Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Utah was posted on May 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2550 North Drainage Project

Closed
26-134State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project involves the removal of an existing storm drain pipe and concrete waterway followed by the installation of new storm drain pipes and structures, addressing utility conflicts by looping as necessary. The work includes rotary milling of existing asphalt and regrading the west leg of the intersection with approximately 18 inches of fill around the concrete waterway, tapering to both the west and east, and preparing the final grade prior to overlay. Additionally, striping will be completed as part of the project. All work must comply with APWA Standards and Specifications to ensure quality and consistency. Bidding for the "2550 North Drainage Project," solicited by the Utah agency, is open until May 28, 2026. Detailed bid documents are available for download through the specified online portal, allowing interested contractors to review the full scope and requirements before submission. The project is located in Utah and is solicited under the number 26-134.

General Info

Removal and replacement of storm drain, asphalt milling, regrading, striping; Utah project, bids due May 28, 2026.

Agency

Utah

NAICS

237990 - Other Heavy and Civil Engineering Construction View NAICS

Place of Performance

UT, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeUT, USA
Organization / Agency
Utah
Office AddressUT, USA
ContactsNo contact information available

Full Description

Show more
The following is a general sequence of Work to be completed under this project: A. Remove existing storm drain pipe and concrete waterway and install storm drain pipe and structures; B. Loop utility conflicts as necessary; C. Rotomill existing asphalt and regrade west leg of intersection with approximately 18-inches of fill at the concrete waterway and tapering in the west and east directions and prepare final grade prior to overlay; D. Striping work; E. All work done according to APWA Standards and Specifications.