Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Shima Bakery Remodel

Closed
2026-RFB-021State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 27, 2026, with a response deadline of November 4, 2026. To secure project financing, bidders must strictly adhere to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements. Bids will be deemed non-responsive if they fail to include proof of GFE #2, requiring solicitations to be posted in an online publication for 30 consecutive calendar days and in a print newspaper for one day prior to the bid opening. Additionally, proof of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA) per GFE #5 must be submitted with the bid package. Documentation for outreach efforts under GFE #1 may be submitted up to three business days after the bid closing. Prime contractors are further required to flow down these GFE requirements to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves comprehensive architectural repairs, including the replacement of drywall, painting, ceiling tiles, flooring, and rubber wall bases, as well as electrical and plumbing restoration to return the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, compliance with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, and adherence to Davis-Bacon Act wage determinations. Contractors must provide a one-year workmanship guarantee and a 20-year product warranty for Luxury Vinyl Plank flooring.
Grafton Job Corps

POSTED

about 8 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 8 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The San Joaquin Delta Community College District is seeking contractors for the 2026 Shima Bakery Remodel project, with a solicitation number of 2026-RFB-021 and a bid submission deadline of June 25, 2026. The project, valued at $770,000, involves comprehensive renovations to a bakery classroom facility at the District’s Stockton Main Campus, encompassing installation of commercial ovens, walk-in coolers and freezers, plumbing fixtures, electrical extensions, and flooring modifications. All work must comply with applicable California building codes including Title 24, the 2010 California Electrical Code, NFPA 54, NFPA 96, ASHRAE 15, ASTM standards, and NSF and UL certifications, with technical specifications taking precedence over drawings in case of conflict. The performance period begins 90 days after the Notice to Proceed, anticipated for July 24, 2026, and must be completed within 90 calendar days, targeting an October 2026 closeout. Contractors must submit detailed schedules, ensure all systems are fully operational and inspected, obtain final certificates of occupancy, and deliver closeout documentation such as operation and maintenance manuals. All submissions must be made electronically via the OpenGov portal in PDF format with digital signatures accepted through certified platforms like DocuSign, while the Bid Bond must be physically delivered by hand or mail to the District’s procurement office in Stockton. Bidders are required to comply with California-specific regulations including DIR registration, adherence to IRCA, avoidance of conflicts of interest per Government Code §1090, and maintenance of an Experience Modification Rate of 1.25 or lower for any subcontractors. Insurance coverage must include commercial general liability, automobile liability, and builder’s risk, with the potential for an Owner-Controlled Insurance Program to supersede contractor-provided coverage. Safety standards mandate OSHA compliance, weekly safety meetings, use of personal protective equipment, and a strict prohibition on controlled substances or alcohol on-site. Packaging and storage of materials must prevent damage, maintain legibility of manufacturer labels including batch and expiration dates, and protect against environmental exposure, with work subject to inspection at fabrication sites and the project location. Acceptance authority resides solely with the District’s Board of Trustees upon verification of substantial completion and resolution of all punch list items. Failure to meet mandatory certifications, including those related to Iran investment or DIR registration, can lead

General Info

California Community College District seeks contractors for 2026 Shima Bakery remodel, responses due June 25.

Documents

26

2026 Shima Bakery Remodel Project 2026-RFB-021 Summary of Costs and Bid Breakdown

PDF, High priority: read this firstbid-breakdown
High

2026 Shima Bakery Remodel Project Specifications

PDF, High priority: read this firstspecifications
High

2026 Shima Bakery Remodel RFB 2026-RFB-021

PDF, High priority: read this firstrfb
High

Acknowledgment of Addenda for 2026 Shima Bakery Remodel

PDF, High priority: read this firstacknowledgment-of-addenda
High

Attachment AA - DSA Structural Tests and Special Inspections

PDF, High priority: read this firstsow
High

Attachment A - Bid Form for 2026 Shima Bakery Remodel 2026-RBF-021

PDF, High priority: read this firstbid-form
High

Attachment H - Workers Compensation Certificate for 2026 Shima Bakery Remodel

PDF, High priority: read this firstworkers-comp-cert
High

Attachment I - Bidder's Representations and Certifications for 2026 Shima Bakery Remodel

PDF, High priority: read this firstrepresentations-and-certifications
High

Attachment M - Designation of Subcontractors for 2026 Shima Bakery Remodel

PDF, High priority: read this firstdesignation-of-subcontractors
High

Attachment O - Agreement to be Bound for San Joaquin Delta CCD PLA

PDF, High priority: read this firstagreement-to-be-bound
High

Attachment S - Low Bid Contract for 2026 Shima Bakery Remodel

PDF, High priority: read this firstcontract-document
High

Attachment T - Special Conditions for Construction Contract

PDF, High priority: read this firstspecial-conditions
High

Attachment V - Approved Plans for 2026 Shima Bakery Remodel

PDF, High priority: read this firstspecifications
High

Bid Bond Attachment C for San Joaquin Delta CCD 2026 Shima Bakery Remodel

PDF, High priority: read this firstbid-bond
High

Payment Bond for 2026 Shima Bakery Remodel Contract

PDF, High priority: read this firstpayment-bond
High

Performance Bond for 2026 Shima Bakery Remodel Project

PDF, High priority: read this firstperformance-bond
High

Project Labor and Community Workforce Agreement - San Joaquin Delta CCD

PDF, High priority: read this firstagreement
High

Attachment E - Non-Collusion Declaration for 2026 Shima Bakery Remodel

PDF, Low prioritynon-collusion-declaration
Low

Attachment F - Non-Discrimination Declaration for 2026 Shima Bakery Remodel

PDF, Low prioritydeclaration
Low

Attachment G - Conflict of Interest Certification for 2026 Shima Bakery Remodel

PDF, Low priorityconflict-of-interest-certification
Low

Attachment K - Evidence of Insurance Certification for 2026 Shima Bakery Remodel

PDF, Low priorityevidence-of-insurance
Low

Attachment L - Statement of Safety Record

PDF, Low prioritysafety-record
Low

Attachment Z - Reference Documents for 2026 Shima Bakery Remodel

PDF, Low priorityreference-documents
Low

Authorization to Release Information for 2026 Shima Bakery Remodel Project

PDF, Low priorityauthorization-to-release-info
Low

Declaration of Sufficiency of Funds - Attachment D

PDF, Low prioritydeclaration-of-funds
Low

Escrow Agreement for Security Deposits - San Joaquin Delta CCD

PDF, Low prioritycontract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Procurement, Contracts & Auxiliary Services
Contacts1 person available
OfficeStockton, CA, 95207, USA
Office AddressStockton, CA, 95207, USA
Contacts
Kaleena SysayProcurement Specialist

Interested Companies (19)

ConstructConnectCincinnati, OH
Diede ConstructionLodi, CA
Cauvel & Dacey

See All 19 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The District is part of the statewide California Community College System, and currently serves over 23,000 students annually. The District is comprised of the Stockton Main Campus, the South Campus at Mountain House, and the Manteca Center. Additional information about the District is available online at https://www.deltacollege.edu/ . The District is governed by a Board of Trustees (the "Board"), consisting of seven voting members, elected from trustee areas in general elections throughout the District, and a Student Representative, appointed by Student Government. The Board exists under and derives its powers from the California Constitution and the acts of the State Legislature, and it derives its authority from the California Education Code.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS