Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

26-58007 Mobile Ground Control Station (MGCS) and Cargo Trailer for Drone Field Operations Q&A #2

Open
26-58007International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The National Research Council of Canada (NRC) is soliciting the design, integration, and delivery of a Mobile Ground Control Station (MGCS) and an enclosed cargo trailer to support drone field operations. This system is intended to consolidate flight data acquisition, processing, and the transport of unmanned aerial systems (UAS), ground robots, and crew into a single mobile platform. The MGCS vehicle must serve as a self-propelled command center with high-performance computing, power generation, and communication capabilities, while the cargo trailer provides space for larger drones, unmanned ground vehicles, or all-terrain vehicles. The system must be modular to allow for future upgrades and must enable field operations to commence within 30 minutes of arrival at a remote location. The contract will be awarded to the compliant offer with the highest combined rating of technical merit (20%) and price (80%). All deliverables must be received by March 15, 2027, with final acceptance by March 31, 2027, delivered DAP Mirabel, Quebec. The vehicle and trailer must comply with Canadian and U.S. road safety requirements and Canadian electrical codes, and must be operable with a standard Canadian provincial driver's license. Payment is structured based on contract completion milestones: 10% for design review, 20% for fabrication, 20% for system integration and testing, and 50% upon final delivery and acceptance.

General Info

NRC seeks a mobile ground control station and trailer for drone operations.

Documents

3
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstrfp
High
PDF, Low priorityq-and-a
Low

Read all 3 documents

Due in 23 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 23 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 3 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGovernment of Canada → National Research Council of Canada
Contacts1 person available
OfficeN/A

Full Description

Show more
26-58007 Mobile Ground Control Station (MGCS) and Cargo Trailer for Drone Field Operations Question and Answer Number 2 (Q&A #2) Please see tender documents for (Q&A #2) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME __________________________________________________________________________________________________________________________________ 26-58007 Mobile Ground Control Station (MGCS) and Cargo Trailer for Drone Field Operations Question and Answer Number 1 (Q&A #1) Please see tender documents for (Q&A #1) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME __________________________________________________________________________________________________________________________________ 26-58007 Mobile Ground Control Station (MGCS) and Cargo Trailer for Drone Field Operations The National Research Council of Canada (NRC) Centre for Drone Innovation (CDI), part of the Drone and Flight Autonomy Laboratory (DFAL), requires the design, integration, and delivery of a Mobile Ground Control Station (MGCS) and complementary enclosed cargo trailer (collectively referred to as the “MGCS System”). The MGCS System will support experimental flight data acquisition and processing in remote environments, and in-situ demonstrations of novel applications of unmanned aerial systems (UAS), counter-UAS technologies, and mobile sensor networks. It will support research activities in: • Concurrent multi-UAV operations, including ground robots; • Exploration and Mapping, and Intelligence, Surveillance and Reconnaissance (ISR) applications; • Electronic Warfare (EW), Security, Counter-measures deployment, and drone threat mitigation; • BVLOS experimentation; and • AI/autonomy research. Background Researchers at the NRC‑CDI regularly conduct outdoor experiments and advanced technology demonstrations at remote test locations for government and industrial clients. These activities require transporting multiple drones, instrumentation, computing systems, field equipment, and crew. Current deployments require multiple transport vehicles and significant setup time. The MGCS System is intended to consolidate these capabilities with efficient reliable operations into a mobile platform. 1.0 Requirement: The MGCS System must operate as an extension of NRC’s laboratory computing, and communications infrastructure and enable rapid deployment to remote field locations, with flight testing and data collection activities commencing within approximately 30 minutes of arrival. Given the fast development pace of UAS and C-UAS technologies, the MGCS System must be modular in its design approach and implementation to support future expansion, subsystems replacements, and integration of future sensors, communications equipment, computing infrastructure upgrades, and mission systems. The requirements identified in the following subsections represent NRC's fundamental requirements for the MGCS System and are intended to describe the minimum functionality, features, and performance objectives sought under this SOR. The requirements are not intended to be an exhaustive list of all components, features, or accessories that may be required to provide a complete and operational solution. Where appropriate, Offerors may propose equivalent or alternative solutions, products, features, components, or configurations, provided that the proposed recommendation meets or exceeds the functional, operational, and performance requirements specified in this Statement of Requirement. Offerors should clearly identify any proposed substitutions and provide sufficient technical information and rationale to demonstrate equivalency. Offerors may also identify optional features, enhancements, or add-ons that are not included in the proposed compliant solution. Any such optional items must be clearly identified and priced separately in the Annex Basis of Payment and will not form part of the evaluation unless expressly stated otherwise in the solicitation. Following contract award, NRC's Technical Authority will work collaboratively with the successful Offeror during the design phase in a stage-gate review process to refine and finalize the requirements, system layouts, integration details, equipment list, and implementation plan to ensure the MGCS System is optimized for NRC's current and future evolving operational needs. Any resulting refinements must remain within the scope of the Contract and shall not reduce the minimum technical requirements specified herein. Please refer to tender documents for the Specifications.

Similar Contracts

Same NAICS industry code

NAICS: 336212
New
Federal
23--Northern California Area Office (NCAO) Low Bed Tra
Solicitation # 140RR027Q0023
Solicitation 140RR027Q0023 is a Request for Quotation issued by the Bureau of Reclamation's Northern California Area Office for the procurement of one new 2027 lightweight 35-ton, 2-axle, 2-frame, 8-tire, air flip tail low bed trailer with a detachable gooseneck. The equipment must be constructed from 100% T-1 high tensile Swedish Strenx 700 steel and comply with California Vehicle Code section 27600. This procurement is a total small business set-aside, and the government will award the contract to the responsible offeror whose proposal is most advantageous based on technical ability to meet salient characteristics, past performance via CPARS, and price reasonableness. The contractor is responsible for all manufacturing, assembly, labor, and shipping to the destination in Shasta Lake, California. Key deliverables include the trailer and gooseneck, technical blueprints for approval prior to fabrication, and internal quality control documentation submitted before delivery. Final acceptance is contingent upon a comprehensive on-site inspection by a government mechanic and the Contracting Officer's Representative. Quotes must be submitted in PDF format to Erma Clark by November 16, 2026, and must include a completed pricing schedule for all line items. Payment will be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform System.
Reclamation Contracting Activity

POSTED

about 7 hours ago

DEADLINE

in 12 minutes
View Details
NAICS: 336212
New
SLED
Heavy Duty Utility Trailer for CSMS #2 Cullman
Solicitation # SRC0000037666
The State of Alabama is soliciting quotes for one new, unused heavy-duty gooseneck equipment trailer for CSMS #2 Cullman. To be eligible, bidders must be authorized dealers and must upload a spec sheet of the quoted trailer and detailed warranty information with their proposal. The trailer must feature a treated wood deck at least 81 inches wide and 26 feet long, with a minimum cargo payload capacity of 14,000 pounds. Required hardware includes two heavy-duty axles, electric brakes on both axles, a battery-powered breakaway braking system, two heavy-duty front landing jacks, and two heavy-duty stand-up loading ramps. Additional required accessories include a winch mounting plate, a battery tray, and one mounted spare tire and wheel. The trailer must comply with DOT-compliant LED lighting and all Federal Motor Vehicle Safety requirements. Permanent markings for the manufacturer's VIN, certification label, axle and tire ratings, and safety markings must be affixed to the unit. Delivery is required to the address specified in the solicitation, and the government will perform an inspection at the time of delivery to ensure all technical specifications and documentation, including the manufacturer's certificate of origin and operator's manual, are provided. Proposals must be submitted electronically via the Alabama Buys portal. Suppliers must certify compliance with Alabama sales and use tax laws, and a Disclosure Statement is required for any contract exceeding 25,000 dollars.
Army MCA_App 01_Real Property Operations & Maintenance, State Military Department

POSTED

3 days ago

DEADLINE

in 7 days
View Details
NAICS: 336212
New
SLED
Trailer - Parkways
Solicitation # 405
The Jefferson Parish Government is soliciting bids for the purchase of a trailer for the Parkways Department under solicitation number 405. The required trailer must meet specific technical minimums, including W6 x 16 lbs per foot I-beams with SLB4" x 3.2 lbs crossmembers at 18" centers, 8,000 lb capacity axles with 12" x 3 3/8" electric brakes, and four 215/75R17.5 (H) tires with 6" x 17.5" 8 hole steel disc wheels. Additional requirements include LED lights, sealed modular neoprene jacketed wiring, four D-rings per side, a 2 1/2"x10" hydraulic jack, and a black urethane finish with rust prohibitive undercoating. Vendors must possess a Louisiana Dealers License to be eligible. The contract award will be based on the lowest responsive and responsible bidder. To be considered responsive, the apparent low bidder must provide final insurance certificates, including Commercial General Liability of $1,000,000 per occurrence, within ten calendar days of the bid opening. All insurance must conform to Jefferson Parish Resolution No. 136353 or No. 141125. Contractors are prohibited from starting work until all insurance and evidentiary requirements are met, and failure to maintain this coverage throughout the contract term may lead to suspension or termination. Requests for insurance deviations must be submitted in writing to the Purchasing Department before the bid due date.
Jefferson Parish Government

POSTED

3 days ago

DEADLINE

in 2 days
View Details

More opportunities from Government of Canada → National Research Council of Canada

Same awarding agency

NAICS: 238220
New
International
50HUM26 Steam-to-Electric Conversion
Solicitation # 26-58218
The National Research Council Canada (NRC) is soliciting proposals for the 50HUM26 Steam-to-Electric Conversion project located at Building M-50, 1200 Montreal Road, Ottawa, Ontario. The scope of work involves replacing humidifier 50HUM26 with a new electric unit, removing all existing steam infrastructure in the ATF C Wing, and isolating, valving, and capping associated services in the main building. Additionally, the contractor must remove obsolete electrical equipment and replace it with new equipment. All work must comply with the National Building Code of Canada 2020, the National Fire Code, and the Canadian Environmental Protection Act. This solicitation is open exclusively to Canadian Contractors and is governed by General Conditions for Construction Services, including the Federal Prompt Payment for Construction Work Act. Key requirements include the provision of closeout submittals, test and balancing reports, and the supply of spare parts and maintenance materials. The contractor is responsible for self-performed inspections and the coordination of third-party accredited testing agencies. Performance will be evaluated based on quality of workmanship, timeliness, project management, and adherence to health and safety standards. All personnel must maintain visible identification badges and adhere to security requirements. Submissions must be transmitted via email to the contracting authority by the deadline of December 10, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 14 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS