Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

21-003 Janine Drive and Vicinity Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 21-003 Janine Drive and Vicinity Rehabilitation Project is a public works initiative managed by the City of Whittier Public Works Department in Los Angeles County, California. The scope of work involves the removal and replacement of existing asphalt pavement, concrete access ramps, and cross gutters, as well as the re-establishment of detection loops and re-striping. The project is focused on two primary areas: Janine Drive between Santa Gertrudes Avenue and Solejar Drive, and the neighborhood north of Janine Drive extending to West Road. The project is classified under NAICS code 237310 and is located entirely within the City's Right-of-Way. It has been granted a Class 1 categorical exemption under the California Environmental Quality Act (CEQA) Guidelines, Section 15301(c), as the work consists of minor alterations with no significant environmental impact. Assessments have confirmed that the project site does not impact historical resources, scenic highways, or habitats for endangered, rare, or threatened species, and there are no active clean-up site assessments listed on Geotracker for the area. Ronald Henry, Civil Engineering Assistant, serves as the primary point of contact for the project.

General Info

City of Whittier to rehabilitate pavement and ramps on Janine Drive with no environmental or historical impact.

Agency

California → City of Whittier

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Whittier, CA

Set-Aside

NONE

Documents

(2)

21-003 Janine Drive and Vicinity Rehabilitation Project Notice of Exemption

PDFnotice-of-exemption

PROJECT LOCATION MAP

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Whittier
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Whittier
Office AddressN/A
Contacts
Ronald HenryCivil Engineering Assistant

Full Description

Show more
This work includes removing and replacing existing asphalt pavement, concrete access ramps, cross gutter, re-establishing detection loops, and re-striping of Janine Drive between Santa Gertrudes Avenue and Solejar Drive and the neighborhood north of Janie Drive to West Road. he disturbed proiect site has no value as habitat for endangered, rare, or threatened species. Janine Drive and the nighboorhood north of Janine Drive are not designated as a scenic highway. The proiect site is not listed on Geotracker as having an active clean-up site assessment pursuant to lists identified under Section 65962.5 of the Government Code. The proiect site does not impact historical resources.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS