Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from City of Palm Springs was posted on July 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Slurry Seal

Closed
BID 26-02State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 4 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 10 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
ACADEMY OF RICHMOND COUNTY PARKING LOT PAVEMENT REPAIR and STRIPING
Solicitation # 26-214
The Richmond County Board of Education has issued RFP 26-214 for turnkey pavement repair and striping services at the Academy of Richmond County, located at 910 Russel St., Augusta, Georgia. The scope of work includes patching designated areas to match existing pavement, installing curb and gutter to enclose grease trap access manholes, and performing line striping. Specific technical requirements include the use of 3,000 FSI concrete with a fine broom finish, 98% compacted subgrade, and MPI #32 alkyd traffic-marking paint. All new striping and hatching must be yellow, while stop bars and existing crosswalks must be recoated in white, adhering to Georgia DOT Construction Standards. Asphalt top courses must cure for at least 14 days before painting. The contract will be awarded to the lowest responsible and responsive bidder, with an anticipated award date of October 20, 2026. Sealed bids are due by 3:00 PM on October 7, 2026, and must include turnkey pricing, a project lead time, company references, and a signed Sex Offender Acknowledgement Form. Contractors must maintain commercial general liability insurance of 2 million dollars and worker's compensation insurance of 1 million dollars. Compliance with Georgia state laws is mandatory, including E-Verify affidavits, periodic criminal history record inquiries under O.C.G.A. 35-3-34, and adherence to a smoke-free environment on school property. All work coordination and deliveries must be cleared through David Perry.
Richmond County Board of Education

POSTED

about 16 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The contract involves comprehensive pavement maintenance and restoration work across various streets in the City of Palm Springs, including the application of weed killer to all pavement cracks or joints, cleaning and routing of cracks 1/8 inch or wider followed by sealant or asphalt installation, and the construction of approximately 1,459 tons of Rubber Polymer Modified Slurry over 1,945,098 square feet of asphalt surface. Additionally, all existing traffic striping and markings must be removed and replaced, along with all related appurtenant tasks. The work must be completed within 40 working days from the start of the contract and all submissions are required to be made electronically, with no physical delivery to City Hall. The bid will be opened entirely online, and the City Council is scheduled to award the contract on August 26, 2026, after which successful bidders have seven working days to submit all required documentation. The contract is governed by the City’s Community Workforce Agreement, which mandates adherence to Project Labor Agreement requirements only if the award exceeds one million dollars; if the contract value is below that threshold, those requirements do not apply.

General Info

Pavement restoration with slurry sealing, crack treatment, striping replacement, 40-day timeline, electronic submissions, award August 26, 2026.

Agency

Engineering Department of City of Palm SpringsView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

3200 E. Tahquitz Canyon Way, Palm Springs, CA, 92262, USA

Set-Aside

NONE

Documents

(6)

2026 Slurry Seal City Project No. 26-02 Construction Agreement

PDFcontract-document

2026 Slurry Seal City Project No. 26-02 - Required Bid Documents

PDFrequired-bid-documents

2026 Slurry Seal City Project No. 26-02 - Special Provisions

PDFspecial-provisions

2026 Slurry Seal City Project No. 26-02 - Notice Inviting Bids and Instructions to Bidders

PDFifb

City of Palm Springs 2026 Slurry Seal Street List and Maps

PDFspecifications

City of Palm Springs 2026 Slurry Seal Appendices and Standards

PDFappendices-standards

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyEngineering Department of City of Palm Springs
Contacts1 person available
OfficePalm Springs, CA, 92262, USA
Organization / Agency
Engineering Department of City of Palm Springs
View Agency Profile
Office AddressPalm Springs, CA, 92262, USA
Contacts

Interested Companies (34)

Show more
Interstate Striping
San Bernardino, CA
RMA
Rancho Cucamonga, CA

See All 34 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Work comprises application of weed killer to all pavement cracks or joints; cleaning, routing, and installation of crack-sealant or asphalt pavement in all pavement cracks or joints 1/8” or wider; construction of approximately 1,459 Tons of Rubber Polymer Modified Slurry (RPMS) over 1,945,098 square feet of asphalt surface; removal and replacement of existing traffic striping and markings; and all appurtenant work on various streets throughout the City of Palm Springs. The work shall be diligently prosecuted to completion before the expiration of 40 working days.
All Items to be submitted electronically. There is nothing to bring to City Hall by the deadline. Bid Opening is done 100% electronically. Contract will go to City Council for Award on August 26, 2026. Submittals due within 7 working days of contract approval.
Pursuant to the City’s Community Workforce Agreement, the requirements of the PLA shall apply only to construction contracts with an awarded contract amount of One Million Dollars ($1,000,000) or greater. In the event the Contract is awarded for less than One Million Dollars ($1,000,000), the PLA requirements set forth shall not apply.

More opportunities from Engineering Department of City of Palm Springs

Same awarding agency

NAICS: 237310
SLED
Ramon Road Bridge Widening Project
Solicitation # 08-25
The Ramon Road Bridge Widening Project, identified as City Project No. 08-25 and Federal Aid Project No. BHLS-5282(040), involves widening Ramon Road from San Luis Rey Drive to Candlewood Drive across the cities of Palm Springs and Cathedral City. The scope of work includes the installation of new pavement, curbs, gutters, sidewalks, and retaining walls, as well as the widening of the Ramon Road Bridge over the Whitewater River, improvements to the Whitewater Channel, landscaping, and the installation of traffic signals. The project will be executed in multiple stages according to specific traffic control and phasing plans, and will require a CV-Link detour during construction. The total work must be completed within 442 working days from the Notice to Proceed. Funding is split between Federal HBP funds, covering work from Street Station 33+14 to the east end of the Landau Boulevard intersection including bridge and channel improvements, and Non-Participating funds for all other areas. The contract is estimated at 55 million dollars, with the award based on the lowest overall cost to the City via Bid Schedule A. Bidders must submit all documents electronically through PlanetBids by the September 29, 2026 deadline. Compliance requirements include the 2024 Greenbook and 2025 Caltrans Standard Specifications, Buy America mandates, Davis-Bacon prevailing wage rates, and ADA accessibility standards. Required security includes performance, payment, warranty, and bid bonds.
Highway, Street, and Bridge Construction

POSTED

11 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS