This Solicitation opportunity from Pennsylvania was posted on July 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Borough of Jenkintown is soliciting sealed bids for the 2026 Mill and Overlay Project, Contract 26-03, which involves furnishing all labor, materials, tools, and equipment for mill and overlay paving on designated roads within the borough. Bids must be submitted electronically via PennBid by 11:00 AM on June 15, 2026, and will be publicly opened at that time. All bid documents are accessible online through the PennBid portal, with optional hard copy purchases available for $100. The estimated project cost is $100,000, and bidders proposing amounts equal to or exceeding this threshold must demonstrate competency and responsibility in accordance with Borough Ordinance No. 2008-2, which adopts a Model Responsible Contractor Ordinance. Each bid must be accompanied by a certified check or bid bond equal to at least 10% of the bid amount, issued by a surety company licensed in Pennsylvania. Bids cannot be withdrawn within 60 days of the bid opening. Successful bidders are required to furnish Performance and Labor and Material Bonds for 100% of the contract amount, a Maintenance Bond equal to 25% of the contract price, and a Certificate of Insurance. Prevailing wage rates mandated by Pennsylvania law apply to contracts exceeding $100,000, and bidders must participate in a Class A Apprenticeship Program, submitting verification upon award. A non-mandatory virtual pre-bid meeting is scheduled for May 29, 2026. The contract follows a Lowest Price Technically Acceptable (LPTA) award basis, with technical compliance assessed on pass/fail criteria including asphalt content, gradation, and pavement density standards per PennDOT Publication 408, with payment adjustments applied for density performance deviations. Work must be completed within 45 consecutive calendar days after receiving written authorization from the Engineer, and all operations must be confined strictly to the project site as shown on drawings, with no material storage permitted on public roads. Inspection and acceptance occur at both the production plant and roadway, with the Borough retaining sole authority to accept or reject work, and contractor responsibilities remain unaffected by inspection. All proposals must include mandatory forms such as the Proposal Form, Responsibility Certification, Experience Questionnaire, Subcontractor List, Bid Bond, Itemized Bid Tab, and PennDOT MS-944, submitted exclusively through PennBid. The Borough
General Info
Jenkintown seeks bids for 2026 road milling and paving, due June 15, with bonding and wage compliance.
HighAI Summary for 01201 Preconstruction Conference: Section 01201 Preconstruction Conference document outlines the procedures for a preconstruction conference conducted by the Engineer prior to the start of construction work. It includes requirements for attendance by designated personnel from the Contractor, subcontractors, and suppliers, and details the agenda topics such as organizational arrangements, communication procedures, construction schedule, contract documents, shop drawing processing, change orders, and safety protocols. The document emphasizes quality assurance and submittal instructions, including advance notice for agenda items and distribution of conference minutes. This document is essential for clarifying contract administration and ensuring coordinated project execution.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01201 Preconstruction Conference Specifications: This document, section 01201, outlines the Preconstruction Conference procedures for construction contract administration. It specifies the requirement for attendance by designated personnel from the Contractor, subcontractors, and suppliers, and details the agenda topics including organizational arrangements, communication procedures, construction schedule, contract documents, shop drawings processing, change orders, and safety and quality control measures. The conference is scheduled within ten working days after contract execution but before work start. The Engineer compiles and distributes minutes of the conference.
PDF
PDF, High priority: read this firstsow
HighAI Summary for 01340 Shop Drawings, Product Data and Samples: Section 01340 outlines the requirements for submitting Shop Drawings, Product Data, and Instruction Manuals as part of the contract documents. It includes instructions on the preparation, content, and submission process for these documents, emphasizing clarity, identification, and compliance with standards. The document specifies the need for electronic submissions, details the required information on submittals such as project title, contract number, and product identification, and mandates contractor certification. It also covers resubmission procedures to address corrections until approval is obtained. This section serves as a statement of work guiding the submission and approval of critical project documentation.
PDF
PDF, High priority: read this firstsow
HighAI Summary for 01700 Project Closeout: Section 01700 Project Closeout outlines the procedures and requirements for project closeout including substantial completion, final observation, second observation fees, closeout submittals, spare parts and maintenance materials, final adjustment of accounts, and final application for payment. It specifies the steps for submitting notices of substantial completion, certifications of work completion, and handling deficiencies. The document also details the financial reconciliation process and final payment application. This section is critical for ensuring proper project closeout and compliance with contract documents.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01720 Project Record Documents: This document, Section 01720 titled 'Project Record Documents,' outlines the requirements for maintaining and submitting project record documents at the job site. It specifies the types of documents to be kept, including drawings, specifications, amendments, change orders, shop drawings, product data, and samples. The document details the labeling, recording, and annotation procedures to ensure accurate and legible records of construction progress and changes. It also describes the submittal process at project completion, requiring sets of annotated drawings and record documents along with a certification letter from the contractor. The document follows the Construction Specifications Institute (CSI) Data Filing Format and emphasizes maintaining documents in good order for inspection.
PDF
PDF, High priority: read this firstsow
HighAI Summary for 2026 Paving - Section 01010 Contractor's Work: Technical specifications for the 2026 paving project, covering milling, paving, base/subgrade repair, and thermoplastic line striping for Borough roads (Cedar St. and Harper Ave). The document outlines contractor responsibilities, construction limits, measurement of work, and compliance with PennDot 408 requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2026 Paving Special Provisions: Special Provisions (Section 01001) for the 2026 Paving project. The document outlines critical contract requirements, including a performance schedule (July 30 to August 30, 2026), pre-construction video requirements, bidder qualification criteria, coordination mandates, and operational constraints such as nuisance ordinances and dust control.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2.6 Admin Specs 01720 Project Record Documents - Section 411 Superpave Mixture Design: Technical specifications for Section 411 regarding Superpave Mixture Design and the construction of plant-mixed Warm Mix Asphalt (WMA) courses. The document details material requirements for bituminous materials, WMA technology additives, mixture composition, Producer QC Plan requirements, and temperature tolerances for various asphalt cement grades.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Borough of Jenkintown 2026 Mill and Overlay Project Advertisement: Public notice and invitation for sealed bids for the Borough of Jenkintown's 2026 Mill and Overlay Project (Contract 26-03). The project involves labor, materials, and equipment for base repairs, milling, and paving of selected roads. Bids are due by June 15, 2026, at 11:00 AM via PennBid. Requirements include a 10% bid bond, proof of competency for bids over $100,000, and adherence to PA Prevailing Wages for contracts exceeding $100,000. A non-mandatory virtual pre-bid meeting is scheduled for May 29, 2026.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Borough of Jenkintown 2026 Mill and Overlay Project - Bid Forms: This document contains the bid submission forms for the Borough of Jenkintown's 2026 Mill and Overlay Project. It includes the bid security form, subcontractor list, addendum acknowledgment, a comprehensive Contractor Responsibility Certification (referencing Ordinance #08-01), and an experience questionnaire.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Borough of Jenkintown 2026 Mill and Overlay Project - Front End Docs: Front-end solicitation documents for the Borough of Jenkintown's 2026 Mill and Overlay Project. The file includes bid security forms, subcontractor lists, addendum acknowledgments, a non-collusion certification, a detailed Contractor Responsibility Certification (complying with Ordinance #08-01), and an experience questionnaire.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Borough of Jenkintown 2026 Milling and Overlay Project (Contract No. 26-03): Invitation for Bids (IFB) issued in May 2026 for the Borough of Jenkintown's 2026 Milling and Overlay Project (Contract No. 26-03). The document includes instructions to bidders, general and special conditions, construction specifications referencing PennDOT Publication 408, and bid submission requirements via the PennBid electronic platform. It outlines the necessity of a 10% bid guaranty and provides a comprehensive table of contents for the contract documents.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Jenkintown 2026 Milling and Paving - Prevailing Wage Rates: Prevailing wage project rates issued by the Bureau of Labor Law Compliance for the Jenkintown 2026 Milling and Paving project (Serial Number 26-04646). The document specifies hourly rates and fringe benefits for various labor classifications, including electricians, carpenters, and operators, with a determination date of 5/11/2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01001 Special Provisions: This document outlines the Special Provisions (Section 01001) for a construction project. It specifies a work schedule (July 30, 2026, to August 30, 2026), requirements for pre-construction videos, bidder qualification criteria, coordination with other contractors, and operational constraints including nuisance ordinances and dust control. It also details the Borough's right to withhold payment for deficient work and the requirement for Certificates of Conformance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01001 Special Provisions: This document outlines the Special Provisions for a construction project, including a project schedule (Aug 16, 2025, to Sept 30, 2025), pre-construction video requirements, bidder qualification criteria, and operational constraints such as nuisance ordinances and dust control. It specifies the contractor's responsibilities regarding public utilities, easements, and coordination within the Borough.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01010 - Contractor's Work: Technical specifications for Section 01010 regarding contractor responsibilities for a road project involving milling, paving, base/subgrade repair, and thermoplastic line striping. The document outlines construction limits, measurement of work, cleanup requirements, and compliance with PennDot 408 requirements and OSHA codes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01010 - Contractors Work: Technical specifications for the 'Contractors Work' section of a road project involving milling, paving, base/subgrade repair, and thermoplastic line striping for Borough roads. It outlines contractor responsibilities, construction limits (Cedar St and Harper Ave), measurement of work, site protection, and compliance with PennDot 408 requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01025 Measurement and Payment: Technical specification section 01025 detailing the criteria for measurement and payment for work performed under Unit Price and Lump Sum methods. It defines measurement methods by number, volume, area, and linear dimension, outlines payment inclusions, and specifies conditions for non-payment of rejected products.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01025 - Measurement and Payment: Technical specification section 01025 detailing the criteria for measurement and payment for work performed under Unit Price and Lump Sum methods. It defines measurement methods (number, volume, area, linear), payment inclusions, defect assessment, and non-payment conditions for rejected products.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01025 Measurement & Payment: This technical specification section outlines the criteria for measurement and payment for work performed under Unit Price and Lump Sum methods. It defines measurement methods by number, volume, area, and linear dimensions, and specifies that payment includes all supervision, labor, and materials. It also details conditions for non-payment regarding rejected products and the requirement for Engineer verification of quantities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01201 Preconstruction Conference Special Provisions: This document outlines the requirements for the Preconstruction Conference, including attendance mandates for the Contractor and subcontractors, the timeline for scheduling (within 10 working days of contract execution), and the minimum agenda items to be discussed to clarify contract administration procedures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01340 Shop Drawings, Product Data and Samples: Technical specification section 01340 detailing the requirements for the submission of shop drawings, product data, and instruction manuals. It outlines the necessary content for submittals, electronic submission requirements, and the process for resubmissions and engineer approvals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01340 Shop Drawings, Product Data and Samples: Technical specification section 01340 detailing the requirements for the submission of shop drawings, product data, and instruction manuals. It outlines the necessary content for submittals, electronic submission requirements, and the process for resubmissions and engineer approvals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01700 Project Closeout: Technical specifications for Section 01700 Project Closeout, detailing procedures for substantial completion, final observation, closeout submittals, spare parts delivery, and final adjustment of accounts and payment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01700 Project Closeout Specifications: This document is Section 01700 titled 'Project Closeout' and outlines the procedures and requirements for project closeout. It includes instructions for substantial completion, final observation, second observation fees, closeout submittals, spare parts and maintenance materials, final adjustment of accounts, and final application for payment. The document specifies the process for submitting notices and certifications, observation protocols, handling deficiencies, and final accounting adjustments. It is a critical technical specification for project closeout activities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01720 Project Record Documents: Technical specification section 01720 detailing the requirements for maintaining and submitting project record documents, including drawings, amendments, and shop drawings, to ensure accurate as-built documentation upon project completion.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 350-Subbase Administrative Specifications: Technical specifications for the preparation and construction of compacted aggregate subbase. The document details material requirements (Type C, No. 2A, and No. OGS aggregates), construction methods, equipment, compaction density standards, surface tolerances, and measurement/payment terms based on area, volume, or mass.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 409—Superpave Mixture Design, Standard and RPS Construction of Plant-Mixed HMA Courses: Technical specifications for the construction of plant-mixed Hot Mix Asphalt (HMA) using Superpave mixture design. The document details requirements for bituminous materials, aggregates, Recycled Asphalt Material (RAP/RAS), mixture composition, and mandatory Producer Quality Control (QC) plans and technician certifications.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseAwarded
Posted
Solicitation
Notice updated
Solicitation number changed from Borough of Jenkintown, Montgomery County to 194146. The notice description changed.
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Ref. #: Borough of Jenkintown, Montgomery County .PUBLIC NOTICE IS HEREBY GIVEN to all prospective bidders that the Borough of Jenkintown will receive sealed bids for the following contract: 2025 ADA Curb Ramps and Mill and Overlay Project. Sealed bids shall be submitted and updated online until 11:00 AM., prevailing time, on the 30th day of July 2025 at which time they will be publicly opened and read. All documents and solicitation details are available any time at PennBid (https://pennbid.bonfirehub.com) by clicking on the bids tab. Hard copies of all documents may be optionally purchased through PennBid. Estimated cost is $100.00. Project drawings and documents are available for inspection at the offices of Borough of Jenkintown, located at 700 Summit Avenue, Jenkintown, PA 19046 2025 Mill AND OVERLAY PROJECT
JENKINTOWN BOROUGH, MONTGOMERY COUNTY
CONTRACT 25-01 This project includes the furnishing of all labor, materials, tools and equipment for the paving of selected roads within the Borough to include: base repairs, milling, and paving. Bids must be submitted unconditionally. No bidder may withdraw a bid within SIXTY (60) days after the scheduled closing time for receipt of bids. Each proposal must be accompanied by a certified check or bid bond payable to the Borough of Jenkintown in an amount of not less than ten percent (10%) of the bid or bids. Only bonds from companies licensed, to do business in the Commonwealth of Pennsylvania will be accepted and the bond shall state same. All bidders submitting a bid greater than or equal to $100,000 are required to establish proof of competency and responsibility, in accordance with Jenkintown Borough Ordinance No. 2008-2, “An Ordinance of the Borough of Jenkintown Adopting a Model Responsible Contractor Ordinance”. Bid surety checks and bid bonds will be returned to unsuccessful bidders after the awarding and signing of the Contract. The successful bidder(s) will be required to furnish Performance and Labor and Material Bonds in one hundred percent (100%) of the amount of the contract; a Maintenance Bond in the amount of twenty-five percent (25%) of the total contract price, as well as a Certificate of Insurance. If bid is greater than $100,000 for this Milling and Overlay project PA Prevailing Wages are required. The Borough reserves the right to waive any informality, or to reject any or all bids, or take such action as it may deem in the best interest of the Borough and as may be permitted by law.