Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

36 MUNS Highline Docks (GUAM)

Closed
FA524024QM085Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333922
SLED
Asphalt Windrow Elevator
Solicitation # 601440000053907
The Texas Department of Transportation (TxDOT) is soliciting proposals for the procurement of one heavy-duty asphalt windrow elevator designed for high-production road paving. The equipment must be compatible with a Dynapac paver D30T and feature a front dolly wheel system to distribute weight, maintain consistent rolling elevation, and attach directly to the paving tractor to prevent material segregation. The solicitation requires the unit to be in current commercial production, with a warranty covering 100 percent of parts and labor for 12 months or 1,200 hours of operation. Delivery is required to Abilene, Texas, and the unit price must include all shipping and transfer costs. Eligible respondents must be official authorized dealers or distributors with at least three years of experience providing asphalt removal and application systems within the last five years. Proposals must be submitted through the Euna Procurement portal by October 30, 2026, and must include ten specific sections, including a pricing schedule in Excel format, vendor qualifications, and certifications regarding the Texas Family Code and procurement compliance. Evaluation is based on a pass/fail review of document inclusion and vendor performance ratings, followed by a best-value determination. Payments are processed via warrant or direct deposit within 30 days of receiving a correct invoice.
Texas Department of Transportation

POSTED

20 days ago

DEADLINE

in 10 days
NAICS: 333922
SLED
CP25013
Solicitation # CP25013
The Lake Charles Harbor and Terminal District is soliciting proposals for the procurement of one new portal mounted traveling import hopper to be installed at Bulk Terminal No. 1 in Sulphur, Louisiana. The contract includes an option for the owner to purchase an additional unit within 12 months. Proposals are due by 4:00 PM CDT on November 6, 2026, and must be submitted both electronically in PDF and Excel formats and as two bound hard copies. The selection process is based on a 125-point evaluation system, though the highest score does not guarantee a contract award. The selected contractor must provide the physical hopper, related parts, and a spare parts allocation equal to at least 5 percent of the purchase price. Key requirements include the use of in-house engineers, English language proficiency, and the ability to provide local sales support in the Southeast United States. Rigorous packaging standards are mandated to protect equipment from sea spray and ultraviolet exposure during transit, and all safety signage must comply with NFPA 70E. Financial and legal protections include a 5 percent bid deposit, a 100 percent performance bond, and a warranty bond required for the final 15 percent payment. Payment is contingent upon the submission of applications for payment, partial lien waivers, and a final certificate confirming the equipment is free of all encumbrances. The project involves a phased acceptance process, including pre-shipment certification and final verification of commercial operations by an engineer, with the owner reserving the right to use a third-party inspection agency.
Port of Lake Charles

POSTED

21 days ago

DEADLINE

in 17 days

General Info

NAICS

333922 - Conveyor and Conveying Equipment Manufacturing

Place of Performance

Yigo, GU, 96929, USA

Set-Aside

SBA

Documents

4

Amendment 4 - RFQ FA524024QM085 36 MUNS Highline Docks

PDF, High priority: read this firstamendment
High

Attachment 1 - Salient Characteristics for 36 MUNS Highline Docks

PDF, High priority: read this first4 pages · specifications
High

FA524024QM085 - 36 MUNS Highline Docks Q&A

PDF, High priority: read this first1 page · q-and-a
High

Solicitation FA524024QM085 - Provisions and Clauses

PDF, High priority: read this first42 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jun 28, 2024 to Aug 16, 2024. The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Aug 16, 2024 to Aug 23, 2024.

Deadline changed

Response deadline changed from Aug 23, 2024 to Aug 28, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5240 36 Cons Lgc
Contacts2 people available
OfficeAPO, AP, 96543-4040, USA
Office AddressAPO, AP, 96543-4040, USA

Full Description

Show more
AMENDMENT 3 - SUMMARY OF CHANGES. This RFQ has been completely redefined. Please review the entire document before submitting quotes. (All amendments have been highlighted yellow in this document): Response date has been changed from 16 August to 23 August Attachment 1 has been revised Attachment 4 has been revised to reflect changes in Attachment 1 All other terms and conditions remain unchanged. AMENDMENT 2 - SUMMARY OF CHANGES. - Attachment 4- RFI Questions and answers for 36 MUNS Highline Docks has been added. Delivery date has been changed from 90 to 165 Days ARO All other terms and conditions remain unchanged.

More opportunities from Department Of Defense → FA5240 36 Cons Lgc

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS