Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on October 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

25-003 Gull Point Community Center Earth Stabilization Project Phase I

Closed
532State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County for the demolition and waste removal of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and side wall walkways. Additionally, the contractor is responsible for removing above-grade utilities, capping or abandoning underground utilities, and clearing dumped materials and interior fencing at the neighboring Emory Grove Village parcel. The selected firm will be tasked with procuring all necessary Montgomery County demolition and raze permits, managing the removal of hazardous materials such as asbestos, and stabilizing the property according to the approved Sediment Control Plan. The contract features an initial performance period of four months from the Notice to Proceed. Proposals are due by October 30, 2026, via the OpenGov Procurement Portal and are evaluated based on schedule (20%), price (15%), and MFD participation. Key compliance requirements include adherence to Davis-Bacon and Maryland Prevailing Wage Laws, mandatory background screenings for all personnel, and participation in the HOC Works Program. Awardees must provide 100% payment and performance bonds, proof of insurance, and execute HUD certifications regarding debarment and suspension. HOC will retain 5% of payments until final acceptance, with liquidated damages of up to 1,000 dollars per day for incomplete work.
Real Estate

POSTED

about 3 hours ago

DEADLINE

in 16 days

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

4

Addendum 1 to ITB 25-003 Gull Point Stabilization Project

PDF, High priority: read this firstamendment
High

Bid 25-003 Gull Point Community Center Earth Stabilization Project Phase 1

PDF, High priority: read this firstitb
High

ITB-25003 Gull Point Stabilization Plans

PDF, High priority: read this firstitb
High

Gull Point Stabilization Project Pre-bid Attendance Sheet

PDF, Low prioritypre-bid-attendance-sheet
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Nov 26, 2024 to Nov 21, 2024. NAICS code changed from 561730 to 238910.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of Pensacola
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → City of Pensacola
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope of WorkThis project shall correct an erosion problem caused by a failed concrete storm pipe located inside of Baywoods Gulley. Currently, water does not flow through the pipes and westmost inlet box as designed. Bizarrely, there is a wide crack that runs the length of the pipe into the ditch bottom inlet, compromising the pipe, and potentially creating an unstable void under the pipe. The growth of this void may exacerbate the slope erosion by sucking sand into the pipe and depositing it downstream.Phase 1 includes determination of the volume of fill material needed to fill in the void and excavated pipe section.This project shall remove the failed pipe, stabilize the subgrade in the pipe area, and stop the slope from eroding further.The length of pipe from the easternmost manhole located beside the community center’s baseball field to the ditch bottom inlet shall be demolished, the excavated void filled and compacted, and the exposed earth lined with pinned, non-woven filter fabric and #57 stone. This will result in a V-shaped depression with fill material brought up to the elevation necessary to accommodate a new pipe and stabilized side slopes.The contractor shall place stone at the site entrance to stabilize the ground and prevent contamination outside the site entrance.A full erosion control plan to FDEP standards shall be furnished by  the contractor.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS