This Solicitation opportunity from Iowa was posted on February 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2026 Seton Addition Cabling Project - Bishop Garrigan
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Bishop Garrigan Catholic Schools is soliciting bids for network cabling and rack infrastructure for a new addition to the Seton building. The project requires the installation of two wall-mount racks, 61 Category 6a Ethernet runs, and a minimum 6-strand single-mode fiber optic backbone connecting the new IDF to the existing building IDF. The scope includes providing all necessary patch panels, distribution panels, and patch cables, with a specific requirement for dual Cat6a wiring to 26 classroom access points and cabling for smartboard locations. All installations must be logically labeled and undergo rigorous testing, with results delivered in PDF format. Proposals must be submitted by 9:00 am CST on Friday, March 20, 2026, and must itemize equipment, installation, and applicable taxes or fees. Construction is scheduled to begin no earlier than May 2026, and pricing must remain firm through September 30, 2027. Bidders must certify compliance with FCC Lowest Corresponding Price guidelines and security regulations prohibiting equipment from covered companies such as Huawei and ZTE. Technical inquiries and site walkthroughs are coordinated through Foster Krug, while final proposals should be emailed to Lisa Charbonneaux.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 11 days
- Transformer Oil Testing ServicesOpen now, due in 29 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Scope of Work: * Total Ethernet: 61 total Category 6a (Cat6a) runs terminating in the new IDF. * Fiber Backbone: One (1) Single-Mode fiber optic cable (minimum 6-strand) connecting the new IDF to the existing building IDF.
Termination and Patching * Ethernet: Vendor must provide and install Cat6a patch panels to accommodate 61 total drops. * Fiber: Vendor must provide and install fiber distribution panels (LIU/Enclosures) at both the new IDF and the existing building IDF. * Testing: All 6-strands of Single-Mode fiber and all 61 Cat6a runs must be tested (Tier 1 for fiber; Permanent Link for Cat6a). Test results must be provided in PDF format. * Labeling: All ports at the patch panel and the wall plate/AP location must be logically labeled per District standards.
Patch Cables: Vendor must include Cat6a patch cables for both the closet (IDF) and station ends (APs/Classrooms). Timeline:
Construction begins no earlier than May 2026. Vendor must coordinate installation phases with the Project Manager.
Bidding Instructions: * Blueprints/floor plans are available upon request. * Site walkthroughs can be scheduled by contacting Foster Krug at •••••@•••••.•••Sign up to see this detail. * All technical questions must be submitted via email to •••••@•••••.•••Sign up to see this detail.
Equipment Preferences: * SKU 00406449 NavePoint 9U Wall-Mount Network Cabinet, 450mm Depth, Hinged Back (Swing Gate Series) or equivalent * NKFPL24 Panduit 24 Port Keystone Patch Panel or equivalent * NK6X88MBL Category 6A UTP RJ45 Punchdown Keystone Jack Module or equivalent * NKFPL86F2SAW Panduit Flat Faceplate or equivalent
Installation Notes: Dual Cat6a or above wiring to all classroom APs (26) from the new Seton office Cat6a Cable runs to the new smartboard locations from the new Seton office
Bids should itemize: * cost of equipment * cost of installation * cost of taxes/fees/shipping, if applicable.
Robo-bids and bids sent as SPAM without regard to products and services listed on the Form 470 and/or the RFP will be disqualified and will not be evaluated.
By submitting a bid, the vendor certifies that its proposed prices are consistent with the FCCs Lowest Corresponding Price (LCP) and that equipment and services are compliant with FCCs recent Order (FCC 19-121) prohibiting the sale, provision, maintenance, modification or other support of equipment or services provided or manufactured by Huawei, ZTE or any other covered company deemed a national security threat.
Prices need to be held firm through the duration of the 2026 E-Rate Category 2 installation period (from date of bid to September 30, 2027).
We reserve the right to cancel this request for bids and to reject all related proposals
The deadline for vendor proposals is 9:00 am Central Standard Time, Friday March 20th, 2026. We reserve the right to reject late-submitted proposals. Proposals must be emailed to Lisa Charbonneaux - •••••@•••••.•••Sign up to see this detail
Requested services (3 line items): - Category 2 — Internal Connections — Antennas, Connectors, And Related Components - Category 2 — Internal Connections — Racks - Category 2 — Internal Connections — Cabling
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260020930/229436/21149530-USAC_FCC_FORM_470_APPLICATION_260020930_CERTIFIED.pdf
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
