Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on September 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

25-12 Cal883301A & Cal883220A Nutrient Reduction Wetlands

Closed
25-12 Cal883301A & Cal883220AState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335999
New
DIBBS
WIRING HARNESS
Solicitation # SPE4A6-27-R-X142
Solicitation SPE4A6-27-R-X142 is an Indefinite Delivery Purchase Order (IDPO) issued by the Defense Logistics Agency (DLA) Weapons Support ASC Commodities Division for the procurement of wiring harnesses under National Stock Number 5995-01-705-8842. The contract is designed as a fixed-price agreement with a base period of five years, remaining valid until the aggregate total of orders reaches a ceiling of 350,000 dollars. The primary requirement consists of 50 units, with a total delivery timeline of 509 days, which includes 90 days for First Article Testing (FAT) and 329 days for production following FAT approval. Delivery is to be made to various CONUS stock locations, with FOB destination terms applying specifically to FAT requirements. The contract mandates strict quality and security compliance, including ISO 9001:2015 standards and Cybersecurity Maturity Model Certification (CMMC) Level 2. Technical data is subject to ITAR and EAR export controls, and contractors must adhere to DFARS 252.204-7012 for safeguarding covered defense information. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, respectively. Award determination is based on best value, weighing price, past performance, and quoted delivery, with a heavy emphasis on SPRS assessments and historical quality and delivery compliance. Invoicing and payment are processed electronically through the Wide Area WorkFlow (WAWF) system.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

about 2 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contracts Cal883301A and Cal883220A involve comprehensive earthwork, grading, and drainage improvements aimed at nutrient reduction wetlands in Iowa. The Cal883301A project entails extensive excavation, clearing, grading, and installation of tile and outlet structures, along with pump systems powered by solar panels and controls. It includes approximately 15,752 cubic yards of earthwork, over 1,200 linear feet of tile installation, riprap placement, seeding, and pavement replacement, with an estimated cost between $300,000 and $400,000. The project is scheduled for completion by September 1, 2026, with seeding finishing by September 15, 2026. The Cal883220A project is somewhat smaller, focusing on similar activities such as clearing, grading, tile installation, riprap placement, and seeding, but with reduced quantities—around 1,775 cubic yards of earthwork, 172 linear feet of tile, and 218 tons of riprap. It also includes the installation of a tied concrete block mat, concrete structures, and a pump system with solar panels. The estimated cost ranges from $200,000 to $260,000, with completion dates set for June 15, 2026, for all work except seeding, which is due by June 30, 2026. Both projects are part of a solicitation issued by the Iowa Department of Agriculture and Land Stewardship, with a response deadline of October 8, 2025.

General Info

Agency

Iowa Agriculture and Land Stewardship

Place of Performance

IA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa Agriculture and Land Stewardship
Contacts1 person available
OfficeN/A
Organization / Agency
Iowa Agriculture and Land Stewardship
Office AddressN/A

Full Description

Show more
Cal883301A Selective clearing, excavation & grading, along with tile and outlet structures, pump installation, county road and culvert removal and replacement, riprap placement, & seeding. Project includes around 15,752 CY earthwork, 1,217 LF of various tile installation, 158 SY PCC pavement replacement, 390 TB of riprap along with 29 TN Class A Roadstone, 500 LF silt fence, and 14.1 AC seeding. Project also includes installation of 1 pump systems with the associated solar panels & controls. Estimated construction cost is $300,000 to $400,000. Completion Dates: Construction September 1, 2026 Seeding September 15, 2026 AND Cal883220A Selective clearing, excavation &grading, along with tile & outlet structures, pump installation, tied concrete block mat & riprap placement, & seeding. Project includes around 1,775 CY earthwork, 172 LF various tile installation, 2200 SF tied concrete block mat, 2 concrete structures, 218 TN riprap, &14 AC seeding. The project also includes installation of one pump systems with the associated solar panels and controls. The estimated construction cost range for this project is $200,000 to $260,000. Completion Dates: All but Seeding June 15, 2026 Seeding June 30, 2026

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS