Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Georgia was posted on June 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

26-U-4788 Gas Easement Remediation

Closed
PE-67655-NONST-2026-000000033State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetment repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a 10 percent price evaluation preference. Bidders must submit sealed physical bids by September 30, 2026, as electronic submissions are not permitted. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The contract stipulates liquidated damages of 2,297 dollars per calendar day of delay and requires a third-party qualified surveyor for pre- and post-dredge multi-beam hydrographic surveys to verify final quantities.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 18 days
NAICS: 237990
New
Federal
Station Umpqua River Floating Dock Repair
Solicitation # 70Z03326QSEAT0015
The Department of Homeland Security, through the U.S. Coast Guard Base Seattle, is soliciting bids for a firm-fixed-price contract to repair the floating pier at Station Umpqua River in Winchester Bay, Oregon. The project involves providing all personnel, equipment, and tools to remove deteriorated wooden whalers and hardware and install three layers of 4 by 12 inch wooden whalers, through rods, roller hoops, and an egress ladder, while reinstalling ten existing cleats. The estimated period of performance is from September 21, 2026, to October 22, 2026, with a required completion date of October 14, 2026. This is a total small business set-aside under NAICS code 237990. A mandatory site visit is scheduled for August 27, 2026, at 10:00 AM, and interested offerors must submit their attendee lists by August 26, 2026. Proposals are due by September 14, 2026, at 3:00 PM PST and must be submitted via email to the contracting officer. Submissions are limited to six pages and must include a completed SF 1442, a detailed price breakdown covering mobilization, materials, and labor, and a technical proposal detailing the approach and project schedule. Evaluation will be based on technical capability, past performance, and price, with technical capability being the most significant factor. Awardees must be registered in the System for Award Management and comply with Davis-Bacon Act wage determinations for Douglas County, Oregon.
Base SEATTLE(00033)

POSTED

about 23 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract involves the complete installation of approximately 144 linear feet of 36-inch reinforced concrete pipe (RCP) across nine culvert crossings, along with the placement of nine RCP flared end sections equipped with trash racks. Additionally, the scope includes the installation of 270 square yards of type 3 riprap, improvements to access drives by applying 4,000 square yards of 200-pound woven fabric and 720 tons of #4 surge stone, as well as associated grading and erosion and sedimentation control measures. The work requires furnishing all labor, materials, tools, equipment, safety measures, permitting, taxes, and other costs necessary for completion. The total project must be finished within 90 consecutive calendar days. Coordination with the City of Warner Robins and existing utility owners along the project corridor is mandatory, and the project management will be handled by GWES, LLC, based in Perry, Georgia. The work is to be executed according to specified plans and requirements, with the contract awarded as a single package. The solicitation is issued by the City of Warner Robins, with a response deadline of July 9, 2026. All communications and inquiries related to the contract are to be directed to the primary contact, Allison Lanneau.

General Info

Install 144 feet of 36-inch RCP, nine culverts, riprap, access improvements, complete in 90 days.

Agency

Georgia → City of Warner Robins

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(2)

City of Warner Robins Gas Easement Remediation IFB 26-U-4788 May 2026

PDFifb

Gas Easement Remediation IFB 26-U-4788 Warner Robins GA

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Warner Robins
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Warner Robins
Office AddressN/A

Full Description

Show more
The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Installation of approximately 144 L.F. of 36¿ reinforced concrete pipe (RCP) for nine (9) culvert crossings, nine (9) RCP flared end sections with trash racks, 270 S.Y. of type 3 riprap, access drive improvements to include installation of 4,000 S.Y. of 200-lb woven fabric and 720 TN of #4 surge stone, and associated grading and erosion and sedimentation control. The time allotted for final completion of work is 90 consecutive calendar days.
Contractor will be required to coordinate all work with the City of Warner Robins and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at 733 Carroll Street, Perry, GA, 31069, telephone number (478) 235-0307.
All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS