This Solicitation opportunity from Georgia was posted on October 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2026035-BID3313 LRA 2026
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Columbia County, Georgia, is soliciting bids for the LRA 2026 project, solicitation number 2026035-BID3313, which involves providing all materials, equipment, and labor for construction, specifically including Full Depth Reclamation (FDR). This is a unit-price contract rather than a lump sum agreement, meaning payment is based on actual quantities utilized. Bids must be submitted electronically via the Bonfire portal by November 5, 2026, at 12:00 PM EST. The contract will be awarded to the lowest responsible bidder based on the estimated total price. Bidders are required to provide a bid bond for at least 10 percent of the total bid amount and submit a non-collusion affidavit. The project mandates strict adherence to GDOT standards, requiring that all concrete and asphalt be sourced from GDOT-certified plants and that all soil and asphalt testing be conducted by GDOT-certified laboratories. Contractors must maintain a Level 1A GSWCC certified person on-site at all times and provide proof of Level IA or greater NPDES certification before contract execution. Insurance requirements include statutory Worker's Compensation, public liability and property damage up to 2 million dollars per occurrence, automobile liability, and 1 million dollars in both professional and cyber liability coverage. Contract administration is overseen by the County Engineer, who is responsible for final inspections and approving changes in work. Payment terms allow for partial payments of 90 percent of the value of labor and materials, not to exceed 33 percent of the bid amount, with requests submitted by the fifth day of each month. Additional requirements include compliance with MUTCD and GDOT traffic control standards, coordination with the United States Postal Service, and adherence to Georgia 811 Call Before You Dig guidelines. All work must also comply with 24 CFR 5-1220 regarding on-site construction cleanup.
General Info
Place of Performance
GA, USASet-Aside
Documents
5AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownAsk CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
