Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on June 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Pavement Preservation - Scrub Seal Project, City of Poulsbo, WA #CN2026-10

Closed
CN2026-10State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs and signals, along with environmental support services including SWPPP and quality control. Material needs include ready mix supply, precast concrete, and steel casing. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 237310
New
SLED
Davison Rd MP 0.01 Bridge Rehabilitation
Solicitation # CRP 2198
Lewis County is soliciting sealed bids for the Davison Rd MP 0.01 Bridge Rehabilitation project (CRP 2198), a Federal Aid project (BHOS-2021(075)) with an engineer's estimate between 1.9 and 2 million dollars. The scope of work requires the contractor to provide all labor, materials, and equipment to improve the bridge, specifically focusing on replacing the deck and cleaning and painting the metal surfaces of steel truss members, floorbeams, stringers, and other steel components. All work must comply with WSDOT 2026 standard specifications, and the contractor must provide record drawings documenting all changes. Notably, Addendum 1 restricts bridge cleaning and painting to the In-Water Work Window from April 1st to September 30th. Sealed bids must be submitted electronically or delivered to the Clerk of the Board of Lewis County Commissioners by 12:15 PM on Thursday, November 19, 2026. Proposals must include a bid deposit equal to five percent of the bid amount in the form of cash, certified check, cashier's check, or surety bond. A complete bid package requires a proposal signature page acknowledging all addendums, a non-collusion declaration, wage law compliance certification, a bidder questionnaire, and a power equipment list. The project includes specific quality standards for hot mix asphalt and requires a contractor demonstration for rivet removal methods to ensure no damage to existing members.
Public Works- Roads

POSTED

about 14 hours ago

DEADLINE

in 15 days
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The City of Tustin is soliciting bids for the Tustin Legacy Linear Park Phase 3 project (CIP No. 20083), located between Armstrong and Warner. This construction project involves the development of a multi-modal path, walking trails, a playground, fitness pods, and extensive landscaping. Key deliverables include a 12-foot main multi-modal path, a 6-foot secondary walking trail, and various paving installations using concrete, stabilized decomposed granite, and PIP rubber. The scope also encompasses site work, electrical installations for pedestrian and street lighting, and adherence to a Final Water Quality Management Plan and Storm Water Pollution Prevention Plan. The engineer's estimate for the project is $11,100,000, with a performance period of 190 contract days. Bidders must hold a Class A contractor's license and provide a California Department of Industrial Relations Registration number. Bids are due electronically via OpenGov by December 10, 2026, at 2:00 pm, with the critical requirement that a hard copy original of the bid bond be delivered to the City Clerk by the same deadline to avoid being deemed non-responsive. The contract will be awarded to the apparent low bidder. Contractual obligations include providing payment, faithful performance, and guaranty bonds, as well as maintaining workers' compensation insurance and complying with California Labor Code prevailing wage requirements. Payment will be issued through monthly progress payments at 95% of the work value, with the final 5% retained until 60 days after the recordation of the Notice of Completion and the submission of as-built plans. Liquidated damages for delays are set at $8,800 per calendar day. All work must conform to 2008 ADA Standards for Accessibility and Cal-OSHA safety requirements.
Public Works

POSTED

about 14 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Poulsbo, Washington, is soliciting bids for the 2026 Pavement Preservation Scrub Seal Project, identified as solicitation number CN2026-10. The project involves the application of scrub seal and fog seal treatments across 3.65 miles of neighborhood roads, totaling 32 different locations. All work is to be performed within City right-of-way or on City property. The scope of work includes mobilization, cleanup, and the implementation of necessary temporary traffic control. The contractor is responsible for furnishing all labor, materials, equipment, and tools required to apply emulsified asphalt and aggregate for the scrub seal and the final fog seal treatment. The project is scheduled to be executed between July 15, 2026, and September 30, 2026.

General Info

Poulsbo solicits bids for scrub and fog seal treatments on 3.65 neighborhood miles.

Place of Performance

Poulsbo, WA, 98370, USA

Set-Aside

NONE

Documents

195
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG
JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Poulsbo
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → City of Poulsbo
Office AddressN/A

Interested Companies (6)

Northwest BarricadeEverett, WA
American Pavement SystemsModesto, CA
Sierra Santa FeRidgefield, WA

See All 6 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The project consists of work to be performed between July 15, 2026 & September 30, 2026 and consists of furnishing all materials, equipment, tools, labor, and other work or items incidental theretofore and as generally described as follows:
Construction of the 2026 Pavement Preservation – Scrub Seal Project which shall consist of, but not be limited to:
1. Mobilization and cleanup
2. Temporary traffic control necessary to complete the project
3. Application of emulsified asphalt and aggregate for Scrub Seal treatment
4. Application of emulsified asphalt for fog seal treatment
All work will be located within the City right-of-way or on City property. The project consists of completing a scrub seal treatment and finishing with a fog seal on 32 neighborhood roads totaling 3.65 miles.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS