Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The Texas Workforce Commission is soliciting proposals for the repaving and restriping of all asphalt parking lot and driveway areas at the Criss Cole Rehabilitation Center in Austin, Texas. The scope of work includes selective site demolition, paving removal, asphalt and concrete paving, flexible base courses, and the installation of pavement markings, signage, and handicap ramps. All renovations must comply with state and federal accessibility standards and will be executed in three separate phases. The project includes a 200,000 dollar Owner's Allowance and is subject to liquidated damages of 300 dollars per day.
The successful contractor must adhere to strict insurance and bonding requirements, including a 2 million dollar Commercial General Liability policy and a 1 million dollar Umbrella Liability policy. Bid and payment bonds are required for contracts exceeding 25,000 dollars. Compliance with the Davis-Bacon Act, the Copeland Anti-Kickback Act, and the Contract Work Hours and Safety Standards Act is mandatory. Additionally, vendors must submit a HUB Subcontracting Plan and a VetHUB plan, with a specific goal of 8.23 percent for special trade construction. All key personnel must undergo criminal background checks, and those accessing state systems must complete certified cybersecurity training.
General Info
TWC seeks proposals for repaving and restriping the Criss Cole Rehabilitation Center parking.
PDF, High priority: read this firstsubcontracting-plan
HighAI Summary for 3202600121 CCRC Resurfacing Parking Lot - VetHUB Subcontracting Plan: A State of Texas subcontracting plan form for solicitation 3202600121 (CCRC Resurfacing Parking Lot) issued by the Texas Workforce Commission. The document outlines requirements for vendors to demonstrate good faith efforts in recruiting certified Veteran Heroes United in Business (VetHUB) subcontractors, specifying a goal of 8.23% for special trade construction contracts. It includes sections for respondent information, self-performance declarations, and detailed subcontracting opportunity listings.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 - CCRC Parking Lot Resurfacing (3202600121): Addendum #2 issued on 11/5/2026 for the Texas Workforce Commission's RFP No. 3202600121 regarding CCRC Parking Lot Resurfacing. This document extends the response submission deadline to November 10, 2026, at 10:00 AM Central Time and requires a signed acknowledgement for submission.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment 3 - Supplementary General Conditions: This document outlines the Supplementary General Conditions for a contract, specifically detailing the requirements for umbrella liability insurance (100% of the Contract Sum) and establishing liquidated damages at a rate of $300.00 per day.
PDF
PDF, High priority: read this firstsupporting-documents
HighAI Summary for IFB No. 3202xxxx - HUB Subcontracting Plan Guide: This document provides instructions and a checklist for completing the Historically Underutilized Business (HUB) Subcontracting Plan (HSP) for Texas Workforce Commission IFB No. 3202xxxx. It specifies that the HSP is a pass/fail requirement and failure to submit it will result in proposal rejection. The guide outlines good faith effort requirements, including notification timelines for HUB vendors and trade organizations, and identifies the TWC HUB goal as 26.0% for other services contracts, specifically targeting interpreter, translation, and temporary personnel services.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 3202600121 - Attachment 11: Insurance Requirements: Attachment 11 to RFP No. 3202600121 for CCRC Parking Lot Resurfacing, dated December 2025. This document outlines the mandatory insurance and bonding requirements for the successful respondent, including minimum coverage limits for Commercial General Liability ($2M), Workers Compensation/Employer Liability ($1M), Comprehensive Automobile Liability ($1M), and Umbrella Liability ($1M). It specifies requirements for certificates of insurance, additional insured status for TWC, and subrogation waivers.
XLSX
XLSX, High priority: read this firstspecifications
HighAI Summary for RFP 3202600121 CCRC Parking Lot Resurfacing - Form 2 Cost Response: A cost response form for RFP 3202600121 regarding CCRC Parking Lot Resurfacing. The document provides a pricing table for respondents to list costs for bonding, insurance, mobilization, materials, labor, and other itemized expenses, including a $200,000 Owner's Allowance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 3202600121 - Criss Cole Rehabilitation Center Parking Lot Repaving Project Drawings: Construction documents and project drawings dated September 11, 2026, for the repaving and restriping of asphalt parking and driveway areas at the Criss Cole Rehabilitation Center (RFP 3202600121). The file includes a symbols legend, index of drawings (civil and general), general construction notes, and standard notes regarding clearing and grubbing.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 3202600121 - Form 1: Execution of Response: This document is Form 1 (Execution of Offer) for RFP No. 3202600121 regarding CCRC Parking Lot Resurfacing, dated February 2026. It serves as the formal response submission page where the respondent acknowledges and agrees to the terms and conditions, lists any exceptions, certifies minimum qualifications, and provides organizational and contact information, including Texas identification and preference claims.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for RFP 3202600121 - Form 3 References: A mandatory reference form (Form 3) for RFP 3202600121 regarding CCRC Parking Lot Resurfacing. It requires respondents to provide at least three government references from the last three years, details on cancelled contracts, and signed liability releases for each reference provided.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 3202600121 - Form 4 Financial Questionnaire: A financial questionnaire (Form 4) for RFP No. 3202600121 regarding CCRC Parking Lot Resurfacing. The document requires respondents to provide details on bankruptcy history, loan defaults, ownership structure, company founding date, headquarters location, employee count, and previous contracts with Texas state agencies.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Texas Workforce Commission - Uniform General Conditions (Version 12/3/2024): This document outlines the Uniform General Conditions for construction contracts managed by the Texas Workforce Commission (TWC), version dated December 3, 2024. It establishes the legal and administrative framework for projects, including definitions, compliance with laws, bonding requirements, contract administration, payment terms, change order processes, construction schedules, warranties, and dispute resolution.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for TWC RFP 3202600121 - Addendum #1: CCRC Parking Lot Resurfacing: Addendum #1 issued on 10/06/2026 for RFP 3202600121 regarding the CCRC Parking Lot Resurfacing for the Texas Workforce Commission. This document provides materials from the Pre-Solicitation Conference held on 09/30/2026, including the attendee list, presentation slides, and recording links. It also outlines the RFP structure, submission requirements, and the schedule of events, noting a final proposal deadline of November 06, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for TWC RFP 3202600121 - CCRC Parking Lot Resurfacing Project Manual: Project Manual dated September 11, 2025, for the Texas Workforce Commission (TWC) CCRC Parking Lot Resurfacing project (RFP 3202600121). The document includes the table of contents for procurement and technical specifications, a summary of work for repaving and restriping in three phases, accessibility compliance requirements, site usage restrictions, and price and payment procedures.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for TWC Terms and Conditions - Construction, Architect, & Engineer Version (1-28-2026): Standard terms and conditions for the Texas Workforce Commission (TWC) specifically for construction, architect, and engineer procurements. Dated January 28, 2026, the document outlines solicitation response requirements, pricing firmness, tax exemptions, and general conditions including liability claims under Texas Government Code and Public Information Act compliance.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for TX20260271 - Prevailing Wages Travis County: General Decision Number TX20260271 (dated 01/02/2026) specifies the prevailing wage rates and fringe benefits for building construction projects in Travis County, Texas. It includes detailed hourly rates for various trades such as electricians, carpenters, and operators, and references compliance with Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage.
XLS
XLS, Low priority2 pages · other
LowAI Summary for Attachment 9 - Progress Assessment Report: A template for the Prime Contractor Progress Assessment Report used to document monthly compliance with the HUB Subcontracting Plan (HSP). It includes fields for tracking payments to HUB and non-HUB subcontractors, contract numbers, and agency information.
PDF
PDF, Low priorityproposal-form
LowAI Summary for RFP 3202600121 - CCRC Parking Lot Resurfacing Title Page: This document is a title page template (Form 5) for a proposal submission in response to Texas Workforce Commission Request for Proposal No. 3202600121 for CCRC Parking Lot Resurfacing.
PDF
PDF, Low priorityother
LowAI Summary for TWC Direct Deposit Form Instructions: Instructions for the Texas Workforce Commission (TWC) Substitute W-9 and Direct Deposit Form. The document provides detailed guidance on completing the form, including legal name requirements, taxpayer identification, ownership types, and IRS exempt payee codes for payment processing.
PDF
PDF, Low priorityother
LowAI Summary for TWC HUB Progress Assessment Report (PAR) Overview: Instructional guide for contractors on how to complete and submit the monthly Progress Assessment Report (PAR) as required by the Texas Workforce Commission HUB Subcontracting Plan. It outlines reporting requirements for HUB and Non-HUB subcontractors and specifies submission deadlines and contact information.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseSolicitation
Posted
Solicitation
Response Deadline
Submission deadline
Response Deadline
Ready to pursue this opportunity?
Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.
TWC is procuring services to repave and restripe all asphalt parking lot areas located at Criss Cole Rehabilitation Center to include handicap ramps, signage, stripinig, and minor sidewalk repairs.