Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on January 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Water Treatment Chemical Procurement

Awarded
2025-04AState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. These improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and MWBE compliance. Bidders must provide a signed bid form, bid security, and evidence of authority to sign. The project is governed by EJCDC standard forms and requires adherence to various technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Contract administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via applications for payment and becomes due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 4 days
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must adhere to VDOT 2020 Road and Bridge Specifications, the City of Winchester Standards Manual, and current ADA requirements for sidewalks and ramps. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, and must be submitted exclusively through the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for bidders include registration in the Commonwealth of Virginia, a minimum of three similar project references, and confirmation of non-debarment status. The project is subject to the Davis-Bacon Act, requiring specific payroll certifications and adherence to Department of Labor wage determinations for Frederick County. Compliance with various Executive Orders regarding non-discrimination and the utilization of MBE/WBE firms is mandatory. The successful bidder must provide performance and payment bonds equal to 100 percent of the contract amount and file necessary insurance within 15 days of the award. Payment terms are generally 30 days after invoice or delivery.
WG Construction Co., Inc.

POSTED

about 1 hour ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Tri County Joint Municipal Authority is seeking sealed electronic bids for the construction of the Malden Water Tank Replacement project under Contract Nos. 2025-03A for General/Mechanical Construction and 2025-03B for Electrical Construction, with bids due by August 6, 2026, at 2:00 p.m. local time via the PennBid platform. The project encompasses the full scope of labor, materials, plant, utilities, and services required to construct public drinking water facilities, including piping, valves, hydrants, thrust blocks, metering systems, and associated electrical components such as motors, control systems, grounding, and SCADA integration. Performance is expected to span 660 calendar days and is bound to commence upon issuance of the Notice to Proceed, with contractors required to submit preliminary schedules within ten days of the effective date. All work must adhere to the National Electrical Code, applicable state and local codes, manufacturer specifications, and industry standards including NACE, SSPC, ASTM, ANSI, OSHA, and NFPA, while all steel products utilized must originate in the United States. Bidders must comply with prevailing wage requirements under the Department of Labor and Industry, adhere to the Public Works Employment Verification Act (Act 127 of 2012), and refrain from any form of discrimination based on race, age, color, religion, sex, national origin, or handicap. The contract is awarded on a Lowest Price Technically Acceptable basis, where responsiveness and responsibility are foundational prerequisites. Bidders must submit comprehensive documentation through PennBid including a signed bid form, bid security, three sets of bound O&M manuals, proof of diverse business certifications if claimed, evidence of legal establishment and good standing, a schedule of key personnel and equipment, a proposed work plan, and financial capability statements. Insurance requirements mandate that subcontractors carry worker’s compensation and general liability coverage naming the Owner and Engineer as additional insureds, and all bonds must be issued by sureties listed in the U.S. Department of Treasury Circular 570. Special provisions prohibit night work except under emergency conditions or written authorization, impose full weather risk on the contractor, require permanent engraved labeling on all equipment using specific materials and font standards, and prohibit hand-lettered cable identification. All bids remain irrevocable for 90 days following the due date unless delayed by external approvals such as bond sales or grant awards, and the Authority reserves the right to reject any or all bids

General Info

Tri County JMA seeks sealed bids for Malden Water Tank replacement, due August 6, 2026, via PennBid, 660-day schedule, LPTA award.

Contract Value

$16,368

Place of Performance

Washington County, PA, USA

Set-Aside

NONE

Award Issued Date

Documents

14
PDF, High priority: read this firstbid-pricing-summary
High
PDF, High priority: read this firstaward
High
PDF, High priority: read this firstaward
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstpricing-section
High
PDF, High priority: read this firstrfq
High
PDF
PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseAwarded
Posted

Solicitation

Notice updated

Response deadline changed from Nov 4, 2025 to Nov 6, 2025. The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Nov 6, 2025 to Feb 12, 2026. The notice title changed. The notice description changed.

Notice updated

Solicitation number changed from Tri-County Joint Municipal Authority, Washington County to 219100. The notice description changed.

Notice updated

Response deadline changed from Feb 12, 2026 to Sep 2, 2026. The notice title changed. Solicitation number changed from 219100 to Tri-County Joint Municipal Authority, Washington County. The notice description changed.

Notice updated

Response deadline changed from Sep 2, 2026 to Aug 6, 2026. The notice description changed.

Notice updated

Response deadline changed from Aug 6, 2026 to Oct 1, 2026. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Washington County
ContactsNo contacts available
OfficeWashington County, PA, USA
Office AddressWashington County, PA, USA
ContactsNo contact information available

Interested Companies (259)

Brex Enterprises
A. Folino ConstructionOakmont, PA
Wright Asphalt and Concrete

See All 259 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Ref. #: Tri-County Joint Municipal Authority, Washington County
Public notice is hereby given that the Tri County Joint Municipal Authority will receive price quotations until 3:00 PM, prevailing time, on Thursday, February 12, 2026, for the furnishing of the following materials: Calcium Hypochlorite Tablets Carus 4200 DR 400 Orthophosphate Caustic Soda Gaseous Chlorine DelPac 2020 Potassium Permanganate Liquid Sodium Hypochlorite Powdered Activated Carbon EarthTec QZ
Copies of the specifications are on file at the office of the Authority, 26 Monongahela Avenue, Fredericktown, PA 15333. All specifications are available online at no cost at www.pennbid.bonfire.net. Bids must be submitted via PennBid.
All quotations must be for the period from award through January 31, 2027, during which time all materials must be supplied at the quoted price.
The Tri County Joint Municipal Authority reserves the right to reject any or all quotations, to waive any informality in the quotation process and, to accept any quotation which it deems to be in its best interest.
TRI COUNTY JOINT MUNICIPAL AUTHORITY
Fred Roberts, Board Chairman Jeff Tarley, Operations Manager

More opportunities from Pennsylvania → Washington County

Same awarding agency

NAICS: 237120
SLED
Rebid of WCTA Fuel System Installation - WCTA PA 2026-1.1GC – General Construction
Solicitation # WCTA PA 2026-1.1GC
The Washington County Transportation Authority, doing business as Freedom Transit, is soliciting bids for Contract WCTA PA 2026-1.1GC for the general construction and installation of a new fuel system at the WCTA Operations Facility located at 375 Berry Road in South Strabane Township, Pennsylvania. This re-bid project requires the general contractor to coordinate with other on-site prime contractors responsible for the concrete pad, bollards, excavation, and electrical power sources. Key deliverables include the completed fuel system installation and the provision of comprehensive operation and maintenance data, including emergency shutdown procedures. All bids must be submitted electronically via the PennBid Program by 2:00 PM EST on November 18, 2026. The contract is subject to strict federal and state regulations, including the Davis-Bacon Act requiring Federal Prevailing Wage Rates and compliance with FTA Buy America requirements. Bidders are strongly encouraged to utilize certified Disadvantaged Business Enterprises (DBE), and the award will be granted to the apparent low responsive and responsible bidder. Required security includes a bid guarantee of five percent of the bid price, with the successful contractor providing performance and payment bonds for 100 percent of the contract price. Administration of the project is managed through a Construction Manager and Architect, with payments processed via AIA Documents G702/CMa and G703. The project also mandates adherence to EEO, ADA, and non-discrimination laws.
Oil and Gas Pipeline and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS