Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on May 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Overlay Project

Closed
WJPW26052601State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention and quality control. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must be invited through the Building Connected electronic system, with the bid deadline set for November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract for the 2026 West Jordan Roadway Overlay Project involves resurfacing up to five collector streets including 5600 West, 7800 South, Prosperity Road, Old Bingham Highway, and Gardner Lane. The scope of work encompasses milling and overlaying sections of these streets, adjusting utility manholes, valves, and monuments to proper levels, replacing ADA-compliant ramps, repairing or replacing curbs and sidewalks, and applying traffic markings and striping according to project plans. Special scheduling requirements apply to Old Bingham Highway and Gardner Lane, where all work must be completed between the end of the school year in June and the beginning of the next school cycle in August. The contractor is responsible for securing all necessary permits to carry out the work, ensuring compliance with both Utah Transit Authority (UTA) and Utah Department of Transportation (UDOT) regulations as part of the permitting process. The solicitation for this project was posted on May 26, 2026, with a response deadline set for June 17, 2026. The project is managed by the State of Utah, but specific contact information is not provided in the solicitation data. The work location is within Utah, and the overall goal is to improve the roadway infrastructure through careful and timely overlay and associated improvements.

General Info

2026 West Jordan project: resurfacing five streets, utility adjustments, ADA ramps, curb repairs, special summer schedule.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

3

WJPW26052601 2026 West Jordan Roadway Overlay Project Invitation for Bids

PDF, High priority: read this firstrfb
High

COI Guide for Contractors

PDF, Low priority1 page · other
Low

Pre-bid Log Sheet for WJPW2652041 2026 Overview Profile

PDF, Low prioritypre-bid-log-sheet
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
ContactsNo contact information available

Full Description

Show more
The work that is the subject of the bid comprises the overlay of up to five collector streets (the “Work”) for the 2026 West Jordan Roadway Overlay Project. The Work includes milling and overlaying portions of 5600 West, 7800 South, Prosperity Road, Old Bingham Highway, and Gardner Lane; the lowering and raising of utility manholes, valves, and monuments; replacing ADA ramps; repairing or replacing curb and sidewalk; and installing traffic markings and striping per plans. Work on Old Bingham Highway and Gardner Lane must be conducted after school ends in June and be complete before school begins in August. The Contractor shall obtain all required and necessary permits to perform the work, including obtaining and following UTA and UDOT requirements under such permit(s).

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

2 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS