26-18 Sto842436B (Story)

Open
26-18State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sto842436B Nutrient Reduction Wetland project, managed by the Iowa Department of Agriculture and Land Stewardship, involves constructing a pumped tile zone wetland in Story County, Iowa. The scope of work includes selective clearing, excavation of approximately 13,900 cubic yards of earthwork, installation of 1,875 linear feet of pipe, and the placement of 20 tons of riprap. Key infrastructure deliverables include modified SW-513 concrete inlet and outlet structures, a modified SW-401 concrete manhole and pump basin, and a solar-powered pump system to treat water from an existing drainage district tile and ditch. The project also requires the seeding of 27.3 acres. The estimated construction cost is between $175,000 and $275,000. Construction must be completed by November 1, 2027, with seeding finished by December 15, 2027. The contract will be awarded to the lowest responsible bidder, with evaluations based on bid price and bidder qualifications. Bidders must be registered with the Iowa Department of Inspections, Appeals and Licensing and provide a bid bond of ten percent. The contractor is responsible for all construction supervision, safety, and the cost of material and construction compliance testing. Progress payments are managed via Document SS, and final acceptance requires written certification from the engineer that the work substantially conforms to the contract documents.

General Info

Iowa project to construct a pumped nutrient reduction wetland in Story County.

Place of Performance

Story County, IA, USA

Set-Aside

NONE

Documents

9
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstpresolicitation
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstbid-schedule
High
PDF, Low prioritybid-bond
Low

Read all 9 documents

Due in 38 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 38 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 9 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIowa → Agriculture and Land Stewardship
Contacts1 person available
OfficeDes Moines, IA, 50319, USA

Full Description

Show more
Completion Dates: Construction November 1, 2027 Seeding December 15, 2027 (must follow seeding dates stipulated in the Specifications)
In general, the work includes constructing a wetland that will treat the water from an existing drainage district tile and ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, inlet and outlet concrete structures, solar-powered pump installation, installation of pipe, riprap placement, and seeding. This project includes around 13,900 total cubic yards of earthwork, 1,875 linear feet of pipe installation, 20 tons of riprap, Modified SW-513 concrete inlet structure, Modified SW-513 concrete outlet structure, modified SW401 concrete manhole, modified SW401 pump basin, solar pump system and 27.3 acres of seeding. The estimated construction cost range for this project is $175,000 to $275,000.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
20083
Solicitation # 20083
The City of Grand Rapids Department of Engineering is soliciting bids for improvements to the Richmond Park Playground in Michigan. The scope of work involves the removal of existing playground equipment and parking stops, and the installation of new site amenities. Key deliverables include the installation of specific playground equipment from Penchura, LLC (Design Number# PEN1185689-03), including a 2-5 structure, 5-12 structure, Folio Balance Climber, Footprint Stepper, and Footprint Wobble Bouncer. The project also requires the use of tamper-proof hardware for site furnishings and the use of Granular Material Class III to fill voids created during removal. All work must adhere to the City of Grand Rapids Standard Construction Specifications and ADA Standards for accessible design. The contract will be awarded based on the Engineer's estimate of quantities, with the City reserving the right to select a bidder other than the lowest if it is in the City's best interest. Bidders must provide a bid bond or cashier's check for at least 5% of the bid amount and submit a completed list of subcontractors and suppliers. Construction must begin within seven calendar days of contract execution, with a substantial completion date of August 1, 2027, and final completion by September 15, 2027. Final acceptance is contingent upon the closure of the LUDS permit, Water Department approval of curb stop boxes, and the completion of all punchlist items. A one-year warranty period follows final completion. There is no specified set-aside status for this solicitation.
City of Grand Rapids Department of Engineering

POSTED

about 3 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
SLED
Shoreline stabilization, Twin Lakes, Calhoun County
Solicitation # 27-02-13-01
The Iowa Department of Natural Resources is soliciting bids for shoreline stabilization at Twin Lakes State Park in Calhoun County, Iowa, under contract number 27-02-13-01. The scope of work involves clearing and grubbing trees, shrubs, and brush, with tree removal specifically required between October 1 and March 31. Key deliverables include the placement of 398 tons of Class E Revetment field stone and 8 tons of beach armoring along 550 feet of shoreline, the installation of 132 linear feet of 8-inch corrugated HDPE pipe with two rodent guards, the placement of 50 boulders measuring at least 3'x3'x3', and the construction of a 50'x20' stabilized construction entrance. The project must adhere to current Iowa DOT Standard Specifications for Highway and Bridge Construction. This is a competitive quotation for a minor public improvement contract awarded to the lowest responsive and responsible bidder on a unit price basis. Bids must be submitted electronically to [email hidden] by 3:00 PM on December 10, 2026. The contractor is responsible for all labor, materials, equipment, and insurance, including a certificate of liability and property damage insurance. Performance bonds are required for contracts totaling $20,000 or more. Payment terms are set at 30 days from the receipt of an approved payment request, with the Department reserving the right to withhold up to 3% per Iowa Code Chapter 573. There is no set-aside status specified for this solicitation.
Department of Natural Resources

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Iowa → Agriculture and Land Stewardship

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS