Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on October 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

23WHM FY26 Deer Fence Install Statewide

Closed
State & Local
Submission Closed
Solicitation #
6100066767

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, installation of new slide gates and modifications to existing sluice gates, and improvements to instrumentation, electrical systems, and motor control center components. Additionally, the project encompasses the installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The project has an estimated total cost between $18.5 million and $19.5 million, with a bid opening date of December 2, 2026. This solicitation is designated as a Small Business set-aside, covering SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services including coating and lining, concrete rehabilitation, welding, electrical and instrumentation, and crane services. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 5 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Pennsylvania Game Commission, Bureau of Wildlife Habitat Management, Forestry Division, is soliciting bids for the statewide installation of woven wire deer exclosure fences. The project requires the contractor to provide all labor, materials, tools, and equipment to install fences at least seven feet high with a six-inch ground overlap, using 14-1/2 gauge or heavier galvanized, Bezinal, or class 3 zinc coated steel wire. Specialized installations include man, truck, and skidder gates, as well as experimental deer ramp structures. A critical operational requirement is that the contractor must drive all deer from the fenced area prior to closing the fence, coordinated with a Forestry Division representative. The contract is divided into four regional installation areas: North Central, South Central, Northeast, and Southeast, with an estimated total contract value of 44,609.40 dollars. The contract term begins upon the issuance of the purchase order and terminates on June 30, 2027, though the Redlick Fence on SGL 100 must be completed by March 1, 2027. Award will be made to the lowest responsive and responsible bidder who is registered in the Commonwealth of Pennsylvania's Vendor Master file. Compliance requirements include adherence to the Prevailing Wage Act, Davis-Bacon Act, and various certifications regarding lobbying, Iran-free procurement, and nondiscrimination. Payments will be processed via Automated Clearing House (ACH) within 30 days of receiving a proper invoice. The Commonwealth retains the right to inspect all work and may reject any defective installations, requiring the contractor to replace non-conforming items within 15 days of notification.

General Info

Bids for statewide installation of woven wire deer exclosure fences in Pennsylvania.

Place of Performance

PA, USA

Set-Aside

NONE

Documents

6
DOCX, High priority: read this first16 pages · rfq
High
PDF, High priority: read this first6 pages · specifications
High
XLSX, High priority: read this first9 pages · specifications
High
DOCX, High priority: read this first4 pages · requirements
High
PDF, High priority: read this first30 pages · ifb
High
DOCX, Low priority1 page · other
Low

Read all 6 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

40 mandatory

40 requirements in 9 areas

  • Compliance15 · 15 must
    012

    Performance Security Amount and Type

  • Evaluation5 · 5 must
    007

    Method of Award

  • Cost & Pricing5 · 5 must
    030

    Price Discrepancy Resolution

  • 37 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 40 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • AMC-0166 CRW ASR Public AnnouncementOpen now, due in 32 days
  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 5 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania Game Commission
Contacts1 person available
OfficeN/A

Full Description

Show more
A. The Pennsylvania Game Commission, Bureau of Wildlife Habitat Management, Forestry Division, requires woven wire deer exclosure fence installation. Services shall include, but not be limited to, the furnishing of all labor, superintendence, material, tools and equipment for the installation of woven wire deer exclosure fence as per attached Installation Specifications.

More opportunities from Pennsylvania Game Commission

Same awarding agency

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS