Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Street Surface Seal Project

Closed
ST2505State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 22 days
NAICS: 237310
New
SLED
27-020 Windsor Parkway Sidewalk Project
Solicitation # 27-020
The Windsor Parkway Sidewalk Project (S2161) is a construction contract for the City of Sandy Springs, Georgia, focused on installing approximately 2,940 linear feet of 6-foot wide sidewalk with a 2-foot landscape strip and curb and gutter on the south side of Windsor Parkway, from Dalmer Road to 727 Windsor Parkway. The scope of work includes significant drainage upgrades, such as 1,739 linear feet of 18-inch RCP, 16 new catch basins, one reconstructed catch basin, one new drop inlet, one manhole, the extension of an existing culvert, and two parapet walls. All work must adhere to the current Georgia Department of Transportation (GDOT) Standard Specifications, the Americans with Disabilities Act (ADA), and the Manual on Uniform Traffic Control Devices (MUTCD), with materials sourced exclusively from GDOT certified suppliers. The project must commence within ten calendar days of the Notice to Proceed and be completed within 365 calendar days. The contractor is required to provide separate performance and payment bonds, each for 100% of the total contract price, and must comply with the Georgia Security and Immigration Compliance Act of 2006 and the Drug-Free Workplace Act. Payment will be made via progress payments based on the Bid Schedule, with invoices processed by the 5th day of each month. This solicitation is open to all qualified bidders as no specific set-aside status is designated.
City of Sandy Springs

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
International
Transportation and Economic Corridors - Request for Qualification - RFQ #2026-14: BF 71315, Construction of Steel Girder Bridge over Athabasca River, Removal of Existing Bridge, Grading, GBC, ACP & Other Work
Solicitation # RFQ 2026-14
Alberta Transportation and Economic Corridors is soliciting construction services for the replacement of the BF 71315 bridge on Highway 33:08 over the Athabasca River near Fort Assiniboine, Alberta. The project utilizes a Design-Bid-Build delivery method and involves the construction of a new two-span steel girder bridge with a wildlife jump span, the demolition and disposal of an existing four-span truss bridge, and associated works including river training, grading with approximately 200,000 cubic meters of imported borrow fill, and traffic management. Performance is expected to commence in May or June 2027 and conclude by September 30, 2030. This is a qualification-based selection process where firms must achieve a minimum score of 65 percent across evaluation categories—including corporate profile, team qualifications, project experience, comprehension, schedule, and competitive advantage—to be short-listed for the subsequent Tender process. The pre-qualification list will remain valid for up to three years. Applicants must provide a valid Certificate of Recognition (COR) or a COR Equivalency Letter (COREL), as SECOR and TLC certifications are not acceptable. The project requires a performance bond for 50 percent and a labour and material payment bond for 50 percent of the tender price. Submissions must be delivered in English via the APC E-submissions platform in PDF format by December 17, 2026.
Transportation and Economic Corridors

POSTED

about 10 hours ago

DEADLINE

in 24 days
NAICS: 237310
New
SLED
Sidewalk Repair And Replacement Improvements
Solicitation # 20261120007
The City of Perris is soliciting proposals for sidewalk repair and replacement improvements across twenty-two locations. The scope of work includes the removal and replacement of concrete sidewalks, curb and gutter, and driveway approaches, as well as asphalt pavement repairs, steel plate repairs, and concrete sidewalk grinding to eliminate uneven joints. The contractor is responsible for all labor, materials, equipment, mobilization, traffic control, demolition, and disposal. All work must adhere to City of Perris Standard Plans and Specifications, accessibility requirements, and prevailing wage regulations pursuant to the California Labor Code. The City intends to award a single contract for all locations, with proposals evaluated on a 100-point weighted scale covering qualifications and experience, project scope understanding, cost, methodology, schedule, and references. Contractors must be registered and qualified with the California Department of Industrial Relations. Performance is restricted to weekdays from 7:00 AM to 4:00 PM, and the selected contractor must provide a minimum 90-day warranty on materials and workmanship. Proposals must be submitted via email to William Carrasco by 5:00 PM Pacific Time on December 4, 2026, and must include an itemized cost proposal for each location and a grand total for the project. There is no specified set-aside status for this solicitation.
City of Perris

POSTED

about 11 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The contract pertains to the 2026 Street Surface Seal Project in South San Francisco, California, involving extensive road maintenance and improvement activities within the Winston Manor and Serra Highlands neighborhoods. The work includes mobilization and demobilization of construction equipment, public posting and notification, traffic regulation, installation of construction area signs, and the use of changeable message signs. Key construction activities cover clearing, grubbing, environmental protection measures, removal and replacement of signs and posts, hot mix asphalt base repairs, potential over-excavation, striping and marker removal, crack sealing, polymer-modified slurry sealing, sweeping, and the installation of traffic delineator curbs, traffic video detection systems, striping, markings, and markers. The engineer’s estimate for the base bid is approximately $3.23 million, with an alternate bid estimate of $233,000. Award of the contract will be based solely on the total base bid price. The solicitation was issued by the Public Works/Engineering Division of South San Francisco, with a response deadline of April 8, 2026. The project is managed by Senior Engineer Jeffrey Chou, who serves as the primary contact for any inquiries regarding the contract. Detailed bid documents outline the complete scope of work, and the project aims to enhance road surface conditions and traffic management in the specified neighborhoods.

General Info

2026 South San Francisco road maintenance project, $3.23M base bid, includes sealing, signage, and traffic control.

Documents

7
PDF, High priority: read this first32 pages · ifb
High
PDF, High priority: read this first24 pages · ifb
High
PDF, High priority: read this first14 pages · contract-document
High
PDF, High priority: read this first6 pages · ifb
High
PDF, High priority: read this first73 pages · general-conditions
High
PDF, High priority: read this first16 pages · special-conditions
High
PDF, High priority: read this first61 pages · technical-specifications
High

Read all 7 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 3 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works/Engineering Division
Contacts1 person available
OfficeSouth San Francisco, CA, 94080, USA

Interested Companies (7)

BidAmericaSheridan, WY
Doolittle ConstructionSnoqualmie, WA
O'Grady PavingMountain View, CA

See All 7 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
General work description: The work consists of mobilization and demobilization of construction equipment; public posting and notification; traffic regulation and construction area signs; changeable message signs; clearing, grubbing, and environmental protection; remove and replace signs and posts; HMA base repairs; over-excavation (if required), remove striping and markers, crack sealing; polymer modified type II slurry seal; sweeping; and installation of traffic delineator curb, traffic video detection equipment, striping, markings, and markers, located at various streets within the Winston Manor and Serra Highlands Neighborhood in northeastern South San Francisco, CA. A detailed scope of work is included in the bid documents. The engineer's estimate for the Base Bid in this work is $3.23M and the engineer's estimate for the Alternate Bid is $233K. Detailed scope of work is included in the bid documents. Award will be based on the Total Base Bid Price .

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS