24" Bar-Wrapped Concrete Cylinder Pipe (BCCP) Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of RFP 2026-00-04.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

HICKORY TREE ROAD DWU-WATER LINE RELOCATION

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Community & Business Development
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs 24-inch Bar-Wrapped Concrete Cylinder Water Pipe for prime contractors on City of Balch Springs water line relocation projects. Performs installation of BCCP (Item 2000V), executes tie-ins to existing systems, and implements trench safety measures using shoring and shielding equipment. Adheres to February 2022 DWU Bid Item and Cost Estimating Manual. Delivers a completed and accepted 24" water main.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational station featuring mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The contract is a small business set-aside and will be awarded to the responsible bidder submitting the lowest responsive bid. Bids must be submitted using the EJCDC C-410 form and include a bid bond, evidence of signing authority, and MWBE compliance documentation. Performance and payment bonds are required upon award. Project administration follows EJCDC standard general and supplementary conditions, with payments processed monthly via applications for payment reviewed by the Engineer. Final acceptance is contingent upon a substantial completion inspection, the resolution of a punch list, and a final inspection conducted by the Owner, Contractor, and Engineer.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Texas → Community & Business Development

Same awarding agency

NAICS: 237110
New
SLED
HICKORY TREE ROAD DWU-WATER LINE RELOCATION
Solicitation # RFP 2026-00-04
The City of Balch Springs, Texas, has issued solicitation RFP 2026-00-04 for the Hickory Tree Road DWU-Water Line Relocation project. This stipulated price contract is a critical component of a larger road improvement expansion project involving the conversion of a one-mile stretch of roadway into a three-lane concrete road with sidewalks, curb and gutter, and intersection improvements. The specific scope of work involves the relocation of a Dallas Water Utilities water supply line, including the removal of 83 linear feet of 24-inch bar-wrapped concrete cylinder water pipe. The contractor will be responsible for installing restrained joints, fittings, air and blow-off valves, and managing all tie-ins, trench safety, and traffic control in accordance with Dallas Water Utilities Standards and Specifications. Construction is anticipated to begin in 2028. Proposals are due by November 2, 2026, and will be evaluated based on the Texas Professional Services Procurement Act, focusing on the demonstrated competence and qualifications of the respondent. The selection process involves a points-based evaluation by a committee from Public Services, Business and Capital, Engineering, and the City Manager's Office, with potential interviews for short-listed firms. Bidders must provide a bid bond of five percent of the bid and are required to furnish performance, payment, and maintenance bonds upon award. The contract incorporates EJCDC C-700 Standard General Conditions and requires compliance with various federal and state regulations, including Executive Order 11246 and Title VI of the Civil Rights Act of 1964. Payment is subject to an engineer's review of applications for payment to ensure work has been earned.
Water and Sewer Line and Related Structures Construction

POSTED

about 23 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS