This Solicitation opportunity from Massachusetts was posted on December 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
26-31-MYR Renovation of CLC Kitchen
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Salem, Massachusetts, has issued a solicitation for the renovation of the kitchen at the Mayor Jean A. Levesque Community Life Center (CLC), located at 401 Bridge Street, Salem. This project involves comprehensive renovation work within an existing two-story, wood-framed structure and encompasses architectural, mechanical, electrical, plumbing, HVAC, fire alarm, and finish system upgrades in the kitchen area. Detailed construction documents, including technical specifications and drawings prepared by DMS Design, LLC, specify demolition, layout modifications, system installations, and finishes necessary to meet current code and performance standards. The contract requires compliance with Massachusetts General Laws Chapter 149, prevailing wage statutes, OSHA safety training, and associated regulatory and permitting obligations. The solicitation invites sealed bids due by December 23, 2025, with an optional site visit on December 10, 2025, and emphasizes non-collusion, tax compliance, labor harmony, and submission of various certifications and weekly payroll documentation. The project administration framework mandates submittals such as welding, installer, manufacturer, product, and material certifications, along with scheduled testing and inspection reports to ensure compliance with contract requirements and industry standards like ASTM, ASME, NFPA, and ICC-ES. Inspections include both source (factory) and field (site) quality control testing, with final acceptance occurring on-site through the Architect’s approval and issuance of Certificates for Payment. Delivery and performance are designated at the Project Site, with materials and equipment furnished ready for installation and protected against moisture and damage in storage and transit. The contract enforces strict control of subcontracting and assignment, insurance coverage, indemnification provisions, and required written approval for any change orders. Payment terms are generally governed by the Office of the City Auditor with invoicing following established AIA procedures. While the contract type and estimated value are not specified, the inclusion of standard AIA change order mechanisms and comprehensive submittal requirements indicates a firm-fixed-price or lump-sum construction contract framework overseen by the City’s project management. Administrative and technical points of contact are identified, with Anthony P. Delaney serving as the primary government official liaison.
General Info
Place of Performance
Set-Aside
Documents
5AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 26 days
- Building 262 Renovations FLETC GlyncoOpen now, due in 11 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Massachusetts → City of Salem
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
