Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 13, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2540-01-662-7962 Winterization Kit

Closed
84083245Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336330
New
DIBBS
TIE ROD, STEERING
Solicitation # SPE7LX-27-U-0108
Solicitation SPE7LX-27-U-0108 is a request for quotations issued by the DLA Weapons Support Strategic Acquisition Program Directorate for the procurement of steering tie rods under NSN 2530-01-558-5031. This is a unilateral, fixed-price, indefinite-quantity contract with a maximum value of 350,000.00 USD. The requirement is for an estimated quantity of 5 units, with approved part numbers including Oshkosh Defense LLC 3689233 and Rana Rhythm Automotive USA L-24-VT-9049-A-12 or L24VT9049A13. Delivery is required within 125 days after receipt of order, with shipping terms set as FOB Origin and both inspection and acceptance occurring at the destination. The contractor must adhere to strict technical and quality standards, including MIL-STD-129 for marking and MIL-STD-2073-1E for packaging, alongside DLA packaging requirement RP001. Hazardous materials must be handled and labeled according to IP025 and the Hazard Communication Standard. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment requests. The solicitation is categorized under NAICS code 336330 and requires compliance with various Federal Acquisition Regulation clauses, including those regarding equal opportunity, combating trafficking in persons, and safeguarding covered defense information. All quotes must be submitted via the DLA Internet Bid Board System.
DLA WEAPONS SUPPORT STRATEGIC ACQ PROGRAM DIRECTORATE

POSTED

about 23 hours ago

DEADLINE

in 4 days
NAICS: 336330
New
DIBBS
DETENT PLATE
Solicitation # SPE7L1-27-T-2757
Solicitation SPE7L1-27-T-2757 is a small business set-aside issued by the DLA Weapons Support Land Supply Chain for the procurement of two detent plates, identified by NSN 2530-01-685-1669. This is a restricted source item requiring engineering source approval from the Government Design Control Activity. The required delivery is 20 days after receipt of order, with the destination being the General Depot of Naval Supplies in Kaohsiung City, Taiwan. Inspection and acceptance are both conducted at the origin. The contract mandates strict quality and technical compliance, requiring manufacturers to maintain an inspection system compliant with SAE AS9003 or ISO 9001 tailored to SAE AS9003. Additive manufacturing is prohibited unless specifically authorized. Packaging and marking must adhere to MIL-STD-2073-1E and MIL-STD-129, with palletization following DLA RP001 requirements. Technical data is subject to ITAR or EAR export controls, and contractors must be approved by the DLA controlling authority to access such data. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. The solicitation incorporates various FAR and DFARS clauses, including CMMC Level 2 certification requirements, the Buy American Act, and prohibitions on covered defense telecommunications equipment. Sampling for acceptance must follow MIL-STD-1916 or ASQ H1331, with a requirement for zero non-conformances in the sample lot.
DLA WEAPONS SUPPORT LAND SUPPLY CHAIN

POSTED

2 days ago

DEADLINE

in 11 days
NAICS: 336330
New
DIBBS
TIE ROD END, STEERING
Solicitation # SPE7L1-27-T-2703
Solicitation SPE7L1-27-T-2703 is a small business set-aside issued by the DLA Weapons Support Land Supply Chain for the procurement of steering tie rod ends for 1980 Ford P/U trucks (F100/F150). The requirement consists of two line items, each for a quantity of 4 units (total of 8), under NSN 2530-01-187-7299. The contract specifies a delivery timeframe of 5 days after order, with an original required delivery date of October 26, 2026. Delivery is FOB Origin, and both inspection and acceptance will occur at the destination, specifically the US Army 0015 CS BN CO A Distribution center at Fort Hood, Texas. The contractor must adhere to strict packaging and marking standards, including MIL-STD-129 for labeling and RP001 for palletization. Non-hazardous materials must follow ASTM D3951, while hazardous materials require packaging per TQ requirement IP025. Technical and quality requirements are governed by the DLA Master List, and the removal of government identification from non-accepted supplies is required per RQ011. Invoicing and payment must be processed electronically through the Wide Area WorkFlow (WAWF) system. The acquisition is subject to various federal regulations, including the Buy American Act, the Berry Amendment, and specific DFARS clauses regarding cybersecurity and the prohibition of covered defense telecommunications equipment.
DLA WEAPONS SUPPORT LAND SUPPLY CHAIN

POSTED

2 days ago

DEADLINE

in 11 days

General Info

NAICS

336330 - Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing

Place of Performance

OH

Set-Aside

NONE

Documents

1

SAPD+RFP+Market+Research+Questionnaire.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → DLA Land And Maritime
Contacts1 person available
OfficeCOLUMBUS, OH, 43218-3990, USA
Office AddressCOLUMBUS, OH, 43218-3990, USA

Full Description

Show more
Contract Specialist: Suzanne Maginn Email: contact@example.gov Drawings can be reviewed under - MR016627962 NSN: 2540-01-662-7962 WINTERIZATION KIT, V AMC/AMSC: 1G 1 Suitable for competitive acquisition. (See Notes 1 and 2) G The Government has unlimited rights to the technical rights to the technical data, and the data package is complete. Valid AMCs: 1 and 2. Drawings - WINTERIZATION KIT, Vehicle RQ032: EXPORT CONTROL OF TECHNICAL DATA This item has technical data, some or all of which is subject to export-control of either the International Traffic in Arms regulations (ITAR) or the Export Administration Regulations (EAR), and cannot be exported without prior authorization from either the Department of State or the Department of Commerce. Export includes disclosure of technical data to foreign persons and nationals whether located in the United States or abroad. This requirement applies equally to foreign national employees and U.S. companies and their foreign subsidiaries. DFARS 252.225-7048 is applicable to this data. The Defense Logistics Agency (DLA) limits distribution of export-control technical data to DLA contractors that have an approved US/Canada Joint Certification Program (JCP) certification, have completed the Introduction to Proper Handling of DOD Export-Controlled Technical Data Training and the DLA Export-Controlled Technical Data Questionnaire (both are available at the web address given below), and have been approved by the DLA controlling authority to access the export-controlled data. Instructions for obtaining access to the export-controlled data can be found at: https://www.dla.mil/HQ/LogisticsOperations/EnhancedValidation/ To be eligible for award, offerors and any sources of supply proposed for use are required to have an approved JCP certification and have been approved by the DLA controlling authority to access export-controlled data managed by DLA. DLA will not delay award in order for an offeror or its supplier to apply for and receive approval by the DLA controlling authority to access the export-controlled data. RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT: http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS. RQ001: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (MANUFACTURERS AND NON-MANUFACTURERS) RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL REQUEST FOR VARIANCE (DEVIATION OR WAIVER) RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES RQ016: COMPONENT QUALIFIED PRODUCTS LISTS (QPL)/QUALIFIED MANUFACTURERS LISTS (QML). THIS ITEM CONTAINS ONE OR MORE COMPONENTS DEFINED BY A SPECIFICATION(S) WITH AN ASSOCIATED QUALIFIED PRODUCTS LIST (QPL) OR QUALIFIED MANUFACTURERS LIST (QML). QUALIFICATION REQUIREMENTS IN PROCUREMENT NOTE H02 "COMPONENT QUALIFIED PRODUCTS LIST (QPL)/QUALIFIED MANUFACTURERS LIST (QML)" APPLY. RT001: MEASURING AND TEST EQUIPMENT CONTRACTOR CERTIFICATE OF CONFORMANCE REQUIRED "THIS NSN CONTAINS ONE OR MORE COMPONENTS WHICH MUST CONFORM TO SOURCE CONTROL DRAWING. BY SUBMITTING AN OFFER, THE OFFEROR AGREES TO PROVIDE SOURCE CONTROLLED COMPONENTS FROM SOURCES APPROVED ON THE APPLICABLE SOURCE CONTROL DRAWING." THIS NSN SHALL BE PHYSICALLY IDENTIFIED I/A/W MIL-STD-130. CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE USED NOR INCORPORATED IN ANY ITEMS TO BE DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS. SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR APPROVAL UNLESS THEY ARE AUTHORIZED BY THE SPECIFICATION REQUIREMENTS. SAMPLING: THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION, STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT UNLESS OTHERWISE SPECIFIED IN THE CONTRACT. IAW BASIC DRAWING NR 19207 57K4364 REVISION NR H DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 10896505 REVISION NR D DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7986364 REVISION NR F DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479036 REVISION NR D DTD 06/06/2011 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479062 REVISION NR B DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479659 REVISION NR D DTD 05/13/2013 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7986365 REVISION NR G DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12420928 REVISION NR E DTD 12/10/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12421429 REVISION NR B DTD 05/03/2007 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12420908 REVISION NR J DTD 11/01/2017 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479061 REVISION NR D DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479658 REVISION NR D DTD 05/23/2013 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479666 REVISION NR C DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12369003 REVISION NR H DTD 09/24/2018 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12414739 REVISION NR B DTD 03/01/2005 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12422677 REVISION NR C DTD 06/06/2013 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12420956 REVISION NR B DTD 09/27/2005 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479035 REVISION NR F DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479044 REVISION NR F DTD 08/11/2016 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479661 REVISION NR D DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479697 REVISION NR C DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484526 REVISION NR A DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484543 REVISION NR A DTD 06/29/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12414308 REVISION NR D DTD 02/09/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479060 REVISION NR B DTD 03/15/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479694 REVISION NR G DTD 04/01/2008 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 10937654 REVISION NR F DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479043 REVISION NR D DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479660 REVISION NR B DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479663 REVISION NR D DTD 06/06/2011 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479664 REVISION NR C DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479672 REVISION NR B DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479682 REVISION NR D DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479692 REVISION NR C DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484516 REVISION NR A DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484522 REVISION NR A DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484523 REVISION NR A DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484527 REVISION NR A DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7982736 REVISION NR R DTD 12/21/2017 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 8338572 REVISION NR G DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 8359787 REVISION NR G DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12414310 REVISION NR B DTD 02/09/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12414560 REVISION NR C DTD 01/25/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 57K4373 REVISION NR E DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12420301 REVISION NR E DTD 01/06/2011 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7951726 REVISION NR K DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7951727 REVISION NR H DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7951737 REVISION NR D DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7951748 REVISION NR F DTD 09/05/2019 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7986363 REVISION NR D DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12414570 REVISION NR B DTD 01/25/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12421700 REVISION NR B DTD 03/26/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12417948 REVISION NR B DTD 02/23/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 8338573 REVISION NR H DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12485406 REVISION NR DTD 10/08/2006 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479683 REVISION NR A DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484553 REVISION NR DTD 04/13/2001 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12418730 REVISION NR B DTD 03/21/2011 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484519 REVISION NR B DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12506111 REVISION NR A DTD 06/24/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12478279 REVISION NR DTD 03/30/2005 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12369857 REVISION NR DTD 08/14/1990 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479041 REVISION NR G DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479047 REVISION NR D DTD 06/06/2011 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12414309 REVISION NR C DTD 02/09/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484548 REVISION NR B DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484560 REVISION NR D DTD 05/23/2013 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12422275 REVISION NR A DTD 10/13/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7986167 REVISION NR R DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12489367 REVISION NR DTD 06/29/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12504346 REVISION NR DTD 11/19/2008 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 SC12484543 REVISION NR A DTD 06/29/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479069 REVISION NR E DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484531 REVISION NR D DTD 06/06/2011 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12535437 REVISION NR DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12419079 REVISION NR J DTD 12/18/2017 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12414315 REVISION NR E DTD 02/09/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12414419 REVISION NR F DTD 08/29/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12414473 REVISION NR E DTD 02/09/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12417642 REVISION NR C DTD 04/04/2013 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7951732 REVISION NR K DTD 07/12/2018 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7951731 REVISION NR L DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484525 REVISION NR B DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479063 REVISION NR C DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479064 REVISION NR C DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479066 REVISION NR C DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479070 REVISION NR E DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479684 REVISION NR C DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484529 REVISION NR A DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479038 REVISION NR C DTD 11/08/2013 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484545 REVISION NR C DTD 01/17/2014 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479665 REVISION NR C DTD 04/08/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7951725 REVISION NR K DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 7951734 REVISION NR L DTD 03/28/2014 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 11669705 REVISION NR K DTD 03/28/2014 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12474864 REVISION NR E DTD 07/10/2014 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484530 REVISION NR E DTD 10/06/2016 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12543374 REVISION NR B DTD 11/08/2013 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484517 REVISION NR A DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12543367 REVISION NR A DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484540 REVISION NR A DTD 09/01/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12419954 REVISION NR E DTD 09/22/2016 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12424710 REVISION NR A DTD 10/25/2011 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484552 REVISION NR E DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12414307 REVISION NR E DTD 09/22/2016 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12420325 REVISION NR H DTD 10/24/3012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 57K4364-001 REVISION NR DTD 12/12/2018 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12423047 REVISION NR B DTD 10/15/2013 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479656 REVISION NR D DTD 08/07/2013 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479662 REVISION NR D DTD 06/06/2011 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12543370 REVISION NR B DTD 11/08/2013 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12543377 REVISION NR B DTD 07/18/2013 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484524 REVISION NR B DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484528 REVISION NR A DTD 03/15/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484532 REVISION NR B DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484535 REVISION NR A DTD 05/07/2009 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484554 REVISION NR A DTD 04/08/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12543368 REVISION NR DTD 09/01/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12543372 REVISION NR DTD 09/01/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12543373 REVISION NR DTD 09/01/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12543375 REVISION NR DTD 09/01/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12543376 REVISION NR DTD 09/01/2010 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484518 REVISION NR DTD 03/19/2001 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484541 REVISION NR DTD 03/19/2001 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12479065 REVISION NR G DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12543371 REVISION NR A DTD 08/20/2012 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484534 REVISION NR C DTD 08/11/2016 PART PIECE NUMBER: IAW REFERENCE DRAWING NR 19207 12484533 REVISION NR D DTD 09/24/2018 PART PIECE NUMBER: Please review the NSN listed above and provide any sources that may be able to manufacture these items. The approved sources for this NSN are currently listed above. All information may be submitted directly to the Contract Specialist listed above. This information must be provided by the response date indicated above. NOTE: This project contains Drawings/Specifications. You may access the TDP directly from cFolders and searching for the above cited Solicitation Number. You may access them only through the following link: https://pcf1.bsm.dla.mil/cfolders. The drawings cannot be accessed through DIBBS. Thank you in advance for your assistance.

More opportunities from Department Of Defense → DLA Land And Maritime

Same awarding agency

NAICS: 335313
New
Federal
Switch, Pressure
Solicitation # CM26239122
DLA Land and Maritime, specifically the FMS Tactical LTC Team at DLA Weapons Support - Columbus, is conducting a sources-sought market survey for the procurement of Pressure Switches under NSN 5930-01-324-5328. The agency is seeking information from potential vendors regarding delivery timelines, quantity capabilities, and pricing structures to determine the feasibility of an Indefinite Delivery Contract with a proposed three-year base period and subsequent one-year option periods. The government is specifically looking for data on commercial availability and is requesting drawings or bills of materials to identify similarities between commercial and military equivalents. The current approved source for this item is Cameron Energy Services Corp, identified by CAGE code 05991 with multiple associated part numbers. Due to the AMC 3C designation, this part requires engineering source approval to maintain quality, as the approved sources retain essential technical data and manufacturing knowledge. Other companies wishing to be qualified as approved sources must submit an application package through the DLA Weapons Support Alternate Offer/Source Approval Request Program to demonstrate their ability to manufacture the product to the same or better quality than the original equipment manufacturer. Responses should be directed to Contract Specialist Caitlin Ferry by the deadline of November 4, 2026.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS