable special provisions. The project timeline allows for 90 consecutive calendar days for substantial completion and 120 consecutive calendar days for final completion. Bidders must submit sealed proposals by 2:00 P.M. local time on December 3, 2026, at Swainsboro City Hall. Proposals must be submitted on the provided form with pricing in both words and figures and must include a bid bond of at least 5 percent of the lump sum bid. The awarded contractor is required to provide performance and payment bonds, each equal to 100 percent of the contract amount, within 10 days of notification.
City of Swainsboro

POSTED

about 12 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Murray County is inviting bids for the 2026 LMIG Countywide Paving Project, which involves repaving and overlay work on over 37.5 miles of county roadways. The project includes asphalt overlay, leveling, and restriping across multiple roads such as Adams Road, Baxter Road, Central Way, and many others specified in the contract. Approximately 487,916 square yards of resurfacing will be completed using up to 45,000 tons of asphalt and 16,669 tons of leveling material. Additional tasks include paint striping replacement, manhole and valve box adjustments, and traffic control measures, including coordination with railroad flaggers where necessary. Construction must adhere to the Georgia Department of Transportation’s 2021 Standard Specifications and Supplemental Specifications, alongside all other applicable GDOT standards and contract requirements. Funding for this project comes from the 2026 LMIG and county funds. Sealed bids will be accepted until 9:30 a.m. on May 5, 2026, at the Office of the Commissioner in the Murray County Annex Building, where bids will be publicly opened and read. The point of contact for the solicitation is Matthew Sanford.

General Info

Murray County seeks bids for 2026 paving project repaving 37.5 miles, asphalt overlay, restriping.

Documents

1
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Murray County Government
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
This is an invitation to submit a bid to Murray County for the 2026 LMIG COUNTYWIDE PAVING PROJECT providing repaving/ overlay on more than 37.549 miles of Murray County Roadways as indicated herein. Sealed bids will be received at the Office of the Commissioner (in Murray County Annex Building at the above address) up to 9:30 a.m., May 5, 2026, at which time they will be opened and publicly read.
This project will be funded with 2026 LMIG and County funds. Construction includes asphalt overlay/repaving, leveling and restriping on up to 37.549 miles of road, including Adams Road, Baxter Road, Central Way, Chambers Drive, Cherokee Drive, Cochran Road, Coffee Church Road, Crandall Ellijay Road, Dogwood Lane, Douthitt Road, Dunn Street, Fagala Road, Forest Hills Drive, Greeson Road, Hamby Road, Haygood Road, Hillcrest Drive, Holly Creek Cool Springs Road, Holly Drive, Katie Lane, Kinser Drive, Ledford Road, Magnolia Lane, Manley Road, McEntire Road, Nightwind Drive, Old East Road, Old Federal Road North, Pannell Drive, Pat Loughridge Road, Pine Street East, Pine Hills Drive, Ridge Lane, Sourwood Lane, Springfield Drive, Sunrise Lane, Thornton Road North, White Road, Wilson Road in Murray County. The work will include approximately 487,916 SY of Resurfacing with limited leveling using 45,000 tons of asphalt, up to 16,669 tons of leveling. Paint striping / marking replacement and manhole/valve box adjustments as necessary are specified for all pavement overlay areas. Traffic control on roadways along with traffic control at railroad crossing involving railroad flaggers. All work shall conform to the Georgia Department of Transportation¿s (GDOT) Standard Specifications Construction of Transportation Systems, 2021 Edition; GDOT¿s Supplemental Specifications Construction of Transportation Systems, 2021; and all applicable GDOT Standards and Details; and other contract requirements, specifications and general conditions.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS