Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

2026 SAP Road Striping Project

Active
PE-77082-NONST-2026-000000007State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mitchell County Board of Commissioners in Georgia has issued a solicitation for the 2026 SAP Road Striping Project, identified by solicitation number PE-77082-NONST-2026-000000007, posted on July 7, 2026. This project is classified under a state and local government (SLED) procurement, with all work required to be performed within the state of Georgia. The deadline for responses is set for August 6, 2026, at 3:00 PM Eastern Time, and interested parties must submit their proposals through the designated state procurement portal before this date. No set-aside classifications or NAICS codes are specified, indicating the solicitation is open to all qualifying vendors without preference for small businesses or special categories. The primary point of contact for inquiries is Brent Davis, reachable via email at brent@reliableeng.net, and additional details regarding requirements and evaluation criteria can be accessed through the official UI link provided.

General Info

Mitchell County GA seeks bids for 2026 SAP Road Striping Project by August 6, 2026, via state portal.

Agency

Georgia → Mitchell County Board of CommissionersView Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(1)

Invitation to Bid 2026 SAP Road Striping Project

PDFitb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Mitchell County Board of Commissioners
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → Mitchell County Board of Commissioners
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
Road Construction

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months
View Details