(23-307) SG1 and MVVFD WTP Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves comprehensive electrical and infrastructure upgrades at the Burnsville Water Treatment Plant, including the supply and installation of medium-voltage switchgear, variable frequency drives, and a primary unit substation to replace existing equipment. The scope encompasses demolition, electrical wiring, conduit installation, and the integration of new fiber networking equipment, network cabinets, patch panels, and fiber optic cables. Additional work includes constructing temporary pathways for electrical gear movement, upgrading security access systems with new hardware components, and updating the ArcFlash study for all electrical components within the plant. The project requires coordination with owner-provided equipment and adherence to specified safety and technical standards. Bidders must participate in a mandatory pre-bid conference, obtain contract documents via QuestCDN or the City’s website, and submit electronic bids through QuestCDN, accompanied by a bid bond equal to 5% of the bid amount. The City reserves the right to reject bids, and all bids are binding for 60 days. The successful contractor will need to provide performance and payment bonds and comply with Minnesota licensing and employment requirements. The project is scheduled for bid opening by August 23, 2024, with award considerations by the City Council on September 3, 2024. All questions should be directed to the project contact at Black & Veatch.
General Info
Agency
Place of Performance
MN, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Early Work package shall include the preparation of submittals as required to order Medium-Voltage Vacuum Interrupter Switchgear Equipment, Medium-Voltage Variable Frequency Drive Equipment, and Primary Unit Substation Equipment. Furnishing of Medium-voltage Vacuum Interrupter Switchgear to replace Section 1 – 13.8 kV Switchgear. Contractor shall perform demolition as and install new electrical equipment, wiring, conduit, and accessories as shown in Contract Documents. Furnishing of new Medium Voltage Variable Frequency Drives (MVVFD) for High Service Pump (HSP) 6 and HSP 1. Contractor shall perform demolition and install new electrical equipment, wiring, conduit, and accessories as shown in Contract Documents. Furnishing Primary Unit Substation to replace Transformer 3 in Section 2. Contractor shall perform demolition and install new electrical equipment, wiring, conduit, and accessories as shown in Contract Documents. Installation of Fiber Networking Equipment as shown in Contract Documents – Contractor shall install Owner Provided Networking equipment. Contractor shall furnish and install new network cabinets, patch panels, fiber optic cable, conduit, and accessories. Provide construction of temporary pathway construction for movement of electrical gear into upper mechanical room inclusive of support and required demolition and reinstallation of opening. Installation of new Hardware Components on existing Doors and Frames for Card Reader Access into existing Security Access System as shown in Contract Documents. Provided cable and conduit for security equipment addition. Provide ArcFlash Study Update for all electrical components in the Water Treatment Plant System. ArcFlash study shall update 2021 study at the beginning of the project (pre-equipment install) and update at the end of the project.
There is a mandatory pre-bid conference for bidders, which is scheduled for 10:00 a.m., July 31st, 2024 at the Burnsville Water Treatment Plant at 50 River Ridge Court, Burnsville, MN, 55337.
Digital copies of the Contract Documents can be obtained at www.questcdn.com or www.burnsvillemn.gov/bids. The Quest CDN project number is 9226440. Bidders can download the Contract Documents for $42 by searching for the project on the QuestCDN website’s Project Search page or selecting the Engineering/Public Work Bid link and then the project on the Burnsville website. Please contact QuestCDN.com at +1 (555) 000-0000 or contact@example.gov for assistance with free membership registration, downloading, and working with this digital project information. Bidders can also view the Contract Documents at either website free of charge. For this project we will accept only online electronic bids through QuestCDN. Instructions for online bidding are included in the Project Specifications. For electronic bids, electronic bid bonds will also be accepted through Surety 2000 using project # 9226440. The bid bonds must be payable to the City of Burnsville in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond. The City of Burnsville reserves the right to reject any or all bids, to waive informalities, and to award the bid in the best interest of the City. No bids may be withdrawn for a period of sixty (60) days. The Council will consider such bids in the Council Chambers at 5:30 p.m. Tuesday, September 3, 2024. All questions regarding the project shall be directed to Black & Veatch, Attn: Robert Johnston, +1 (555) 000-0000. Neither Owner nor Engineer has any responsibility for the accuracy, completeness or sufficiency of any bid documents obtained from any source other than the source indicated in these documents. Obtaining these documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining these documents from any source other than directly from the source listed herein may also result in failure to receive any addenda, corrections, or other revisions to these documents that may be issued. Bidders must be licensed contractors in the State of Minnesota. Bids will be received on a lump sum basis, including any alternatives (if applicable) as described in the Contract Documents. Bid security must accompany each Bid. The Successful Bidder will be required to furnish a Construction Performance Bond and a Construction Payment Bond as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract. Contractor and all Subcontractors will be required to conform to the employment requirements set forth in the Contract Documents. BY ORDER OF THE CITY COUNCIL Macheal Collins, City Clerk City of Burnsville, Minnesota Published on the City of Burnsville website (www.burnsvillemn.gov/bids) and on QuestCDN as described above on July 19, 2024
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS