This Solicitation opportunity from Connecticut was posted on August 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2027-002 RFP for PSB UPS
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Town of East Lyme is seeking qualified manufacturer-authorized UPS integrators and licensed electrical contractors to deliver a complete turnkey replacement of its failed 40 kVA, 480 VAC three-phase Uninterruptible Power Supply system serving the Public Safety Building Server Room and Remote Dispatch Center. The project requires the design, furnishing, installation, testing, and commissioning of a modern, redundant, enterprise-class UPS system with true online double-conversion technology, 95% minimum efficiency in online mode, and Tier III maintainability architecture to ensure continuous operation during maintenance. The system must output 120/208 VAC three-phase, support a minimum 30-minute runtime at full load using VRLA or Lithium-Ion batteries, and include a step-down transformer, maintenance bypass, and two intelligent rack-mounted PDUs per rack. All receptacles in the server room must be permanently labeled, and existing UPS output distribution panel labeling must be updated. Proposers must be licensed to perform electrical work in Connecticut and hold current factory authorization from the proposed UPS manufacturer, alongside demonstrated experience installing at least five comparable mission-critical UPS systems within the past five years, with references from municipal, healthcare, emergency services, or enterprise data center projects. Proposals must include a comprehensive preliminary technical design package with one-line diagrams, equipment layouts, load analysis, sequence of operation, and an acceptance testing plan featuring functional, transfer, battery, load bank (minimum 75%, preferred 100%), maintenance bypass, static bypass, alarm, and network monitoring verification. A detailed project schedule and outage/cutover plan are mandatory, and shortlisted proposers may be required to attend a technical design review meeting to present system architecture, redundancy strategy, battery runtime calculations, monitoring capabilities, commissioning procedures, and future expansion plans. All construction drawings must be prepared and stamped by a Connecticut-licensed Professional Engineer. Vendor submissions must include itemized and alternate pricing for extended runtime options (45 and 60 minutes), five- and seven-year 24/7 preventive maintenance agreements, and four-hour on-site emergency response. Required certifications include an Equal Opportunity Affirmative Action Affidavit (for companies with 10+ employees), a Non-Collusive Affidavit certifying independent bid development, and a Tax Affidavit confirming no delinquent taxes and age of at least 18. Proposals, due by 10:00 AM on August 17, 20
General Info
Place of Performance
CT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Connecticut → DAS Procurement
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
