Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on April 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

26-01 Kos972821A (Kossuth)

Awarded
26-01 Kos972821A (Kossouth)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 11 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 11 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The contract involves the construction and seeding of a traditional breakpoint nutrient reduction wetland located in Kossuth County, Iowa. The work includes selective clearing, excavation, grading, installation of steel sheet piles, tile installation, and water control structures, followed by seeding with specific completion deadlines: construction must be finished by December 31, 2026, with structure seeding by May 15, 2027, and buffer seeding by June 30, 2027. The project is estimated to cost between $350,000 and $450,000. Issued by the Iowa Department of Agriculture and Land Stewardship, the solicitation is identified as 26-01 Kos972821A and is posted for competitive bidding through May 20, 2026. The project will be performed under the oversight of the agency based in Des Moines, Iowa, with contact available via Tracy Blocker for further information. The scope and timeline emphasize environmental restoration while controlling nutrient runoff, contributing to sustainable land and water stewardship in the region.

General Info

Construct wetland in Kossuth County, Iowa; complete by 2027; cost $350K-$450K; includes clearing, excavation, seeding.

Place of Performance

Kossuth County, IA, USA

Set-Aside

NONE

Documents

9

IA-340-15 Manske Wetland Inspection Quality Control Plan

OCTET-STREAM, High priority: read this firstsow
High

Kos972821A Nutrient Reduction Wetland Project Construction Contract Bid No. 26-01

OCTET-STREAM, High priority: read this firstrfb
High

Nutrient Reduction Wetland Project Construction Contract Kos972821A

OCTET-STREAM, High priority: read this firstcontract-document
High

Appendix I

OCTET-STREAM

Notice to Bidders

OCTET-STREAM

Plans

OCTET-STREAM

Proposal and Affidavit

OCTET-STREAM

Schedule of Prices

OCTET-STREAM

Specifications

OCTET-STREAM

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa → Agriculture and Land Stewardship
Contacts1 person available
OfficeDes Moines, IA, 50319, USA
Office AddressDes Moines, IA, 50319, USA

Full Description

Show more
Completion Dates: Construction: December 31, 2026; Seeding: May 15, 2027 (Structure Seeding) & June 30, 2027 (Buffer Seeding)
This is a traditional breakpoint nutrient reduction wetland. Work involves selective clearing, excavation, grading, steel sheet pile installation, tile installation, water control structure and seeding. he estimated construction cost range for this project is $350,000 to $450,000.

More opportunities from Iowa → Agriculture and Land Stewardship

Same awarding agency

NAICS: 237110
SLED
26-13 Wor982210D (Worth)
Solicitation # 26-13
The Wor982210D Nutrient Reduction Wetland Project, managed by the Iowa Department of Agriculture and Land Stewardship, involves the construction of East and West wetland systems in Worth County, Iowa. The scope of work includes selective clearing, excavation of approximately 7,500 cubic yards of earthwork, installation of 700 linear feet of pipe, and the placement of 129 tons of riprap. Key infrastructure deliverables include three solar pump systems, two modified SW-512 intake concrete structures, three modified SW-513 outlet concrete structures, and two modified SW-401 and 402 lift station concrete structures, concluding with 2.5 acres of seeding. The estimated construction cost is between $225,000 and $325,000. The contract will be awarded to the lowest responsible bidder, with a bid submission deadline of November 12, 2026. Performance requirements include a 10% bid bond and a performance/payment bond equal to 100% of the contract price, which must remain in place for one year following final acceptance. All work except seeding must be completed by September 1, 2027, with all seeding finalized by December 15, 2027. Project administration includes a 3% retainage on progress payments and requires strict adherence to OSHA safety standards and NRCS specifications. Final acceptance is contingent upon a written certification from the engineer, Bolton & Menk, and the completion of all punch list items.
Water and Sewer Line and Related Structures Construction

POSTED

11 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS