This Solicitation opportunity from Government of Canada was posted on March 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Local Street Renewal Program - Elgin Avenue West and Various other Location

Closed
8-2026International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and infrastructure works, including underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, shoring, asphalt paving, and the installation of utilities, manholes, and traffic signals. Additional requirements include land surveying, site security, traffic control, and storm water pollution prevention. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to various collective bargaining agreements. Interested parties must submit their quotes by November 18, 2025, via the Building Connected electronic system.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Davison Rd MP 0.01 Bridge Rehabilitation
Solicitation # CRP 2198
Lewis County Public Works is soliciting sealed bids for the Davison Rd MP 0.01 Bridge Rehabilitation project, identified as County Road Project 2198 and Federal Aid Project BHOS-2021(075). The scope of work involves providing all labor, materials, and equipment to improve the bridge, specifically focusing on replacing the deck and cleaning and painting the metal surfaces of steel truss members, floorbeams, stringers, and other steel components. The engineer's estimate for the project is between 1.9 and 2 million dollars. All work must comply with WSDOT 2026 standard specifications, and specific technical requirements include strict adherence to an in-water work window from April 1st to September 30th for cleaning and painting activities. Sealed bids must be submitted electronically or delivered to the Clerk of the Board of Lewis County Commissioners by 12:15 PM on Thursday, November 19, 2026. Proposals must include a bid deposit equal to five percent of the bid amount in the form of cash, certified check, cashier's check, or surety bond. Required documentation includes a signed proposal page acknowledging two addendums, a non-collusion declaration, wage law compliance certification, a bidder questionnaire, and a local agency certification for federal-aid contracts. The successful bidder will be required to provide a contract bond and submit certified payrolls on a weekly basis.
Public Works- Roads

POSTED

about 18 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The contract outlines the 2026 Local Street Renewal Program covering Elgin Avenue West and several other locations, divided into two main parts: City Funded Work and Manitoba Hydro Funded Work. The City Funded Work includes a wide range of street and pavement reconstruction, resurfacing, rehabilitation, pathway construction, and sewer repairs across various streets and alleys, such as Arlington Alley, Elgin Avenue West, Marigold Bay, and others. This part involves extensive activities including removal and reconstruction of asphalt and concrete pavements, installation of curbs, sidewalks, sewer and drainage systems, as well as landscaping elements like topsoil and sod placement. Notably, the new asphalt pathway work at Red River College is contingent upon receiving an “Enter to Construct” agreement, with a stipulated deadline by June 5, 2026, after which the City may reduce the scope and contract price if the agreement is not issued. The Manitoba Hydro Funded Work primarily focuses on street lighting installation and associated electrical works, including installation and removal of poles, bases, wiring, conduits, and ensuring proper connections and backfilling. This part depends on securing funding approval from Manitoba Hydro expected by late May, and if not approved, the City reserves the right to eliminate this work portion with a corresponding adjustment to the contract price and project timelines. The scope is comprehensive, covering full pavement lifecycle activities, drainage and utility upgrades, and electrical infrastructure improvements, with flexibility in contract adjustments based on funding outcomes and agreement issuance. The solicitation was posted by the City of Winnipeg with a response deadline of March 13, 2026, and all bidding documents are accessible via Merx.

General Info

2026 Local Street Renewal includes reconstruction, sewer repairs, pathway, and hydro-funded lighting installations.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → City of Winnipeg
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Drew MurrayContracting Authority

Full Description

Show more
D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of two parts: (a) Part 1 – City Funded Work (b) Part 2 – Manitoba Hydro Funded Work. Part 1 – City Funded Work D2.2 Part 1 – City Funded Work shall consist of: (a) Asphalt Pavement Reconstruction and Associated Works (i) Arlington Alley from Arlington Street to Tecumseh Street (ii) Elgin Avenue West from Keewatin Street to Worth Street (iii) Tecumseh Alley from Tecumseh Street to Emily Street (b) Asphalt Pavement Resurface and Associated Works (i) Dexter Alley from Ostafiew Farm Road to Brophy Avenue (ii) Logan Avenue from Brookside Boulevard to Omans Creek Boulevard (c) Concrete Pavement Reconstruction and Associated Works (i) Marigold Bay from Sinclair Street to Sinclair Street (d) Concrete Pavement Rehabilitation and Associated Works (i) Garden Park Alley from Templeton Avenue to Beecher Avenue (ii) McKelvey Street from Logan Avenue to End (e) Thin Bituminous Overlay and Associated Works (i) Poplynn Drive from Egesz Street to Egesz Street (f) New Asphalt Pathway and Associated Works (i) Red River College from Dalton Crescent to Skinner Road (g) Sewer Repairs and Associated Works (i) Marigold Bay from Sinclair Street to Sinclair Street (ii) McKelvey Street from Logan Avenue to End D2.3 The City currently has not received issuance of the “Enter to Construct” agreement for D2.2(f)(i) of the Work, but is anticipating receiving issuance from Red River College. D2.2(f)(i) of the Work is contingent upon issuance of this agreement. D2.3.1 Further to C7.1, if issuance of agreement is not received by June 5, 2026, the City will eliminate all or portion of D2.2(f)(i), and the Contract Price will be reduced accordingly. D2.3.2 Further to C7.5, C7.5.1 and C7.6, a reduction in the Contract Price pursuant to D2.3.1 shall not be considered in calculating the aggregate reduction in the Contract Price for purposes of C7.5. Part 2 – Manitoba Hydro Funded Work D2.4 Part 2 – Manitoba Hydro Funded Work shall consist of: (a) Street Lighting and Associated Works (i) Elgin Avenue West from Keewatin Street to Worth Street (ii) Marigold Bay from Sinclair Street to Sinclair Street D2.5 The City currently has no approved funding from Manitoba Hydro for Part 2 of the Work, but is anticipating receiving notification about funding from Manitoba Hydro by late May. Part 2 of the Work is contingent upon Manitoba Hydro approving sufficient funding. D2.5.1 Further to C7.1, if notice of sufficient funding is not received, the City shall have the right to eliminate all or any portion of Part 2, and the Contract Price will be reduced accordingly. D2.5.2 Further to C7.5, C7.5.1, and C7.6, a reduction in the Contract Price pursuant to D2.5.1 shall not be considered in calculating the aggregate reduction in the Contract Price for purposes of C7.5. D2.5.3 If all or any portion of Part 2 is eliminated pursuant to D2.5.1, the time periods stipulated in D19 for Substantial Performance of the Work and in D20 for Total Performance of the Work will be reduced proportionally by the Contract Administrator acting reasonably. D2.6 The major components of the Work are as follows: Part 1 – City Funded Work (a) Asphalt Pavement Reconstruction and Associated Works (i) Renewal of existing concrete sidewalk; (ii) Removal of existing pavements and curbs; (iii) Excavation; (iv) Compaction of existing sub-grade; (v) Replacement of pre-cast concrete risers; (vi) Installation of catch basins and sewer service pipe; (vii) Installation of subdrains; (viii) Insulation of watermains; (ix) Placement of geotextile fabric and geogrid; (x) Placement and compaction of sub-base material; (xi) Placement and compaction of base course material; (xii) Construction of 150mm concrete pavement (reinforced); (xiii) Construction of barrier curb and reversed gutter for asphalt pavement (SD-200AA) utilizing slip-form paving equipment; (xiv) Construction of modified barrier curb for asphalt pavement (SD-203C); (xv) Construction of curb ramp for asphalt pavement (SD-229F); (xvi) Construction of modified barrier curb; (xvii) Construction of barrier curb; (xviii) Construction of curb ramp; (xix) Adjustment of existing pavement and boulevard structures; (xx) Construction of manhole and curb and gutter inlet isolations; (xxi) Grading of boulevards; (xxii) Regrading of interlocking paving stones; (xxiii) Regrading of sidewalk blocks; (xxiv) Placement and compaction of topsoil; (xxv) Placement of main line bottom lift asphalt pavement – Type MS2, 65mm thickness; (xxvi) Placement of main line top lift asphalt pavement – Type MS1, 55mm thickness; (xxvii) Placement of asphalt pavement tie-ins – Type MS1; (xxviii) Placement of asphalt pavement tie-ins – Type MS3; and (xxix) Placement of sod. (b) Asphalt Resurfacing and Associated Works (i) Ditching; (ii) Excavation; (iii) Placement and compaction of sub-base material; (iv) Placement and compaction of base course material; (v) Construction of modified barrier curb and gutter (vi) Planing of existing asphalt; (vii) Installation of pavement repair fabric; (viii) Grading of boulevards; (ix) Placement and compaction of topsoil; (x) Placement of asphalt pavement – Type MS1 (xi) Placement of asphalt pavement tie-ins – Type MS3; and (xii) Placement of sod. (c) Concrete Pavement Reconstruction and Associated Works (i) Renewal of existing concrete sidewalk; (ii) Removal of existing pavements and curbs; (iii) Excavation; (iv) Compaction of existing sub-grade; (v) Replacement of pre-cast concrete risers; (vi) Installation of catch basins and sewer service pipe; (vii) Installation of subdrains; (viii) Insulation of watermains; (ix) Placement of geotextile fabric and geogrid; (x) Placement and compaction of sub-base material; (xi) Placement and compaction of base course material; (xii) Construction of 230mm concrete pavement (plain-dowelled); (xiii) Construction of 200mm concrete approach (reinforced); (xiv) Construction of 150mm concrete approach (reinforced); (xv) Construction of modified barrier curb; (xvi) Construction of barrier curb; (xvii) Construction of lip curb; (xviii) Construction of curb ramp; (xix) Adjustment of existing pavement and boulevard structures; (xx) Construction of manhole and curb and gutter inlet isolations; (xxi) Grading of boulevards; (xxii) Regrading of interlocking paving stones; (xxiii) Regrading of sidewalk blocks; (xxiv) Placement and compaction of topsoil; (xxv) Installation of detectable warning surface tiles; and (xxvi) Placement of sod. (d) Concrete Pavement Rehabilitation and Associated Works (i) Removal of existing asphalt as required; (ii) Renewal of existing concrete sidewalk; (iii) Renewal of existing curb as required; (iv) Construction of modified barrier curb; (v) Construction of curb ramp; (vi) Abandoning existing drainage inlets; (vii) Replacement of pre-cast concrete risers; (viii) Installation of catch basins and sewer service pipe; (ix) Adjustment of existing pavement and boulevard structures; (x) Full depth concrete repairs of existing slabs and joints; (xi) Grading of boulevards; (xii) Regrading of interlocking paving stones; (xiii) Regrading of sidewalk blocks; (xiv) Placement and compaction of topsoil; (xv) Placement of main line asphalt pavement overlay – Type MS1 – 80mm average thickness (two lifts); (xvi) Installation of pavement repair fabric between asphalt pavement lifts – Type B; (xvii) Placement of asphalt pavement overlay tie-ins – Type MS1, 50mm average thickness; (xviii) Construction of asphalt speed hump – Type MS1; and (xix) Placement of sod. (e) Thin Bituminous Overlay and Associated Works (i) Full depth concrete repairs of existing joints; (ii) Renewal of existing modified lip curb as required; (iii) Excavation (iv) Placement and compaction of base course material; (v) Construction of 100mm concrete sidewalk; (vi) Construction of 150mm monolithic concrete sidewalk (reinforced); (vii) Regrading of interlocking paving stones; (viii) Grading of boulevards; (ix) Placement and compaction of topsoil; (x) Placement of main line asphalt pavement overlay – Type MS1, one lift, 50mm average thickness; (xi) Placement of asphalt pavement overlay tie-ins – Type MS1; (xii) Placement of asphalt pavement overlay tie-ins – Type MS3; and (xiii) Placement of sod. (f) New Asphalt Pathway and Associated Works (i) Removal of existing concrete sidewalk; (ii) Removal of existing asphalt pathway; (iii) Excavation; (iv) Compaction of existing sub-grade; (v) Placement of Geotextile Fabric; (vi) Placement and compaction of sub-base material; (vii) Placement of Geogrid; (viii) Placement and compaction of base-course material; (ix) Renewal of existing curb ramps; (x) Renewal of existing barrier curb; (xi) Renewal of existing sidewalks as required; (xii) Placement of asphalt pavement - Type MS1 – 75mm (one lift); (xiii) Placement and compaction of topsoil; (xiv) Installation of detectable warning surface tiles; and (xv) Placement of sod. (g) Sewer Repairs and Associated Works (i) Pre-construction sewer and sewer service video inspection; (ii) Replacement of catch basin leads; (iii) External point repair of existing sewer service pipe or sewer main; (iv) Installation of new manhole; (v) Replacement of pre-cast concrete risers; (vi) Repair and Replacement of existing manhole benching; and (vii) Sewer and sewer service video inspection. Part 2 – Manitoba Hydro Work (h) Street Lighting and Associated Works (i) Installation of foundation – concrete base; (ii) Installation of breakaway bases; (iii) Installation of street light poles on concrete bases; (iv) Installation of 10’ ground rods; (v) Installation of the luminaire and associated wiring; (vi) Splicing /connecting of electrical cables; (vii) Excavation of street light cable/conduit trench; (viii) Installation of conduits and cables; (ix) Backfill the street light cable/conduit trench; (x) Removal of street light poles from existing bases; (xi) Removal of concrete bases and direct buried street light poles; (xii) Installation of temporary overhead feed; (xiii) Removal of temporary overhead feed; and (xiv) as-built drawing of the buried street light cable, conduits and street light dards. Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS