Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Justice was posted on September 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

26Z5AR6 - REPLACE INTERIOR FINISH

Closed
15B50126PR000152Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT
Solicitation # W912PM279A001
The U.S. Army Corps of Engineers is issuing a draft program solicitation for the renovation of Hangar 750 at Pope Army Airfield, Fort Bragg, North Carolina. This project supports an Air Force Special Operations Command squadron mission and involves the comprehensive architectural and MEP build-out of ground floor aircraft maintenance bays, the integration of exterior hangar doors, and the construction of second-floor administrative and high-security operational spaces. The scope includes the installation of Level 2 wet-pipe fire suppression, intrusion detection systems, electronic access control, and full furniture, fixtures, and equipment packages. This procurement is conducted as an Other Transaction Agreement under 10 USC 2808a, meaning it is not subject to the Federal Acquisition Regulation. The project follows a Progressive Design-Build approach divided into two stages: Phase 1 focuses on design and pre-construction services, while Phase 2 covers final design and construction via a Fixed Price model based on a negotiated Guaranteed Maximum Price. The government has established an affordability cap of 35 million dollars as a material requirement, and the selected firm must be capable of providing performance and payment bonds of at least 35 million dollars. Selection is based on a qualifications-based methodology involving a two-step process: an initial evaluation of White Papers followed by Pitch Presentations for a target of three highly qualified teams. All team members must be registered in the System for Award Management with a valid Unique Entity Identifier. Additionally, the successful Design-Builder must comply with Cybersecurity Maturity Model Certification (CMMC) requirements as codified in 32 CFR Part 170, including a positive self-assessment and signed attestation of security controls. Submissions must be made through the PIEE Solicitation Module.
W074 Endist Wilmington

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
Federal
Z1DA-- 460-26-004 | Wilmington VAMC Roof Replacement | NCO 4 Construction East (VA-26-00029152)
Solicitation # 36C24426B0015
Solicitation 36C24426B0015 is a firm-fixed price construction contract issued by the Department of Veterans Affairs Network Contracting Office 4 for the removal and replacement of Roof 3D, the Physical Therapy Roof, Roof 10, and Roof 11 at the Wilmington VA Healthcare System in Delaware. The project has an estimated magnitude between $250,000 and $500,000 and is set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The scope of work includes demolition of existing roofing and insulation, installation of 60 Mil Elevate RubberGard EPDM LS-FR white low-slope fire retardant roofing material or equivalent, and the repair of roof drains. The completed installation must meet high wind zone design requirements and include a minimum 20-year warranty against leaks. Award will be granted to the responsive and responsible bidder offering the lowest price. Eligible bidders must be registered in SAM, VETCERT, and the VETS-4212 database. The contractor is required to provide performance and payment bonds and adhere to Davis-Bacon Act Wage Determination DE20260008. Strict safety standards are mandated, including the presence of an OSHA-certified competent person on-site and 10-hour OSHA certification for all employees. Performance must begin within 10 calendar days of award and be completed within 30 calendar days, with work performed Monday through Friday from 7:00 AM to 5:00 PM. Following multiple amendments, the final bid opening was rescheduled for October 21, 2026.
244-NETWORK Contract Office 4 (36C244)

POSTED

about 4 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
Federal
Source Sought 36C25627Q0020_564-610 NIPMHB Nurses Call, Boilers, and Rigid Vinyl Sheet
Solicitation # 36C25627Q0020
The Department of Veterans Affairs, through Network Contract Office 16, is conducting market research via a Request for Information to identify qualified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and Veteran-Owned Small Businesses (VOSB) for a construction project at the Veterans Health Care System of the Ozarks in Fayetteville, Arkansas. The project, identified as Project 564-610, involves repairs and installations at the New Inpatient Mental Health Building (Building 49). The scope of work includes the installation of two electric backup boilers with associated piping, pumps, and electrical work, the application of Inpro Palladium Rigid Vinyl Sheet, and the installation of 3/8 inch interior tempered safety glazing for nurse station partitions. The government anticipates awarding a single, firm-fixed-price contract with an estimated magnitude between 250,000 and 500,000 dollars. The period of performance is 210 calendar days from the Notice to Proceed. All work must be performed without disrupting medical center operations and must adhere to the latest NEC, NFPA, and OSHA standards, including the development of an Infection Control Risk Assessment. Personnel are required to have a negative TB test within 90 days of starting work and a minimum OSHA 10 certification. Interested firms under NAICS code 236220 must provide a capability statement, proof of ability to obtain performance and payment bonds up to 500,000 dollars, and details of three relevant recent projects. Responses must be submitted to the Contracting Officer by November 3, 2026.
256-NETWORK Contract Office 16 (36C256)

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 10 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This firm-fixed-price contract, designated as a total small business set-aside, tasks the awarded contractor with the abatement, demolition, and disposal of water-damaged interior finishes at the Federal Correctional Institution (FCI) Bastrop in Texas. The project focuses on four specific buildings: the Chapel (400), Psychology (500), Education (600), and Laundry (900). The scope includes the removal of approximately 23,500 square feet of gypsum wallboard, 5,500 square feet of gypsum ceilings, 1,100 square feet of suspended ceiling systems, and 1,200 square feet of wood paneling. The contractor is responsible for all labor, materials, equipment, and disposal, ensuring that the spaces are left clean and ready for future restoration. Notably, the project is limited to abatement and demolition only; no build-back or restoration work is included. The contractor must adhere to strict safety and environmental standards, including OSHA, EPA, and BOP regulations, particularly when handling potential hazardous materials such as mold, lead-based paint, and asbestos. Required measures include the use of polyethylene barriers, negative air machines, and HEPA filtration to prevent cross-contamination. The period of performance is 210 calendar days from the notice to proceed, with liquidated damages set at 1,412.16 dollars per day. Due to the secure nature of the facility, all personnel must undergo criminal history background checks and adhere to specific institutional work hours, tool inventory protocols, and security badging requirements. Payment will be processed through the FCI Bastrop Business Office via monthly progress invoicing.

General Info

Contractor to replace water-damaged interior finishes and abate hazards at FCI Bastrop, Texas.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Bastrop, TX, 78602, USA

Set-Aside

SBA

Documents

8

15B50126Q0000014 Amendment 0001 - Replace Interior Finish

PDF, High priority: read this firstamendment
High

26Z5AR6 Replace Interior Finish - Questions and Answers

DOCX, High priority: read this firstq-and-a
High

26Z5AR6 Replace Interior Finish - Questions and Answers (Updated 9/1/2026)

DOCX, High priority: read this firstq-and-a
High

Extension Notice – bid due date extended to Sept 3, 2026

DOCX, High priority: read this firstamendment
High

Solicitation 15B50126Q00000014 Replace Interior Finish

PDF, High priority: read this firstrfq
High

SOW 26Z5AR6 Replace Interior Finish at FCI Bastrop

PDF, High priority: read this firstsow
High

TX20260285 Wage Determination for Bastrop County, Texas

PDF, High priority: read this firstwage-determination
High

BP-A0660 Criminal History Check Authorization Form

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Sep 1, 2026 to Sep 4, 2026.

Deadline changed

Response deadline changed from Sep 4, 2026 to Sep 3, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Justice → Fci Bastrop
Contacts2 people available
OfficeBASTROP, TX, 78602, USA
Office AddressBASTROP, TX, 78602, USA

Full Description

Show more

Statement of Work Federal Bureau of Prisons Federal Correctional Institution (FCI) Bastrop, Texas Project # 26Z5AR6 Replace Interior Finish


Completed quotes may be submitted electronically via e-mail to l4mitchell@bop.gov.  All responsible sources must submit a typed quote on the attached specification sheet (RFQ, – SF 1449 15B50126Q00000014 Replace Interior Finish), which will be considered for award. Do not submit multiple quote request.


1. SPECIFICATIONS:


A. INTRODUCTION


The Federal Correctional Institution at Bastrop, located at 1341 Highway 95 North, Bastrop, TX 78602, has identified four (4) buildings with severe interior damage resulting from prolonged water intrusion caused by long-term roof leaks. The continued moisture exposure has resulted in deterioration of gypsum wall systems, ceiling assemblies, suspended ceiling systems, and wood paneling. These conditions may present unsanitary and potentially hazardous conditions, including the possible presence of microbial growth and other hazardous materials. Abatement is required to protect occupant health and prepare the spaces for future restoration. The Contractor is strongly encouraged to attend the pre-bid site visit identified in the solicitation, to assess existing conditions that may affect performance of contract work. 


*8/18/2026 - WAGE DETERMINATION FOR BASTROP COUNTY, TX HAS BEEN ADDED IN THE ATTACHMENTS SECTION.


**There will be a site visit at FCI Bastrop, 1341 Highway 95 N, Bastrop, TX 77868 on Wednesday, August 26th at 1:00 PM CST. If you wish to attend, please email the points of contact in the solicitation and include background check paperwork for everyone wishing to enter available in the attachments section. Please do not digitally sign your name on the background check form, a physical wet signature is required. Background check paperwork is due on Thursday, August 20th at 1:00 PM CST. Please have a valid state or federal ID. 


B. SCOPE OF WORK


Awarded Contractor shall furnish all labor, materials, equipment, supervision, and disposal necessary to abate, remove, and properly dispose of water-damaged interior finishes, including materials that may be impacted by hazardous or regulated substances, in accordance with this Statement of Work.


C. CONTRACTOR’S REQUIREMENTS


1. The Contractor will be required to comply with all applicable federal, state, and local laws and regulations, including OSHA, EPA, and BOP safety, health, and security requirements.


2. The Contractor shall coordinate work activities with FCI Bastrop staff and or Contracting Officer’s Representative (COR).


3. The Contractor shall assume responsibility for identifying, controlling and properly handling hazardous materials encountered during the performance of this work, as specified herein.


4. Work shall be conducted in a manner that protects staff, inmates, visitors, and adjacent occupied spaces.


C.1 Hazardous Material and Environmental Compliance


C.1.1 General


1. Due to the age of the buildings and the duration of water intrusion, hazardous materials may be present, including but not limited to:


- Mold or microbial contamination


-Lead-based paint


-Asbestos-Containing Materials (ACM)


-Other regulated building materials.


2. The Contractor shall comply with all applicable requirements of OSHA, EPA and any other government regulatory agencies.


C.1.2 Mold and Microbial Contamination


1. The contractor shall implement appropriate engineering controls, including containment and negative air pressure with HEPA filtration, when removing materials impacted by mold or suspected microbial growth.


2. Removal shall be performed to a point of clean, sound, and dry substrate.


3. Remaining surfaces shall be HEPA-vacuumed and cleaned in accordance with industry-recognized remediation practices.


4. The Contractor shall take reasonable measures to prevent cross-contamination during abatement.


C.1.3 Lead-Based Paint


1. Due to the age of the buildings, painted surfaces disturbed during demolition may contain lead-based paint.


2. The Contractor shall perform work in accordance with applicable OSHA and EPA lead safety standards.


3. The Contractor shall implement appropriate worker protection and dust control measures.


C.1.4 Asbestos-Containing Materials


1. The Government has conducted asbestos surveys of suspected building materials within the identified work areas. Testing was performed on materials reasonably suspected to contain asbestos, and the Government maintains documentation of all sampling results.


2. Based on testing performed to date, materials identified for removal under this Statement of Work are not known to contain asbestos.


3. If the Contractor encounters any material that differs from identified building material to be removed, the Contractor shall immediately stop work in the affected area and notify the COR prior to disturbing the material.


4. No material suspected of containing asbestos shall be disturbed, removed, or handled until the COR and FCI Bastrop Occupational Health & Safety Department staff have been consulted.


5. Failure to consult with the COR prior to disturbing questionable material may result in liability for unauthorized disturbance of regulated materials.


C.2 CONTAINMENT AND PROTECTION


1. The Contractor shall provide dust, debris, and hazard containment using polyethylene barriers, negative air machines, and HEPA filtration as required.


2. Adjacent occupied spaces, mechanical systems, and finishes shall be protected from contamination.


3. The contractor shall always maintain safe and secure egress routes.


C.3 ABATEMENT AND DEMOLIITION REQUIREMENTS


1. Gypsum Wallboard


a. Remove and dispose of approximately 23,500 square feet of ½-inch wallboard damaged by water intrusion and potential microbial contamination.


2. Gypsum Ceilings


a. Remove and dispose of approximately 5,500 square feet of gypsum ceiling systems, including associated framing and insulation where damaged.


3. Suspended Ceilings


a. Remove and dispose of approximately 1,100 square feet of suspended ceiling systems, including tiles, grid, hangers, and supports impacted by moisture.


4. Wood Paneling


a. Remove and dispose of approximately 1,200 square feet of water-damaged wood paneling, including furring strips and fasteners.


C.3.1 REFERENCE DRAWINGS


Attached reference drawings are provided for work requirements and the Contractor’s benefit. The Contractor is encouraged to visit the project work site prior to submitting a bid to confirm existing conditions and measurements of the demolition areas.


ATTACHMENT A - LOCATION PLAN


ATTACHMENT B – CHAPEL BUILDING 400


ATTACHMENT C – PYSCHOLOGY BUILDING 500


ATTACHMENT D – EDUCATION BUILDING 600


ATTACHMENT E – LAUNDRY BUILDING 900


C.4 WASTE HANDLING AND DISPOSAL


1. All waste materials, including potentially contaminated debris, shall be bagged, sealed, labeled, and transported in accordance with applicable regulations.


2. Disposal shall be performed at approved facilities.


3. Waste disposal manifest shall be provided to the COR upon request.


C.2 FINAL CLEANING


1. Perform final HEPA cleaning of all work areas.


2. Remove containment systems only after COR approval.


3. Leave all spaces clean and ready for restoration work.


D. UTILITIES


The FBOP will provide water and minimal electricity service (120V) but may not be in close proximity to the work site for small hand power tools including battery chargers. The contractor will provide all other equipment, supplies and materials needed to complete this project.


E. ACCEPTANCE AND CLOSEOUT


The Contractor shall notify the Contracting Officers Representative (COR) two (2) working days prior to the final testing and/or certification so that arrangements can be made to have BOP required staff available to observe inspection. A complete plan detailing any required testing procedures must be submitted in advance for final check out and testing of work.


F. WARRANTY


The Contractor warrants that work performed under this contact conforms to workmanship performed by the contractor or any subcontractor or supplier at any time.


F. HOUSEKEEPING AND MATERIAL DISPOSAL


The Contractor will be responsible for ensuring the premises are always kept clean and free from accumulations of waste materials and rubbish. The contractor will remove all debris, scrap, and rubbish from the work area daily. Surplus materials and all equipment shall be promptly removed from the site upon completion of the work. The Contractor shall be responsible to remove all debris and waste materials from the job site at FCI Bastrop site upon conclusion and acceptance of the project. These items must be disposed of in accordance with all Federal, State, and local laws.


G. SUBMITTALS


1. The contractor shall provide written submittals to the COR describing recommended equipment within (15) days from receiving the notice to proceed, for approval.


2. All security clearance paperwork/documentation shall be submitted to the COR a minimum of (14) working days prior to the start of work.


3. The Contractor shall prepare and provide to the COR for approval, PDF file specifications of all material and products prior to their use. Submittals will be prepared as PDF package and transmit to Government by sending via email. Contractor should also provide three (3) copies of the Safety Data Sheets (SDS) on all materials and substances that may be used during the project. In the event the material is not approved by the Safety Manager, it shall be the responsibility of the Contractor to locate and procure an alternative product.


4. For security and safety purposes, forty-eight (48) hour advance notice in writing, prior to disruption to the system must be given to the Contracting Officer and COR.


5. Provide complete narrative descriptions of all system operations.


6. The contractor shall provide an Installation Certification of the completed and tested systems that contains an affidavit signed by the contractor and manufacturer’s representative, notarized, certifying that the complete systems meet the contract requirements and are fully operational per the manufacturer's recommendations.


7. Any deviations from this Statement of Work will be considered a Change Order Request and must be authorized through the institution’s Contracting Officer prior to the implementation of the requested change.


8. It is the Contractor’s responsibility to repair and/or replace any Government property damaged by contractors/subcontractors’ employees. Damage will be corrected and restored to previous conditions at no cost to the Government.


9. It shall be the Contractor’s responsibility for obtaining all measurements and data requirements to comply with manufacturer’s installation recommendations. All installations must be in accordance with product manufacture’s recommendations.


II. CONTRACTOR SECURITY/WORKING REGULATIONS


A. Work Hours:


1. Work Hours for the contractor are 7:30 AM – 4:00 PM (see various site work hour clarification below), Monday - Friday, excluding weekends and federal holidays. Any work required to be completed at any other time than noted above must be requested in writing to the COR five (5) working days prior to the start of the work. In the event of any equipment being replaced that would result in downtime of the normal orderly running of the institution, alternate work hours may be authorized in accordance with the time frame stated above.


2. Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, his employees, and his subcontractors of the working hours and conditions in at the facility, as working hours may not constitute a full eight-hour workday. The Government assumes no responsibility to the Contractor nor to any of his subcontractors for shorter hours due to institutional emergencies or entry and/or exit of workers necessitated by normal institution routines.


3. The Contractor shall limit its use of the premise to the work indicated, to allow for Government occupancy and use. During the entire construction period, the Contractor shall coordinate use of the premises for construction operations with the FBOP COR (Contracting Officer Representative).


4. All visitors to the construction site shall register with FBOP site officials. The contractor should not allow employees to have personal visitors on site.


5. The project site will be open to the Contractor Monday through Friday, with the exception of federal holiday, for the duration of the project. The project schedule is to be based on a normal 40-hour work week. The Contractor shall establish a normal week schedule for the duration of the project.


6. Work outside the secure perimeter institution will be allowed between the hours of 7:00 AM to 4:00 PM. This will allow the Contractor’s work force to arrive on-site in the morning to prepare for entering the secure perimeter of the institution. It will allow the Contractor’s work force to button up their laydown / staging area after exiting the secure perimeter at the end of the workday.


7. Work inside the secure perimeter of the institution will be allowed between the hours of 7:30 AM to 3:00 PM. The Contractor’s workforce will be allowed to enter the Rear Gate at approximately 7:30 AM each workday. At this time FBOP staff will begin personnel and tool security check-in procedures. Once the check in procedures are complete, the Contractor will be escorted by FBOP staff to the work site. The rear gate closes at 3:15 PM, therefore, the Contractor’s work force will be escorted back to the rear gate/front lobby by FBOP staff no later than 2:45 PM, to allow enough time for the completion of security check-out procedures prior to exiting the secure perimeter.


B. Delivery of Materials:


1. All materials/equipment required for work on this project are required to be processed by the Contractor and coordinated with the institution COR for temporary storage.


2. Any related deliveries which are directly shipped to the contractor can be received between the hours of 7:00 a.m. to 12:00 p.m., Monday through Friday, excluding Federal Holidays. At no point will a Bureau of Prisons (BOP) staff member receive or sign for a delivery if the contractor or his representative is not present to verify and accept the delivery.


3. Under no circumstances will FCI Bastrop or its staff be responsible for the acceptance of any Contractor or company deliveries. The contractor shall be responsible for providing their own means of loading and unloading contractor material or equipment.


C. Storage of Materials and Equipment:


1. Materials may be stored on site at a mutual agreeable location designated by the COR. Tools shall not be stored on site and must be brought in daily by the contractor unless a suitable arrangement between the contractor and FCI Bastrop Executive staff are agreed upon.


2. All tools will be inventoried prior to beginning work and will be inventoried back in to ensure accurate accountability when leaving at the end of each workday.


3. Materials cannot be stored at a height that would create a fall hazard. All tools will be inventoried prior to entering the Institution. At the start of each workday all tools will be inventoried in on a daily tool inventory sheet and at the end of the workday, all tools will be inventoried back out to ensure accurate accountability of all tools at the end of each workday.


4. All contractor owned extension cords that will be used during the project, regardless of length, shall be in good condition with no broken outer Insulation.


D. Security Clearance/Contractor Badges:


1. The contractor shall provide the COR with all the necessary security clearance documents for all contractors and subcontractor employees accessing the institution and be security cleared for badging within 14 days of receiving the Notice to Proceed, as stated above. Security clearance documents will only be accepted from the prime contractor. If submitted by a sub-contractor, they will be rejected. It is the prime contractor’s responsibility to review security clearance submissions to ensure they are complete.


2. In the event a contractor or subcontractor employee cannot pass the security clearance process, it will be the contractor’s responsibility to provide another candidate. By law the FBOP cannot, and will not, release any information to the contractor concerning the nature of why a contractors or subcontractor employee was not able to pass the security clearance process.


3. All contractors/subcontractors working at FCI Bastrop will be issued and required to wear a picture ID/contractor badge provided by the institution. For security reasons, the badge will be worn in a visible manner as directed by the COR.


4. All contractors and subcontractor employees will provide a check list of all employees on site each day to the COR, verifying the number of workers on site each day and that all workers are approved to be on site.


E. Safety and Personal Protective Equipment:


All contractors and employees shall have and wear the required personal protective equipment (PPE) prescribed by industry standards at all times while on the job site. It is the responsibility of the contractor to provide all PPE equipment. Should a system require Lock-out/Tag-out, the system will be required to have both Contractor and FCI Bastrop locks on the isolation point to prevent shock. All Lock-out/Tag-out procedures will follow the institution Lock-out program.


END STATEMENT OF WORK 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS