26-West Valley Campus 2/3 Expansion

Closed
26-WV2-EXPState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under the Recharge Master Plan Update. The solicitation is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The response deadline for this opportunity is November 4, 2026. To ensure project financing and avoid being deemed non-responsive, bidders must strictly adhere to comprehensive Good Faith Effort (GFE) requirements that expand upon State Water Resources Control Board standards. Critical mandates include providing proof of online solicitation postings for 30 consecutive calendar days and a print newspaper posting for at least one day prior to the bid opening. Additionally, bidders must submit evidence of utilizing the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA) within their bid package. While outreach documentation such as call logs and emails may be submitted up to three business days after the closing date, all other GFE certifications must be completed before the bid opening.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, following a fire sprinkler discharge. The project requires the full restoration of the first, second, and third floors, including dormitory rooms, offices, conference rooms, and hallways. The scope of work encompasses architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring and rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA, OSHA, and EPA regulations, as well as local Massachusetts building codes. The contract is a single lump sum award based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory pre-bid site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and certification of compliance with the latest Wage Rate decisions. Administrative requirements include Net 30 payment terms and a one-year guarantee of workmanship upon substantial completion. The contract is subject to the Davis-Bacon Act, requiring specific minimum wage payments and paid sick leave for employees. Contractors must provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. The project is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting, along with the temporary removal and re-installation of HVAC equipment. The project is set as a small business set-aside and is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide a detailed proposal including relevant experience, a safe work method description covering project phasing and occupied-building protection, and itemized pricing by room and trade. Financial requirements include providing payment and performance bonding for the full project value, as well as general liability insurance with a minimum of 1 million dollars per occurrence and 3 million dollars general aggregate, all due within ten days of award. The contractor is responsible for all testing of restored mechanical, plumbing, electrical, and life-safety systems, and must provide a minimum one-year workmanship warranty upon final acceptance by CSD. Performance is scheduled to occur between February 1, 2024, and March 31, 2024.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at Naval Submarine Base New London in Groton, Connecticut, involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope of work includes the installation of overhead cranes, foundations with rigid inclusions and load transfer mats, reinforced concrete floors, and comprehensive grounding, lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and buildings 524 and 393. The project duration is 1828 calendar days and encompasses extensive site work, including clearing, rock excavation, grading, and wetlands mitigation. Infrastructure improvements include the development of access roads, paved loading areas, landscaping, and a full electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories and covers a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, and plumbing services.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in about 8 hours
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia, with potential associated upgrades to Buildings 261 and 263. The scope of work includes comprehensive interior finishes such as replacing corridor and classroom flooring with LVP and carpet tiles, repainting walls to a level 4 finish, and updating signage. Technical upgrades involve renovating restrooms with new vanities and lavatories, installing raised flooring with integrated electrical distribution in classrooms, and replacing variable air volume systems and lighting controls. The project is a Firm Fixed Price contract with a performance period of 425 calendar days, scheduled from January 11, 2027, to March 11, 2028. Award will be determined using a best suited then negotiate methodology, evaluating past performance from the last five years, corporate relevant experience, and price fairness. Offerors must provide payment and performance bonds, and a bid guarantee of 20 percent of the bid price or 3 million dollars. Due to the facility's nature, personnel must undergo background checks, including FBI fingerprinting and DHS non-disclosure agreements, and comply with strict security and safety protocols. Proposals must be submitted by November 18, 2026, and include a detailed cost breakdown via Exhibit A, signed Standard Form 1442, and required past performance questionnaires.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope repairs, new modified bitumen roofing, and interior reconfiguration. Key technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements such as paving removal and replacement, drainage upgrades, and hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Bidders must provide pricing for two specific exhibit line items: building renovation and paving work. Proposals are due by November 23, 2026, and will be evaluated based on the lowest price. Depending on the proposal value, bonding requirements may include bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The project is subject to the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Contractor deliverables include a comprehensive Quality Control Plan, operation and maintenance manuals, and a 20-year no dollar limit warranty on specific roofing labor and materials.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The State of Utah Division of Purchasing, acting on behalf of Utah Charter Academies (UCA), is soliciting bids for a Construction Management/General Contractor (CM/GC) services contract to expand the American Preparatory Academy’s West Valley Campus 2/3 facility. The project involves two overlapping construction phases: Phase 1 includes a new elementary classroom addition with six general classrooms, three breakout rooms, and restrooms, scheduled to open for the 2027/28 school year; Phase 2 involves constructing secondary classrooms for band, orchestra, dance, and drama—with one drama room designed as a black box theater—and a new 450-seat auditorium with full support spaces, to be completed for the 2028/29 school year. A separately bid alternate covers the shell of a future lunch preparation kitchen. The fixed limit of construction cost is set at $16,093,075, and bidders must submit detailed cost proposals for preconstruction fees, construction management fees, supervision costs, and temporary construction costs, while the design will evolve through collaborative input from the CM/GC during preconstruction. Proposals must be submitted electronically via Bonfire by August 28, 2026, and must consist of separate, non-pricing technical and cost responses, with the technical submission limited to 15 pages, excluding cover and tab sections, and formatted as a single PDF with seven required tabs and a separate 11” x 17” summary sheet. The contract is governed by the State of Utah’s Agency Standard Terms and Conditions, dated September 16, 2024, which governs all aspects of performance, compliance, and dispute resolution. Key terms include a venue for legal proceedings in Salt Lake City’s Third Judicial District Court, a requirement for contractors to retain records for six years after final payment, and mandatory insurance coverage with minimum limits of $1 million per person/$3 million aggregate for commercial general liability and $1 million combined single limit for commercial automobile liability. Contractors must also maintain workers’ compensation insurance at statutory limits and comply with federal and state employment laws including Title VI and VII of the Civil Rights Act, the Americans with Disabilities Act, Section 504, and Utah’s Executive Order 2019-1. Additional mandatory certifications include participation in E-Verify for all Utah-based employees, compliance with Utah’s anti-boycott statute regarding Israel, and certification that no forced labor products or technology

General Info

Utah seeks contractor to expand West Valley campus with elementary and secondary additions, auditorium, and optional kitchen by August 2027.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

6

APA 2026-WW2-EXP RFP Evaluation Score Sheet

PDF, High priority: read this firstaward
High

Attachment A - State of Utah Agency Standard Terms and Conditions

DOCX, High priority: read this firstcontract-terms-and-conditions
High

RFP 26-WV2-EXP West Valley Campus 2/3 Expansion CM/GC Services

PDF, High priority: read this firstrfp
High

Vendor Prerequisites - Agency RFP

PDF, High priority: read this firstvendor-prerequisites
High

Claim of Business Confidentiality Form

PDF, Low prioritybusiness-confidentiality-claim
Low

WVC3 Site Floor Plans 08-06-2026

PDF, Low prioritysite-plan
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
ContactsNo contact information available

Full Description

Show more
Issuing Procurement Unit: State of Utah Division of Purchasing Conducting Procurement Unit: Utah Charter Academies (UCA)
The purpose of this RFP is to enter into a contract to provide: General Contracting services and all materials necessary to complete a building expansion at our West Valley 2/3 campus. The project includes the elementary classroom addition (6 classrooms, 3 breakout classrooms, and restrooms - Phase 1, must open August 2027), secondary classroom addition (Band/Orchestra/Dance/Drama, with the Drama room doubling as a black box theater), the auditorium addition with support spaces, and the lunch kitchen building shell bid as an alternate. Work will run in two overlapping phases as described in the Summary of Work.
It is anticipated that this RFP will result in a single contract award to the responsive and responsible vendor with the highest score justified by the procurement code.
Length of Contract: Through project completion.
Vendor must guarantee its pricing for 6 months.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

4 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement