Drainage Pipe Installation & Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Drainage Pipe Installation and Replacement involves providing specialized services for prime contractors on Georgia Department of Transportation projects. The scope of work includes the excavation and disposal of failed drainage pipes, bedding preparation, the installation of new replacement piping, and professional joint sealing to ensure a fully functional drainage system. All work must be performed in strict accordance with GDOT routine maintenance standards. Additionally, contractors are required to provide a Georgia Security and Immigration Compliance Act Affidavit. The solicitation was posted on October 28, 2026, with a response deadline of November 12, 2026.

General Info

Subcontract for GDOT drainage pipe installation and replacement services in Georgia.

Documents

This scope was carved out of 48400-eRFQ-002146-2027.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

T32-D2-Drain Rehab-SR29 Baldwin-194668

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs the removal of existing failed drainage pipes and the installation of new replacement piping for prime contractors on Georgia Department of Transportation (GDOT) projects. Excavates existing pipe, removes and disposes of old materials, prepares bedding, lays new pipe, and performs joint sealing. Requires compliance with GDOT routine maintenance standards and a Georgia Security and Immigration Compliance Act Affidavit. Delivers a functional drainage pipe system.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Georgia → Department of Transportation

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS