Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

26-13 Wor982210D (Worth)

Active
26-13 Wor982210D (Worth)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project involves the construction of East and West wetland systems in Worth County, Iowa, managed by the Iowa Agriculture and Land Stewardship agency. The scope of work focuses on treating water from an existing ditch using solar panel powered pumps and includes selective clearing, excavation, grading, and the installation of pipe, riprap, and various concrete intake, outlet, and lift station structures. Key material requirements include approximately 7,500 cubic yards of earthwork, 700 linear feet of pipe, 129 tons of riprap, and 2.5 acres of seeding. The contract will be awarded to the lowest bidder with an estimated construction cost ranging between 225,000 and 325,000 dollars. Construction is scheduled for completion by September 1, 2027, with seeding required to be finished by December 15, 2027, in accordance with specific guidelines. Responses to the solicitation are due by November 12, 2026.

General Info

Construction of Worth County wetland systems by September 2027, costing $225,000 to $325,000.

Documents

9

A - Notice to Bidders

PDF

B - Bid Book

PDF

C -Specifications

PDF

D - Plans

PDF

E - H&H Report

PDF

F - Geotechnical Report

PDF

G - Schedule of Prices

PDF

H - Doc CC Proposal - Acknowledgment - Affidavit

PDF

I - Doc EE Bid Bond

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIowa → Agriculture and Land Stewardship
Contacts1 person available
OfficeDes Moines, IA, 50319, USA
Office AddressDes Moines, IA, 50319, USA

Full Description

Show more
This project is for the construction of the East and West wetland systems as shown in the plans, which will be awarded together to the lowest bidder. In general, the work includes constructing a wetland that will treat the water from an existing ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, pump installation, tile installation, riprap placement, and seeding. This project includes around 7,500 cubic yards of earthwork, 700 linear feet of pipe installation, 129 tons of riprap, installation of 2 modified SW-512 intake concrete structures, 3 modified SW-513 outlet concrete structures, 2 modified SW-401 and 402 lift stations concrete structures, 3 solar pump systems and 2.5 acres of seeding. The estimated construction cost range for this project is $225,000 to $325,000.
Completion Dates: Construction September 1, 2027 Seeding December 15, 2027 (must follow seeding dates stipulated in the Specifications)

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC, plumbing, and testing infrastructure. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls, for further details.
GSE Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, alongside the demolition of existing pumps and piping. The completed facility must include mechanical and electrical systems, pumps, a generator, odor control equipment, stormwater facilities, and fencing. Additional requirements include the installation of new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a signed bid form, bid security, evidence of authority to do business in North Carolina, and specific MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10 percent for the State of NC and approximately 10 percent for the EPA. The project is governed by EJCDC C-700 General Conditions and Supplementary Conditions, requiring performance and payment bonds as well as proof of insurance. Administration is managed by the City of Belmont with Willis Engineers serving as the project engineer.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Iowa → Agriculture and Land Stewardship

Same awarding agency

NAICS: 237990
SLED
26-10 Car833409A (Carroll) RFB
Solicitation # 26-10
The State of Iowa Department of Agriculture and Land Stewardship is soliciting bids for the Car833409A Nutrient Reduction Wetland Project located in Carroll County. The project involves constructing a wetland to treat water from an existing ditch using a solar panel powered pump. The scope of work includes approximately 19,861 cubic yards of earthwork, 835 linear feet of pipe installation, 29 tons of riprap, and 2.4 acres of seeding. Key structural components include a Modified SW-513 concrete outlet structure and a lift station consisting of a SW-401 concrete structure and a solar pump system. The estimated construction cost for the project ranges from 150,000 to 250,000 dollars. Bids must be submitted via the IMPACS portal by 3:00 PM on October 27, 2026, and must include a bid bond for 10 percent of the base bid. The contract will be awarded to the lowest responsible bidder based on price and qualifications, including registration with the Iowa Department of Inspections, Appeals and Licensing and ownership of at least 20 percent of their own equipment. The successful contractor must provide a performance and payment bond for 100 percent of the contract price within 14 days of the award. All general construction work must be completed by September 1, 2027, with buffer and structure seeding completed by December 15, 2027.
Other Heavy and Civil Engineering Construction

POSTED

19 days ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS