Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2027-1015 Central Kitchen Upgrades

Closed
2027-1015State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262 and associated buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems and lighting controls. The project also requires the installation of new signage and the correction of plumbing deficiencies. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, with price, past performance, and corporate relevant experience weighted with equal importance. Offerors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict material handling and labeling standards, particularly for wood products and electrical wiring. Compliance with the Americans with Disabilities Act, Buy American requirements, and prevailing wage rates for Glynn, Brantley, and McIntosh counties is mandatory. Proposals must be submitted electronically in separate price and technical volumes to the Contracting Officer by the specified deadline.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 11 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, including paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. The award will be based on the lowest price, with evaluation factors including compliance with the Buy American Act. Bidders must provide pricing for two specific exhibit line items: building renovation and paving removal and replacement. Bonding requirements are tiered, with proposals of 150,000 dollars or more requiring bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and requires adherence to ADA accessibility guidelines and specific cybersecurity standards for facility-related control systems. Quality assurance is managed through a multi-stage inspection process involving punch-out, pre-final, and final acceptance inspections. Monthly invoicing must be submitted via Wide Area Work Flow with required NAVFAC certifications and supporting documentation.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 25 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 29, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Efforts (GFE) to secure project financing. Bidders must comply with six specific GFEs, with several mandatory requirements for a bid to be deemed responsive. Specifically, proof of online solicitation postings for 30 consecutive calendar days and a print newspaper posting for at least one day, as well as proof of utilizing the Small Business Administration and Minority Business Development Agency, must be included in the bid package. Documentation for outreach efforts may be submitted up to three business days after the bid closing date. Failure to meet these specific GFE requirements will result in the bid being deemed non-responsive.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site work is required, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utilities. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Interested parties should contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected before the November 30, 2026, deadline.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA, OSHA, and EPA regulations, with Massachusetts state regulations prevailing if they are more stringent than federal requirements. The contract is a small business set-aside and requires a single lump sum bid with a detailed cost breakdown for labor, materials, and equipment. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a Massachusetts contractor's license, a W9, a completed vendor questionnaire, a wage rate certification, and a minimum 90-day bid guarantee. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 18 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, along with the temporary disconnection and re-installation of HVAC equipment, furnaces, and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, and must provide a minimum one-year workmanship warranty upon final acceptance by CSD. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. Additionally, the selected contractor must provide payment and performance bonding for the full project value within ten days of award and maintain general liability insurance of at least one million dollars per occurrence. Pricing submitted in proposals must remain firm for 60 calendar days.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The McAllen Independent School District is soliciting competitive sealed proposals for the 2027-1015 Central Kitchen Upgrades project, which involves comprehensive renovations to a school cafeteria kitchen, including the procurement and installation of specialized food service equipment such as a Hobart FT1000e+Base Dishwasher, an Irinox MF 350.2 2T Plus chiller/shock freezer with ramp, and a 100A, 3-pole, NEMA 4X non-fused disconnect switch, along with associated electrical and building modifications. The project is funded partially by the U.S. Department of Agriculture and Texas Department of Agriculture, subject to federal compliance requirements including 2 CFR Part 200, the Davis-Bacon Act, and Buy America provisions requiring all iron, steel, manufactured products, and construction materials to be produced in the United States. Contractors must adhere to all federal and state equal employment opportunity and nondiscrimination laws, comply with prevailing wage standards, and submit complete proposals in both electronic format via Ionwave and as a sealed hard copy mailed to the District’s designated address by the deadline of August 21, 2026. Emailed or faxed submissions will be rejected. The evaluation process is based on a weighted best-value model, with price accounting for 600 points out of a total 1,000, followed by offeror experience and reputation (190 points), safety record (70 points), proposed personnel (60 points), quality of goods or services (40 points), financial capability (20 points), and other relevant factors (20 points). Bidders must submit mandatory attachments including an IRS W-9 form, a completed Form 1295, a surety letter, financial statements, OSHA Form 300 logs, drug/alcohol prevention policies, and a safety program manual, along with proof of HUB certification if applicable. All contractors must provide payment and performance bonds equal to 100% of the contract amount, issued by a Texas-authorized surety, and maintain required insurance coverages including $1 million per occurrence general liability, $500,000 employer’s liability, and owner’s protective liability. Substantial completion is required within 180 calendar days of notice to proceed. The contract prohibits any ex parte communication with district employees or board members and enforces strict compliance with Texas and federal laws regarding anti-boycott provisions,

General Info

McAllen ISD seeks Central Kitchen Upgrades bids via IonWave by August 21, 2026, with federal and state compliance required.

Agency

Texas → MCALLEN ISD

Place of Performance

TX, USA

Set-Aside

NONE

Documents

5

2027-1015 Central Kitchen Upgrades Competitive Sealed Proposal

PDF, High priority: read this first47 pages · rfp
High

CSP 2027-1015 Central Kitchen Upgrades General Terms and Conditions

PDF, High priority: read this first7 pages · general-terms-and-conditions
High

Exhibit A Evaluation Matrix CSP 2027-1015 Central Kitchen Upgrades

PDF, High priority: read this first1 page · evaluation-matrix
High

General Decision Number TX20260255 - Prevailing Wages (Hidalgo County, TX)

PDF, High priority: read this firstwage-determination
High

Reference Form for Contractor Performance Evaluation

PDF, Low priority1 page · reference-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → MCALLEN ISD
Contacts3 people available
OfficeMCALLEN, TX, 78501, USA
Organization / Agency
Texas → MCALLEN ISD
Office AddressMCALLEN, TX, 78501, USA
Contacts
Laura WilliamsPurchasing Services Director
Lorena GarciaDeputy Superintendent of Business Operations

Full Description

Show more
McAllen Independent School District (the “District”) invites your proposal on the referenced project.Interested respondents may obtain specifications and submit their proposals electronically through IonWave. Contractors submitting a response shall not discuss this CSP with employees of District or members of the Board of Trustees of the District. Failure to abide by this requirement may result in disqualification. ***** This project is being funded, in part, by Federal U.S. Department of Agriculture/Texas Department of Agriculture (USDA/TDA) and is subject to the following Federal requirements: 2 CFR Part 200; USDA/TDA procurement regulations; the Davis-Bacon and Related Acts as well as State laws and regulations. In addition, the successful bidder must comply with all applicable federal and state equal employment opportunity and nondiscrimination laws and regulations.Any questions regarding this solicitation must be submitted through the “Questions” option located on the Ionwave website, no later than the date and time specified on the solicitation. Questions/clarifications regarding this solicitation will not be answered by phone or email.*Do not contact the Architect/Engineer or Project Manager. Questions/clarifications will not be answered by phone nor by email. As a prerequisite to a Contractor’s qualifying for the award of contract on this project, the Contractor shall complete all “Line Items," provide all “Response Attachments” on Ionwave (no later than the proposal’s deadline). The District prefers that proposals be submitted via Ionwave; however, final proposals shall be submitted in hard copy format in a sealed envelope (see printing instructions located on Attachments tab “Exhibit B – How to Print a Supplier Response”). Emailed and faxed responses will not be accepted. Follow instructions listed.Submit Hardcopies in a Sealed Envelope to:Company NameProject Number and NameMcAllen Independent School DistrictAttn: Laura Williams2000 N. 23rdMcAllen, TX 78501

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS