This Solicitation opportunity from Washington was posted on February 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2026 Waster Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The solicitation WT-2024-02 issued by the City of Washougal Public Works Department entails the construction of approximately 3,800 linear feet of ductile iron water main, installation of 66 water service connections, 9 fire hydrant assemblies, connections to the existing water system, and associated surface restorations. The project work is to be performed within Washington state, specifically in Washougal, following detailed 2026 Water Improvement Plans that include engineering drawings, schedules, erosion control notes, and construction specifications. The contract mandates compliance with local and state standards, including the 2024 Standard Specifications for Road, Bridge, and Municipal Construction (WSDOT and APWA), City of Washougal engineering standards, and MUTCD for traffic control. Key performance timelines require commencement within 10 days of Notice to Proceed and final completion within 180 calendar days. The procurement method is a Lowest Price Technically Acceptable award basis, where bidders must satisfy pass/fail responsibility criteria covering ability to perform, compliance with laws, integrity, past performance, and participation in E-Verify, among others. The contract documents emphasize the importance of technical compliance and contractor qualifications but do not assign weighted scoring factors. Payment administration is handled by the City of Washougal with no specified electronic invoicing platform. The contract includes provisions for insurance requirements with minimum rating and tail coverage, waiver of industrial insurance immunity, and termination for convenience by the City. There is no indicated package marking or MIL-STD compliance, as specifications are restricted to civilian/public works standards such as AWWA pipe and fitting standards. The bid schedule lists numerous items necessary for installation and restoration, but many pricing fields are left unfilled; the engineer’s estimate is approximately $1.5 million. Bidders must submit proposals by March 24, 2026, through the City's e-procurement portal or physical delivery, including mandated certifications, bid bonds, and subcontractor disclosures where applicable. Inspections and final acceptance are contractor-driven but overseen and approved by the City-designated Engineer at the project site, following detailed quality and material standards.
General Info
Place of Performance
Set-Aside
Documents
2AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 12 days
- Lift Station No. 85 ReplacementOpen now, due in 23 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Interested Companies (19)
See All 19 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
More opportunities from Washington → Public Works
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
