Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on July 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

26RFP150795K-JAJ Friendship Pump Station Progressive Design/Build

Closed
PE-66096-NONST-2026-000000188State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 11 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

Fulton County, Georgia is soliciting proposals for Phase I of the Friendship Pump Station Progressive Design Build project, which involves the design and construction of a new pump station and associated force main to serve the sewer drainage basin bounded by South Fulton Parkway, Cochran Mill Road, Cedar Grove Road, and Rivertown Road. The project also includes the construction of the Cochran Road Pump Station by Minerva USA, located near 5405 Cochran Mill Road, which will convey sewage flows to the main Friendship Pump Station. Both pump stations will discharge effluent into the Cedar Grove Pump Station and the Jones Road interceptor sewer, where a tee, valve, and manifold will be installed to accommodate future expansion. The invert elevation at the Friendship Pump Station has been specifically designed to allow gravity-fed inflow from both the northern and western sides of the wet well, optimizing hydraulic efficiency. The solicitation, numbered PE-66096-NONST-2026-000000188, was posted on July 8, 2026, with responses due by August 12, 2026, and is being managed by the Fulton County Purchasing Department under the leadership of James Jones, APA, who serves as the primary point of contact.

General Info

Fulton County seeks design-build for Friendship and Cochran Mill pump stations connecting to Cedar Grove and Jones Road sewers.

Documents

1

RFP 26RFP150795K-JAJ Friendship Pump Station Progressive Design/Build

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Fulton County Purchasing Department
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Fulton County, Georgia "County" This is Phase I of The Friendship Pump Station Progressive Design Build(FPS) . The FPS, which includes the associated force main, will serve the sewer drainage basin between South Fulton Pkwy, Cochran Mill Road, Cedar Grove Road and Rivertown Road. An Additional pump station, known as Cochran Road Pump Station (CRPS), will be built by Minerva USA near 5405 Cochran Mill Rd, that will convey flows to FPS. Both FPS and CRPS flows will be discharged to the Fulton County Cedar Grove Pump Station and to the Jones Road interceptor sewer where a tee, valve and manifold shall be installed for future connections. The invert Elevation at FPS will be set to allow the gravity system to enter from both northern and western sides of the wet well.

More opportunities from Georgia → Fulton County Purchasing Department

Same awarding agency

NAICS: 238910
New
SLED
26ITB0921226K-CRB Abatement & Demolition Services for Fulton County Jail Project
Solicitation # 26ITB0921226K-CRB
Fulton County, Georgia, is soliciting bids for solicitation number 26ITB0921226K-CRB to provide abatement and demolition services for the Fulton County Jail project. The scope of work involves the demolition of three specific locations: the Fulton County Accountability Court, Jefferson Place Transition Housing, and the Bellwood Annex. The project covers approximately 32.86 acres, with 3.30 acres of disturbed area, and requires the removal of buildings, foundations, utilities, and pavement. A critical component of the contract is the identification, abatement, and lawful disposal of hazardous materials, including asbestos-containing materials and lead-based coatings, in compliance with NESHAP, OSHA, and GA EPD regulations. The final objective is to create a proposed green space for a future facility, which includes grading and restoring disturbed areas with topsoil and grass seed. The contract will be awarded to the lowest responsive and responsible bidder based on an evaluation of price, technical experience, and financial capacity. Bidders must attend a mandatory guided site visit on November 10, 2026, and submit their sealed bids by November 20, 2026. Required submissions include a bid bond for five percent of the bid amount, as well as various certifications and disclosure forms. The successful contractor must provide performance and payment bonds for 100 percent of the bid and utilize the B2GNow software for payment reporting. Work is to commence within ten days of a notice to proceed, which may be issued within 120 days of contract execution. All work is subject to inspection by the Construction Manager to determine substantial and final completion.
Site Preparation Contractors

POSTED

1 day ago

DEADLINE

in 22 days
View Details
NAICS: 339995
SLED
26ITBC1704727C-JH Disaster Bags
Solicitation # 26ITBC1704727C-JH
Fulton County, Georgia, through its Department of Purchasing and Contract Compliance, is seeking a qualified vendor to provide medium weight disaster bags for the Medical Examiner's Office on an as-needed basis. These bags are used for the secure containment and transportation of decedents during routine operations, disasters, and mass-fatality incidents. The requirements include adult bags measuring 94 by 36 inches with a minimum load capacity of 300 pounds, as well as pediatric and oversized jumbo options. All products must be new, free from defects, and compliant with OSHA 29 CFR 1910.1030 standards for the containment of bloodborne pathogens. Packaging specifications require individual wrapping or polybagging, and items must be resistant to temperature extremes encountered during storage and transport. The contract will be awarded to the single lowest responsive and responsible bidder based on the total cost amount. Evaluation criteria include the completeness of the bid, the bidder's professional standing, financial stability, and past performance. Successful vendors must maintain commercial general liability insurance of 1 million dollars per occurrence and automobile liability insurance of at least 500,000 dollars. Payments are set at Net 30 days, and the awarded vendor must be registered in the County's Vendor Self Service System. Bids must be submitted electronically via BidNet Direct by November 17, 2026, and must include a completed bid form, manufacturer documentation, and a promise of non-discrimination.
Burial Casket Manufacturing

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS