Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

36-inch Ductile Iron Pipe (DIP) Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Cobb County-Marietta Water Authority involves the installation of a 36-inch water main. The scope of work includes the excavation and removal of existing 36-inch PCCP and DIP, followed by the installation of 36-inch zinc-coated, double bonded-joint, and double poly-wrapped DIP. The project concludes with a tie-in to the existing 36-inch DIP water main to deliver a fully operational system. Qualified contractors must possess a State of Georgia Utility Contractor license and meet specific pre-qualification requirements for water mains 36 inches or larger. This opportunity is categorized under NAICS code 237110. There is no specified set-aside status for this contract.

General Info

Subcontract for installing a 36-inch water main for Cobb County-Marietta Water Authority.

Documents

This scope was carved out of PE-66365-NONST-2028-000000039.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

West Side Loop Section 3 36-inch Water Main Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 32 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom West Side Loop Section 3 36-inch Water Main Replacement
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Cobb County-marietta Water Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs 36-inch water main for prime contractors on Cobb County-Marietta Water Authority projects. Excavates and removes existing 36-inch PCCP and DIP, installs 36-inch zinc-coated, double bonded-joint, and double poly-wrapped DIP, and executes a tie-in to the existing 36-inch DIP water main. Requires State of Georgia Utility Contractor license and pre-qualification for 36-inch+ water mains. Delivers a fully installed and tied-in water main system.

Similar Contracts

Same NAICS industry code

More opportunities from Georgia → Cobb County-marietta Water Authority

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS