Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on November 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

26-004 Groundwater Wells 4 & 5

Closed
26-004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project is estimated at 16,690,000 dollars and is designed by Willis Engineers, who will serve as the owner's representative for the City of Belmont. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and the experience of proposed subcontractors. Bidders must comply with specific socioeconomic requirements, including the submission of MWBE Good Faith Efforts documentation, and the winning contractor is required to self-perform at least 50 percent of the total original contract amount. Key contractual obligations include providing performance and payment bonds, maintaining insurance with an A.M. Best rating of A-VII or better, and adhering to strict technical standards such as AWS and ASME welding qualifications and OSHA fall protection. Payment will be processed in equal monthly amounts using the EJCDC C-620 application for payment.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 3 days
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project involves various construction and supply scopes, including paving, electrical work, aggregate supply, and pipe supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Bids must be submitted via email or fax by the deadline, with conflicting dates listed as October 28, 2026, and December 3, 2026. All submitted quotes must remain valid for 120 days from the bid due date. Qualified subcontractors and suppliers must possess a valid California contractor license and be registered with the California Department of Industrial Relations in accordance with Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance requirements. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to 3 percent. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 5 hours ago

DEADLINE

in 26 days

Documents

2
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstadvertisement-for-bids
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jan 29, 2026 to Jan 15, 2026.

Deadline changed

Response deadline changed from Jan 15, 2026 to Dec 18, 2025.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Flowery Branch
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The City of Flowery Branch Wells 4 and 5 Project will bring two existing wells online to enhance the City¿s water supply system. The work includes construction of a chemical feed building, installation of new water mains, and reconditioning of the existing wells. Site work will involve traditional development and utility construction within both City right-of-way and property, as well as GDOT rights-of-way, including demolition, grading, drainage, and erosion control. All GDOT encroachments will be properly permitted. Water main extensions will be installed using horizontal directional drilling (HDD) and open-cut trenching methods. Work includes a 4-inch DIP HDD crossing (±114 LF) and abandonment of an existing 2-inch main (±103 LF) within GDOT right-of-way. Approximately 1,400 LF of new 8-inch main will be installed along Railroad Street and Cantrell Road with tie-in to Cemetery Road, and another 1,000 LF of 8-inch main will be added along Vireo Drive. Well head lines will range from 4- to 6-inch DIP and vary in lengths. The chemical feed building will contain separate sodium hypochlorite and fluoride rooms, a pipe gallery, and associated well houses. One 12-inch and one 8-inch well will be reconditioned, tested, and equipped with permanent pumps. All facilities will be enclosed within a secure perimeter fence. This project is approved by the Georgia Environmental Protection Division (EPD). A GDOT Utility Encroachment Permit has been obtained for HDD and waterline abandonment, with modifications pending. The contractor will coordinate and pay applicable fees to Georgia Power for pole relocations and to Atlanta Gas Light for gas service to the auxiliary power supply.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS