This Solicitation opportunity from New Hampshire was posted on March 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Portsmouth, New Hampshire, Department of Public Works is soliciting sealed bids for the 2026 Sidewalk Repairs project (Solicitation 16-26-BID). The project involves repairing heaved, cracked, and disintegrated sidewalks at multiple locations within city limits to ensure they meet city standards and ADA regulations. The scope of work includes the removal of existing materials, subgrade work, sidewalk construction, restoration of existing conditions, and traffic control. Bidders must provide a total lump sum price for each specified location, though the city may identify additional repair sites throughout the summer construction season based on a provided unit cost table.
Responses must be submitted electronically via the eProcurement Portal by April 8, 2026. The contract is scheduled to begin on or after April 15, 2026, with a final completion deadline of July 30, 2026. Liquidated damages for delays are set at $100.00 per day. Award selection will be based on the lump sum pricing proposal. Required contractor submissions include a qualification questionnaire, bid bond, and certificates of insurance for general liability, automobile, and workers compensation. The contract includes a 12-month warranty period for materials and workmanship, with a 2% retainage withheld from payments until the warranty period expires.
PDF, High priority: read this firstpast-performance
HighAI Summary for 2026 Sidewalk Repair Bidder's Questionnaire: A required bidder's qualification questionnaire for the 2026 Sidewalk Repair project. The document collects detailed information on the bidder's entity, experience, current contracts, equipment, key personnel, and financial standing. It requires a notarized statement to verify the accuracy of the provided qualifications.
DOCX
DOCX, High priority: read this firstmodification
HighAI Summary for 2026 Sidewalk Repair Change Order Form: A blank change order template for the City of Portsmouth's 2026 Sidewalk Repair project. The document provides fields for recording changes in contract price and time, including original contract values, previous modifications, and the net increase or decrease resulting from the current change order.
PDF
PDF, High priority: read this firstsow
HighAI Summary for 2026 Sidewalk Repair General Requirements: This document outlines the General Requirements and Scope of Work for the 2026 Sidewalk Repair project. It defines the contractor's responsibilities regarding labor, materials, and equipment, specifies incidental work, establishes the order of precedence for contract documents, and details the authority of the City Engineer. It also includes mandates for property protection, restoration of landscapes, and the process for change orders and extra work.
PDF
PDF, High priority: read this firstifb
HighAI Summary for 2026 Sidewalk Repairs No. 16-26-BID: The City of Portsmouth, NH is soliciting sealed bids for 2026 Sidewalk Repairs (No. 16-26-BID) to address heaved, cracked, and non-ADA compliant sidewalks at multiple locations. Bidders must submit price proposals via the eProcurement Portal by April 8, 2026, at 2:00 pm. The project includes removal, subgrade work, construction, and restoration, with work scheduled between April 15 and July 30, 2026. The document includes submission schedules, general instructions, and references to technical specifications and bid bonds.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bid 16-26: 2026 Sidewalk Repair Bid Locations: This document details the specific bid locations and technical requirements for the City of Portsmouth Department of Public Works 2026 Sidewalk Repair project (Bid 16-26). It provides a breakdown of seven specific items/locations, including approximate square footage and detailed scopes of work for concrete and asphalt sidewalk replacement, ADA compliance requirements, and material specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Sidewalk Repair Specs 2026: Technical specifications document for sidewalk repair projects scheduled for 2026. The document outlines the required materials, construction standards, and technical requirements for the repair work.
PDF
PDF, Low prioritybid-bond
LowAI Summary for 2026 Sidewalk Repair Bid Bond: A legal bid bond template for the 2026 Sidewalk Repair project for the City of Portsmouth, NH. It outlines the obligations of the Principal and Surety to ensure the contract is executed if the bid is accepted.
PDF
PDF, Low prioritypresolicitation
LowAI Summary for 2026 Sidewalk Repair Bid Memo: Internal memorandum dated March 5, 2026, from Tyler Reese to Peter Rice regarding the 2026 sidewalk repair bid. The document outlines the intent to repair 15 priority locations and potentially more on a unit cost basis, with an estimated initial cost of $100,000.00 funded by the Citywide Sidewalk Improvements account.
DOCX
DOCX, Low priorityother
LowAI Summary for 2026 Sidewalk Repair Contractor's Affidavit: A legal affidavit form for the City of Portsmouth, New Hampshire, used by contractors to certify that all costs, claims, and indebtedness related to the 2026 Sidewalk Repairs project have been paid in full.
PDF
PDF, Low priorityother
LowAI Summary for 2026 Sidewalk Repair Funding Email: The document is a PDF portfolio wrapper containing no substantive content other than instructions to open the file in Adobe Acrobat.
DOCX
DOCX, Low prioritybond
LowAI Summary for 2026 Sidewalk Repair Performance Bond: A template for a Performance Bond for the 2026 Sidewalk Repairs project for the City of Portsmouth, New Hampshire. It outlines the obligations of the Principal and Surety to ensure the faithful performance of the contract and provides requirements for the surety company's authorization.
DOCX
DOCX, Low priorityaward
LowAI Summary for 2026 Sidewalk Repairs - Certificate of Final Completion: A template for the Certificate of Final Completion for the City of Portsmouth's 2026 Sidewalk Repairs project. The document serves as formal verification that the work has been inspected, the punch list is complete, and the contract is declared finally complete.
DOCX
DOCX, Low priorityaward
LowAI Summary for 2026 Sidewalk Repairs - Certificate of Substantial Completion: A template for a Certificate of Substantial Completion for the 2026 Sidewalk Repairs project for the City of Portsmouth, New Hampshire. The document serves to formally declare that the work is substantially complete, outlines the transition of responsibilities between the owner and contractor, and provides a framework for a punch list of remaining items.
DOCX
DOCX, Low prioritycontract-document
LowAI Summary for 2026 Sidewalk Repairs - Contractor's Final Release and Waiver of Lien: A legal release and waiver of lien form for the 2026 Sidewalk Repairs project for the City of Portsmouth, New Hampshire. This document serves as a final release where the contractor acknowledges receipt of final payment and waives all further claims or liens against the owner and project funds.
DOCX
DOCX, Low prioritypayment-bond
LowAI Summary for 2026 Sidewalk Repairs - Payment Bond: A template for a Payment Bond for the 2026 Sidewalk Repairs project for the City of Portsmouth, New Hampshire. The document outlines the obligations of the Principal and Surety to ensure payment to laborers and material providers.
DOCX
DOCX, Low priorityaward
LowAI Summary for Contract 16-26: 2026 Sidewalk Repair Notice of Intent to Award: A template Notice of Intent to Award for the 2026 Sidewalk Repair project (Contract No. 16-26). The document notifies the successful bidder of their selection, specifies the contract price, and outlines the conditions precedent for finalization, including the delivery of executed agreements and contract security bonds within ten days.
DOCX
DOCX, Low prioritynotice-to-proceed
LowAI Summary for Contract 16-26: 2026 Sidewalk Repair Notice of Intent to Proceed: A formal Notice of Intent to Proceed for the 2026 Sidewalk Repair project (Contract No. 16-26). The document establishes the commencement date for contract obligations, specifies the final completion date, and outlines prerequisites for starting work, including the submission of insurance certificates and excavation permits with traffic control plans.
The City of Portsmouth, NH is requesting sealed responses for Project Title . Responses are to be submitted electronically via the eProcurement Portal at https://procurement.opengov.com/portal/cityofportsmouth before Response Submission Time on Response Submission Date . Late responses will not be accepted. This project consists of Sidewalk improvements at multiple locations within the City limits. The following list of locations have sidewalks of various materials that are in disrepair. These sidewalks may be heaved, cracked, spalling, disintegrated and have broken or missing ADA tactile panels. The purpose of this project is to bring these areas of concern up to the City's standard for sidewalks and meet all ADA regulations while matching the construction type and material of the adjacent sidewalk network. This project will be bid as multiple individual locations in need of repair. Bidders are to express a total price for each location, including removal of existing conditions, subgrade work, sidewalk construction, restoration of existing conditions, traffic control, mobilization and any additional scope necessary to complete the location. Bidders are encouraged to visit each location listed in this bid to determine the extent of work necessary; any areas/quantities listed in this bid are approximate and may not accurately reflect work necessary. This project shall be awarded based upon pricing for the lump sum section of the pricing proposal. Should any quantities be more than 10% greater than the City's estimate, shown in the attached document, the City shall compensate the difference based on the unit cost table. Traffic control plans will be required for each location at the engineer's discretion. The schedule of values in the bid tab shall be utilized should the City determine additional locations that sidewalk repairs are necessary during the duration of this contract. It is possible that the City shall identify additional locations for repair throughout the summer construction season. Work may begin on or after: April 15, 2026. All sections of the work shall be completed by July 30th, 2026. Liquidated damages shall be assessed at $100.00 per day.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award